Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's Emergencies, disasters & outages information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. 

Legend:

unplanned

planned

September 2021

Jump to today
1 Sep - Wednesday
Water and sewerage

Unplanned - Water Interruption - Parkwood

1.00pm - 2.00pm

Streets affected: Jack Nicklaus Way

Cause: Repair fire hydrant

Ref: 1000800359

north

Water and sewerage

Unplanned - Water Interruption - Palm Beach

2.15pm - 6.15pm

Streets affected: Denawen Street

Cause: Repair water main

Ref: 1000802628

south

Water and sewerage

Unplanned - Water Interruption - Hollywell

Day 1 of 2

Streets affected: Clematis Avenue

Cause: Repair water main

Ref. 1000802746

Start time and date: 11.45pm 1 September 2021

Finish time and date: 6.00am 2 September 2021

north

Road closures

Planned - Temporary Road Closure - Ormeau

Day 227 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 107 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 105 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 81 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 79 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURES - Burleigh Heads

Day 78 of 79

Streets affected: Acanthus Avenue (full road closure with detour and traffic control, local traffic access only) between Sandpiper Drive and Gold Coast Highway

 

Also affected: Symonds Road and Diana Avenue

 

 

Start date: 16 June 2021

 

End date: 2 September 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate in the construction of a new roundabout, stormwater upgrade and new kerb/footpaths.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 72 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 49 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 44 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 36 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 32 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 31 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 26 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 23 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 21 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 21 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 21 of 22

Streets affected: Baileys Mountain Road (half road closure northbound with detour and traffic control) between Old Coach Road and Ruffles Road

 

 

Start date: 12 August 2021

 

End date: 2 September 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 21 of 21

Streets affected: La Spezia Court (full road closure with traffic control onsite) between Bundall Road and End of Street

 

 

Start date: 12 August 2021

End date: 1 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate the connection of a new sewer main for the development site.
 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin

Day 21 of 23

Streets affected: Duringan Street (half road closure with detour/local traffic access only - traffic control onsite) between Woodgee Street and Dandaloo Drive

 

Start date: 12 August 2021

End date: 3 September 2021

Duration: 7.00am - 5.00pm

Reason: To facilitate water service upgrade.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 21 of 22

Streets affected: Garrick Street (half road closure with traffic control – expect delays) between Marine Parade and Musgrave Street

 

Start date: 12 August 2021

End date: 2 September 2021

Duration: 7.00am - 3.00pm

Reason: To facilitate guardrail repairs and barrier installation.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 18 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 17 of 19

Streets affected: Jefferson Lane (reduced lanes with traffic control) between Seventh Avenue and Ninth Avenue

 

 

Start date: 16 August 2021

End date: 3 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate water service upgrade.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 17 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 17 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 17 of 19

Streets affected: Queensland Avenue (half road closure with detour -  traffic control onsite - expect delays) between Old Burleigh Road and Federation Avenue

 

Start date: 16 August 2021

End date: 3 September 2021

Duration: 7.00am - 5.00pm

Reason: To facilitate the installation of coloured surface works to the road pavement.
 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 15 of 19

Streets affected: Abraham Road (reduced lane with Police traffic control onsite – expect delays) between Aviation Avenue/Turnbull Drive and Days Road/Foxwell Road Signalised Intersection

 

Start date: 18 August 2021

End date: 5 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the replacement of a knocked down signal pole.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 15 of 21

Streets affected: Pimpama Jacobs Well Road (half road closure with traffic control – expect delays) between Wharf Road/Old Wharf Road and Village Boulevarde

 

Start date: 18 August 2021

End date: 7 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the installation of WIM and pizos.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 14 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 13 of 15

Streets affected: Warrina Crescent (full road closure with traffic control) between Aruma Avenue and Lemana Avenue

 

Start date: 20 August 2021

 

End date: 3 September 2021

 

Duration: 7.00am - 1.00pm

 

Reason: To facilitate Energex works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 12 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 10 of 14

Streets affected: Computer Road (full road closure with traffic control) between Octal Street and Progress Street

 

Also affected: Progress Street, Octal Street 

 

 

Start date: 22 August 2021

 

End date: 5 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 10 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Ormeau

Day 9 of 14

Streets affected: Creek Street (half road closure with traffic control) between Reedmans Road and Eggersdorf Road

 

Start date: 23 August 2021

 

End date: 6 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road excavation and resurfacing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 9 of 10

Streets affected: Hanlan Street (half road closure with detour and traffic control onsite – expect delays) between Surfers Paradise Boulevard and Esplanade

 

Start date: 24 August 2021

 

End date: 25 August 2021

 

Contingency Start Date: 1 September 2021

 

Contingency End Date: 2 September 2021

 

Duration: 9.00am - 1.30pm

 

Reason: To facilitate the safe hoisting of a crane.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 8 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 8 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 8 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 8 of 8

Streets affected: Main Beach Parade (full road closure with detour, local traffic access only, traffic control onsite – expect delays) between Woodroffe Avenue and John Kemp Street

 

Start date 1: 25 August 2021

 

End date 1: 25 August 2021

 

Start Date 2: 1 September 2021

 

End Date 2: 1 September 2021

 

Duration: 9.00am - 4.00pm

 

Reason: To safely position a mobile crane to lift building materials onto the adjacent property.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 7 of 7

Streets affected: T E Peters Drive (half road closure with traffic control onsite) between Miami Key and Sarasota Key

 

Also affected: Sunshine Boulevard

 

Start date: 25 August 2021

 

End date: 1 September 2021

 

Duration: 8.00pm - 6.00am

 

Reason: To facilitate the safe reline of the sewer main pipe.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 7 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 7 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 4 of 8

Streets affected: Laneway adjacent to Tedder Avenue (full road closure with traffic control) between Peak Avenue and Woodroffe Avenue

 

Start date 1: 29 August 2021

End date 1: 29 August 2021

Start date 2: 5 September 2021 (Contingency date)

End date 2: 5 September 2021 (Contingency date)

Duration: 6.30am - 6.00pm

Reason:To facilitate a crane lift for Telecommunications network.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 3 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 3 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 3 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 3 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 3 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 2 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Gaven

Day 3 of 8

Streets affected: Smith Street (reduced lane with traffic control onsite – expect delays) between Pitcairn Way and Banyula Drive

 

Also affected: Hammond Drive 

 

 

Start date: 30 August 2021

 

End date: 6 September 2021

 

Duration: 9.00am - 2.30pm

 

Reason:  To facilitate the install of coloured surfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 3 of 3

Streets affected: Connor Street (half road closure with detour and traffic control onsite) between James Street and Park Avenue

 

Start date: 30 August 2021

 

End date: 1 September 2021

 

Duration: 1.00pm - 6.00pm

 

Reason: To facilitate the lifting of roofing materials to building.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 2 of 9

Streets affected: Petrie Street (full road closure with local traffic access only and traffic control onsite) between Marine Parade and Eden Avenue

 

Start date: 31 August 2021

 

End date: 8 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities.

south

Bushfires

Planned - Bushfire hazard reduction burn – Collingwood Court Reserve Arundel

Day 1 of 2

Streets/area affected:  Collingwood Court Reserve, 156 Olsen Avenue Arundel

Start <time/date>: Wednesday 1st September (weather permitting)
End <time/date>:  Thursday 2nd September 
Duration:   2

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Bushfires

Planned - Bushfire hazard reduction burn – Collingwood Court Reserve Arundel

Day 1 of 2

Streets/area affected:  Collingwood Court Reserve, 156 Olsen Avenue Arundel

Start <time/date>: Wednesday 1st September (weather permitting)
End <time/date>:  Thursday 2nd September 
Duration:   2

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Bushfires

Planned - Bushfire hazard reduction burn – Collingwood Court Reserve Arundel

Day 1 of 2

Streets/area affected:  Collingwood Court Reserve, 156 Olsen Avenue Arundel

Start <time/date>: Wednesday 1st September (weather permitting)
End <time/date>:  Thursday 2nd September 
Duration:   2

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 1 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Water and sewerage

Planned - Water Interruption - Hollywell and Paradise Point

9.00am - 2.00pm

Streets affected: Bayview Street.


Cause: Hydrant replacement


Ref: 1000792872 /A69026699

north

Water and sewerage

Planned - Water Interruption - Hollywell

9.00am - 2.00pm

Streets affected: The Esplanade, Errol Avenue, Topaz Court, Sapphire Street.


Cause: Hydrant replacement


Ref: 1000792875 /A69026699

north

Water and sewerage

Planned - Water Interruption - Labrador

9.00am - 2.00pm

Streets affected: Broad Street, Billington Street, Government Road, Wynflo Street

Cause: Repair water main

Ref: 1000780940

north

Mosquito spraying

Planned - Biting Midge Canal Beach Treatment - Isle of Capri, Sorrento

9.00am - 11.30am

Areas affected: Isle of Capri, Sorrento

 

Biting Midge Canal Beach Treatment will be undertaken in these areas on Wednesday 1st September 2021 from 9.00am to 11.30am for control of biting midge larvae (weather permitting)

all regions

 
2 Sep - Thursday
Water and sewerage

Unplanned - Water Interruption - Hollywell

Day 2 of 2

Streets affected: Clematis Avenue

Cause: Repair water main

Ref. 1000802746

Start time and date: 11.45pm 1 September 2021

Finish time and date: 6.00am 2 September 2021

north

Water and sewerage

Unplanned - Water Interruption - Palm Beach

4.30am - 5.30am

Streets affected: Tahiti Avenue

Cause: Repair fire hydrant

Ref. 1000801905

south

Water and sewerage

Unplanned - Water Interruption - Palm Beach

5.10am - 6.10am

Streets affected: Mallawa Drive

Cause: Repair fire hydrant

Ref. 1000801692

south

Water and sewerage

Unplanned - Water Interruption - Palm Beach

10.50am - 2.50pm

Streets affected: Tallebudgera Drive

Cause: Repair water main

Ref: 1000800018

south

Water and sewerage

Unplanned - Water Interruption - Elanora

11.00am - 9.00pm

Streets affected: Myco Court 

Cause: Broken water main

Ref: 1000802884

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 228 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 108 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 106 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 82 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 80 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURES - Burleigh Heads

Day 79 of 79

Streets affected: Acanthus Avenue (full road closure with detour and traffic control, local traffic access only) between Sandpiper Drive and Gold Coast Highway

 

Also affected: Symonds Road and Diana Avenue

 

 

Start date: 16 June 2021

 

End date: 2 September 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate in the construction of a new roundabout, stormwater upgrade and new kerb/footpaths.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 73 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 50 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 45 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 37 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 33 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 32 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 27 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 24 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 22 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 22 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 22 of 22

Streets affected: Baileys Mountain Road (half road closure northbound with detour and traffic control) between Old Coach Road and Ruffles Road

 

 

Start date: 12 August 2021

 

End date: 2 September 2021

 

Duration: 6.00am - 6.00pm

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin

Day 22 of 23

Streets affected: Duringan Street (half road closure with detour/local traffic access only - traffic control onsite) between Woodgee Street and Dandaloo Drive

 

Start date: 12 August 2021

End date: 3 September 2021

Duration: 7.00am - 5.00pm

Reason: To facilitate water service upgrade.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 22 of 22

Streets affected: Garrick Street (half road closure with traffic control – expect delays) between Marine Parade and Musgrave Street

 

Start date: 12 August 2021

End date: 2 September 2021

Duration: 7.00am - 3.00pm

Reason: To facilitate guardrail repairs and barrier installation.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 19 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 18 of 19

Streets affected: Jefferson Lane (reduced lanes with traffic control) between Seventh Avenue and Ninth Avenue

 

 

Start date: 16 August 2021

End date: 3 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate water service upgrade.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 18 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 18 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 18 of 19

Streets affected: Queensland Avenue (half road closure with detour -  traffic control onsite - expect delays) between Old Burleigh Road and Federation Avenue

 

Start date: 16 August 2021

End date: 3 September 2021

Duration: 7.00am - 5.00pm

Reason: To facilitate the installation of coloured surface works to the road pavement.
 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 16 of 19

Streets affected: Abraham Road (reduced lane with Police traffic control onsite – expect delays) between Aviation Avenue/Turnbull Drive and Days Road/Foxwell Road Signalised Intersection

 

Start date: 18 August 2021

End date: 5 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the replacement of a knocked down signal pole.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 16 of 21

Streets affected: Pimpama Jacobs Well Road (half road closure with traffic control – expect delays) between Wharf Road/Old Wharf Road and Village Boulevarde

 

Start date: 18 August 2021

End date: 7 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the installation of WIM and pizos.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 15 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 14 of 15

Streets affected: Warrina Crescent (full road closure with traffic control) between Aruma Avenue and Lemana Avenue

 

Start date: 20 August 2021

 

End date: 3 September 2021

 

Duration: 7.00am - 1.00pm

 

Reason: To facilitate Energex works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 13 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 11 of 14

Streets affected: Computer Road (full road closure with traffic control) between Octal Street and Progress Street

 

Also affected: Progress Street, Octal Street 

 

 

Start date: 22 August 2021

 

End date: 5 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 11 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Ormeau

Day 10 of 14

Streets affected: Creek Street (half road closure with traffic control) between Reedmans Road and Eggersdorf Road

 

Start date: 23 August 2021

 

End date: 6 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road excavation and resurfacing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 10 of 10

Streets affected: Hanlan Street (half road closure with detour and traffic control onsite – expect delays) between Surfers Paradise Boulevard and Esplanade

 

Start date: 24 August 2021

 

End date: 25 August 2021

 

Contingency Start Date: 1 September 2021

 

Contingency End Date: 2 September 2021

 

Duration: 9.00am - 1.30pm

 

Reason: To facilitate the safe hoisting of a crane.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 9 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 9 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 9 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 8 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 8 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 5 of 8

Streets affected: Laneway adjacent to Tedder Avenue (full road closure with traffic control) between Peak Avenue and Woodroffe Avenue

 

Start date 1: 29 August 2021

End date 1: 29 August 2021

Start date 2: 5 September 2021 (Contingency date)

End date 2: 5 September 2021 (Contingency date)

Duration: 6.30am - 6.00pm

Reason:To facilitate a crane lift for Telecommunications network.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 4 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 4 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 4 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 4 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 4 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 3 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Gaven

Day 4 of 8

Streets affected: Smith Street (reduced lane with traffic control onsite – expect delays) between Pitcairn Way and Banyula Drive

 

Also affected: Hammond Drive 

 

 

Start date: 30 August 2021

 

End date: 6 September 2021

 

Duration: 9.00am - 2.30pm

 

Reason:  To facilitate the install of coloured surfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 3 of 9

Streets affected: Petrie Street (full road closure with local traffic access only and traffic control onsite) between Marine Parade and Eden Avenue

 

Start date: 31 August 2021

 

End date: 8 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities.

south

Bushfires

Planned - Bushfire hazard reduction burn – Collingwood Court Reserve Arundel

Day 2 of 2

Streets/area affected:  Collingwood Court Reserve, 156 Olsen Avenue Arundel

Start <time/date>: Wednesday 1st September (weather permitting)
End <time/date>:  Thursday 2nd September 
Duration:   2

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Bushfires

Planned - Bushfire hazard reduction burn – Collingwood Court Reserve Arundel

Day 2 of 2

Streets/area affected:  Collingwood Court Reserve, 156 Olsen Avenue Arundel

Start <time/date>: Wednesday 1st September (weather permitting)
End <time/date>:  Thursday 2nd September 
Duration:   2

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Bushfires

Planned - Bushfire hazard reduction burn – Collingwood Court Reserve Arundel

Day 2 of 2

Streets/area affected:  Collingwood Court Reserve, 156 Olsen Avenue Arundel

Start <time/date>: Wednesday 1st September (weather permitting)
End <time/date>:  Thursday 2nd September 
Duration:   2

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 2 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Water and sewerage

Planned - Water Interruption - Nerang

7.00am - 4.00pm

Streets affected: Lawrence Drive

Cause: Water meter replacement

Ref: 1000798567 / A69440216

south

Water and sewerage

Planned - Water Interruption - Paradise Point

9.00am - 2.00pm

Streets affected: Sundown Drive, Lakefield Cescent, Woodgate Place, Eurimbula Court, Maiala Court.


Cause: Hydrant replacement


Ref: 1000794649 /A69026699

 

north

Water and sewerage

Planned - Water Interruption - Robina

9.00am - 2.00pm

Streets affected: East Lane, Bella Avenue

Cause: Repair water main

Ref: 1000794215

south

 
3 Sep - Friday
Water and sewerage

Unplanned - Water Interruption - Labrador

12.15pm - 2.15pm

Streets affected: Reynolds Avenue

Cause: Repair water service

Ref: 1000795953

north

Water and sewerage

Unplanned - Water Interruption - Southport

5.00pm - 10.00pm

Streets Affected : Lovett Court, Dandar Drive.

Causes : Repair Broken Water Main.

Ref:1000803329

north

Road closures

Planned - Temporary Road Closure - Ormeau

Day 229 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 109 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 107 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 83 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 81 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 74 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 51 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 46 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 38 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 34 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 33 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 28 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 25 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 23 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 23 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Currumbin

Day 23 of 23

Streets affected: Duringan Street (half road closure with detour/local traffic access only - traffic control onsite) between Woodgee Street and Dandaloo Drive

 

Start date: 12 August 2021

End date: 3 September 2021

Duration: 7.00am - 5.00pm

Reason: To facilitate water service upgrade.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 20 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 19 of 19

Streets affected: Jefferson Lane (reduced lanes with traffic control) between Seventh Avenue and Ninth Avenue

 

 

Start date: 16 August 2021

End date: 3 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate water service upgrade.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 19 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 19 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 19 of 19

Streets affected: Queensland Avenue (half road closure with detour -  traffic control onsite - expect delays) between Old Burleigh Road and Federation Avenue

 

Start date: 16 August 2021

End date: 3 September 2021

Duration: 7.00am - 5.00pm

Reason: To facilitate the installation of coloured surface works to the road pavement.
 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 17 of 19

Streets affected: Abraham Road (reduced lane with Police traffic control onsite – expect delays) between Aviation Avenue/Turnbull Drive and Days Road/Foxwell Road Signalised Intersection

 

Start date: 18 August 2021

End date: 5 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the replacement of a knocked down signal pole.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 17 of 21

Streets affected: Pimpama Jacobs Well Road (half road closure with traffic control – expect delays) between Wharf Road/Old Wharf Road and Village Boulevarde

 

Start date: 18 August 2021

End date: 7 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the installation of WIM and pizos.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 16 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Burleigh Heads

Day 15 of 15

Streets affected: Warrina Crescent (full road closure with traffic control) between Aruma Avenue and Lemana Avenue

 

Start date: 20 August 2021

 

End date: 3 September 2021

 

Duration: 7.00am - 1.00pm

 

Reason: To facilitate Energex works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 14 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 12 of 14

Streets affected: Computer Road (full road closure with traffic control) between Octal Street and Progress Street

 

Also affected: Progress Street, Octal Street 

 

 

Start date: 22 August 2021

 

End date: 5 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 12 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Ormeau

Day 11 of 14

Streets affected: Creek Street (half road closure with traffic control) between Reedmans Road and Eggersdorf Road

 

Start date: 23 August 2021

 

End date: 6 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road excavation and resurfacing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 10 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 10 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 10 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 9 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 9 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 6 of 8

Streets affected: Laneway adjacent to Tedder Avenue (full road closure with traffic control) between Peak Avenue and Woodroffe Avenue

 

Start date 1: 29 August 2021

End date 1: 29 August 2021

Start date 2: 5 September 2021 (Contingency date)

End date 2: 5 September 2021 (Contingency date)

Duration: 6.30am - 6.00pm

Reason:To facilitate a crane lift for Telecommunications network.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 5 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 5 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 5 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 5 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 5 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 4 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Gaven

Day 5 of 8

Streets affected: Smith Street (reduced lane with traffic control onsite – expect delays) between Pitcairn Way and Banyula Drive

 

Also affected: Hammond Drive 

 

 

Start date: 30 August 2021

 

End date: 6 September 2021

 

Duration: 9.00am - 2.30pm

 

Reason:  To facilitate the install of coloured surfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 4 of 9

Streets affected: Petrie Street (full road closure with local traffic access only and traffic control onsite) between Marine Parade and Eden Avenue

 

Start date: 31 August 2021

 

End date: 8 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 3 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 1 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Water and sewerage

Planned - Water Interruption - Paradise Point

9.00am - 2.00pm

Streets affected:Seaspray Street.


Cause: Hydrant replacement


Ref: 1000794664 /A69026699

north

Water and sewerage

Planned - Water Interruption - Paradise Point

9.00am - 2.00pm

Streets affected: Seabreeze Street.


Cause: Hydrant replacement


Ref: 1000794666/A69026699

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 1 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 1 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

 
4 Sep - Saturday
Water and sewerage

Unplanned - Water Interruption - Helensvale

10.45am - 11.45am

Streets Affected : Poeppel Place.

Causes : Repair Water Service.

Ref:1000803369

north

Water and sewerage

Unplanned - Water Interruption - Surfers Paradise

1.30pm - 3.30pm

Streets Affected : Admiralty Drive.

Causes : Repair Water Main..

Ref:1000803449

north

Road closures

Planned - Temporary Road Closure - Ormeau

Day 230 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 110 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 108 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 84 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 82 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 75 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 52 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 47 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 39 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 35 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 34 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 29 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 26 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 24 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 24 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 21 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 20 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 20 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 18 of 19

Streets affected: Abraham Road (reduced lane with Police traffic control onsite – expect delays) between Aviation Avenue/Turnbull Drive and Days Road/Foxwell Road Signalised Intersection

 

Start date: 18 August 2021

End date: 5 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the replacement of a knocked down signal pole.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 18 of 21

Streets affected: Pimpama Jacobs Well Road (half road closure with traffic control – expect delays) between Wharf Road/Old Wharf Road and Village Boulevarde

 

Start date: 18 August 2021

End date: 7 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the installation of WIM and pizos.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 17 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 15 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 13 of 14

Streets affected: Computer Road (full road closure with traffic control) between Octal Street and Progress Street

 

Also affected: Progress Street, Octal Street 

 

 

Start date: 22 August 2021

 

End date: 5 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 13 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Ormeau

Day 12 of 14

Streets affected: Creek Street (half road closure with traffic control) between Reedmans Road and Eggersdorf Road

 

Start date: 23 August 2021

 

End date: 6 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road excavation and resurfacing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 11 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 11 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 11 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 10 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 10 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 7 of 8

Streets affected: Laneway adjacent to Tedder Avenue (full road closure with traffic control) between Peak Avenue and Woodroffe Avenue

 

Start date 1: 29 August 2021

End date 1: 29 August 2021

Start date 2: 5 September 2021 (Contingency date)

End date 2: 5 September 2021 (Contingency date)

Duration: 6.30am - 6.00pm

Reason:To facilitate a crane lift for Telecommunications network.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 6 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 6 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 6 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 6 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 6 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 5 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Gaven

Day 6 of 8

Streets affected: Smith Street (reduced lane with traffic control onsite – expect delays) between Pitcairn Way and Banyula Drive

 

Also affected: Hammond Drive 

 

 

Start date: 30 August 2021

 

End date: 6 September 2021

 

Duration: 9.00am - 2.30pm

 

Reason:  To facilitate the install of coloured surfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 5 of 9

Streets affected: Petrie Street (full road closure with local traffic access only and traffic control onsite) between Marine Parade and Eden Avenue

 

Start date: 31 August 2021

 

End date: 8 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 4 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 2 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 2 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 2 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

 
5 Sep - Sunday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 231 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 111 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 109 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 85 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 83 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 76 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 53 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 48 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 40 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 36 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 35 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 30 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 27 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 25 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 25 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 22 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 21 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 21 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 19 of 19

Streets affected: Abraham Road (reduced lane with Police traffic control onsite – expect delays) between Aviation Avenue/Turnbull Drive and Days Road/Foxwell Road Signalised Intersection

 

Start date: 18 August 2021

End date: 5 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the replacement of a knocked down signal pole.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 19 of 21

Streets affected: Pimpama Jacobs Well Road (half road closure with traffic control – expect delays) between Wharf Road/Old Wharf Road and Village Boulevarde

 

Start date: 18 August 2021

End date: 7 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the installation of WIM and pizos.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 18 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 16 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 14 of 14

Streets affected: Computer Road (full road closure with traffic control) between Octal Street and Progress Street

 

Also affected: Progress Street, Octal Street 

 

 

Start date: 22 August 2021

 

End date: 5 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Worongary

Day 14 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Ormeau

Day 13 of 14

Streets affected: Creek Street (half road closure with traffic control) between Reedmans Road and Eggersdorf Road

 

Start date: 23 August 2021

 

End date: 6 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road excavation and resurfacing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 12 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 12 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 12 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 11 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 11 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 8 of 8

Streets affected: Laneway adjacent to Tedder Avenue (full road closure with traffic control) between Peak Avenue and Woodroffe Avenue

 

Start date 1: 29 August 2021

End date 1: 29 August 2021

Start date 2: 5 September 2021 (Contingency date)

End date 2: 5 September 2021 (Contingency date)

Duration: 6.30am - 6.00pm

Reason:To facilitate a crane lift for Telecommunications network.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 7 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 7 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 7 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 7 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 7 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 6 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Gaven

Day 7 of 8

Streets affected: Smith Street (reduced lane with traffic control onsite – expect delays) between Pitcairn Way and Banyula Drive

 

Also affected: Hammond Drive 

 

 

Start date: 30 August 2021

 

End date: 6 September 2021

 

Duration: 9.00am - 2.30pm

 

Reason:  To facilitate the install of coloured surfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 6 of 9

Streets affected: Petrie Street (full road closure with local traffic access only and traffic control onsite) between Marine Parade and Eden Avenue

 

Start date: 31 August 2021

 

End date: 8 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 5 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 3 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 3 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 3 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

 
6 Sep - Monday
Water and sewerage

Unplanned - Water Interruption - Mermaid Beach

9.00am - 11.00am

Streets affected: Gold Coast Highway

Cause: Repair Water Main

Ref: 1000801603

south

Water and sewerage

Unplanned - Water Interruption - Mermaid Beach

9.00am - 11.00am

Streets affected: Gold Coast Highway

Cause: Repair Water Main

Ref: 1000801603

south

Water and sewerage

Unplanned - Water Interruption - Arundel

9.30am - 10.00am

Streets affected: Vale Street

Cause: Repair Fire Hydrant

Ref: 1000802175

north

Water and sewerage

Unplanned - Water Interruption - Broadbeach Waters

12.30pm - 1.30pm

Streets affected: Monterey Court

Cause: Repair Water Main

Ref: 1000800549

 

south

Water and sewerage

Unplanned - Water Interruption - Broadbeach Waters

12.30pm - 1.30pm

Streets affected: Monterey Court

Cause: Repair Water Main

Ref: 1000800549

 

south

Water and sewerage

Unplanned - Water Interruption - Burleigh Heads

2.00pm - 6.00pm

Streets affected: Banjo Street, Matilda Street

Cause: Repair Water Main

Ref: 1000803694

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 232 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 112 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 110 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 86 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 84 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 77 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 54 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 49 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 41 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 37 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 36 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 31 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 28 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 26 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 26 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 23 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 22 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 22 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 20 of 21

Streets affected: Pimpama Jacobs Well Road (half road closure with traffic control – expect delays) between Wharf Road/Old Wharf Road and Village Boulevarde

 

Start date: 18 August 2021

End date: 7 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the installation of WIM and pizos.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 19 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 17 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 15 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Ormeau

Day 14 of 14

Streets affected: Creek Street (half road closure with traffic control) between Reedmans Road and Eggersdorf Road

 

Start date: 23 August 2021

 

End date: 6 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road excavation and resurfacing.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 13 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 13 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 13 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 12 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 12 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 8 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 8 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 8 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 8 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 8 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 7 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Gaven

Day 8 of 8

Streets affected: Smith Street (reduced lane with traffic control onsite – expect delays) between Pitcairn Way and Banyula Drive

 

Also affected: Hammond Drive 

 

 

Start date: 30 August 2021

 

End date: 6 September 2021

 

Duration: 9.00am - 2.30pm

 

Reason:  To facilitate the install of coloured surfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 7 of 9

Streets affected: Petrie Street (full road closure with local traffic access only and traffic control onsite) between Marine Parade and Eden Avenue

 

Start date: 31 August 2021

 

End date: 8 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 6 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 4 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 4 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 4 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

Water and sewerage

Planned - Water Interruption - Molendinar

9.00am - 12.00pm

Streets affected: Panache Street

Cause: Meter replacement program

Ref: 1000802857

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 1 of 12

Streets affected: Queensland Avenue (half road closure with detour - traffic control on site) between Gold Coast Highway and Jubilee Avenue

Also affected: Gold Coast Highway

Start date: 6 September 2021

End date: 17 September 2021

Duration: 9pm – 5am

Reason: Asphalt resurfacing works

south

 
7 Sep - Tuesday
Water and sewerage

Unplanned - Water Interruption - Labrador

12.30pm - 1.30pm

Streets affected: Reynolds Avenue

Cause: Water Leak

Ref: 1000803850

north

Water and sewerage

Unplanned - Water Interruption- Tugan

2.10pm - 3.10pm

Streets affected: Gold Coast Highway

Cause: Repair water main

Ref. 1000804053

south

Water and sewerage

Unplanned - Water Interruption - Palm Beach

10.50pm - 11.50pm

Streets affected: Gold Coast Highway

Cause: Repair fire hydrant

Ref: 1000803605

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 233 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 113 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 111 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 87 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 85 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 78 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 55 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 50 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 42 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 38 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 37 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 32 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 29 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 27 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 27 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 24 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 23 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 23 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 21 of 21

Streets affected: Pimpama Jacobs Well Road (half road closure with traffic control – expect delays) between Wharf Road/Old Wharf Road and Village Boulevarde

 

Start date: 18 August 2021

End date: 7 September 2021

Duration: 9.00am - 2.30pm

Reason: To facilitate the installation of WIM and pizos.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 20 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 18 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 16 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 14 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 14 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 14 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 13 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 13 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 9 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 9 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 9 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 9 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 9 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 8 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 8 of 9

Streets affected: Petrie Street (full road closure with local traffic access only and traffic control onsite) between Marine Parade and Eden Avenue

 

Start date: 31 August 2021

 

End date: 8 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 7 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 5 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 5 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 5 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 2 of 12

Streets affected: Queensland Avenue (half road closure with detour - traffic control on site) between Gold Coast Highway and Jubilee Avenue

Also affected: Gold Coast Highway

Start date: 6 September 2021

End date: 17 September 2021

Duration: 9pm – 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 1 of 18

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 7 September 2021

End date: 24 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with the development site.

 

south

Water and sewerage

Planned - Water Interruption - Currumbin Waters

9.00am - 2.00pm

Streets affected: K P McGrath Drive, Guineas Creek Road, Wilpark Crescent, Riverside Drive

Cause: Hydrant replacement program

Ref: 1000794681 / A69475149

south

Water and sewerage

Planned - Water Interruption - Mermaid Waters

9.00am - 2.00pm

Streets affected: Le Mans Drive, Bordeaux Parade, Melody Street, Frascati Street, Surfers Avenue

Cause: Repair water main

Ref:  1000775264

south

Water and sewerage

Planned - Water Interruption - Southport

9.00am - 12.00pm

Streets affected: North Street

Cause: Meter replacement program

Ref: 1000802878

north

Water and sewerage

Planned - Water Interruption - Coolangatta

9.00am - 2.00pm

Streets affected: Dutton Street and Tweed Street

Cause: Watermain shutdown

Ref: 1000783766/A9630078

south

Water and sewerage

Planned - Water Interruption - Coolangatta

9.00am - 2.00pm

Streets affected: Petrie Street

Cause:Water shutdown new cut in connection

Ref. 1000802302

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

11.15am - 12.15pm

Streets affected: Matilda Street

Cause: Water Leak

Ref: 1000742737

south

Water and sewerage

Planned - Water Interruption - Main Beach

2.30pm - 5.30pm

Streets affected: Woodroffe Avenue

Cause: Meter replacement program

Ref: 1000802910

south

 
8 Sep - Wednesday
Water and sewerage

Unplanned - Water Interruption - Burleigh Waters

12.30am - 1.30am

Streets affected: Reedy Creek Road

Cause: Repair fire hydrant

Ref: 1000753914

south

Water and sewerage

Unplanned - Water Interruption - Benowa

10.05am - 12.05pm

Streets affected: Anchusia Avenue, Solar Court

Cause: Water Leak

Ref: 1000800079

north

Water and sewerage

Unplanned - Water Interruption - Upper Coomera

10.30am - 11.30am

Streets affected: Stanfield Drive

Cause: Water Leak

Ref: 1000803756

north

Water and sewerage

Unplanned - Water Interruption - Clear Island Waters

1.50pm - 2.20pm

Streets affected: Bollard Circuit

Cause: Water Leak

Ref: 1000802622

south

Water and sewerage

Unplanned - Water Interruption - Ormeau

4.00pm - 5.00pm

Streets affected: Halfway Drive, Rosella Court, Carellia Court, Conical Place

Cause: Repair water service

Ref: 1000801682

north

Road closures

Planned - Temporary Road Closure - Ormeau

Day 234 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 114 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 112 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 88 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 86 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 79 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 56 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 51 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 43 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 39 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 38 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 33 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 30 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 28 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 28 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 25 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 24 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 24 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 21 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 19 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 17 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 15 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 15 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 15 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 14 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 14 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 10 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 10 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 10 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 10 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 10 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 9 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 9 of 9

Streets affected: Petrie Street (full road closure with local traffic access only and traffic control onsite) between Marine Parade and Eden Avenue

 

Start date: 31 August 2021

 

End date: 8 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate construction activities.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 8 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 6 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 6 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 6 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 3 of 12

Streets affected: Queensland Avenue (half road closure with detour - traffic control on site) between Gold Coast Highway and Jubilee Avenue

Also affected: Gold Coast Highway

Start date: 6 September 2021

End date: 17 September 2021

Duration: 9pm – 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 2 of 18

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 7 September 2021

End date: 24 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with the development site.

 

south

Water and sewerage

Planned - Water Interruption - Currumbin

9.00am - 2.00pm

Streets affected: Bradman Drive, Marsh Place, Cockatiel Place, Bulbul Place, Pardaole Place

Cause: Hydrant replacement program

Ref: 1000794682 / A69475149

south

Water and sewerage

Planned - Water Interruption - Southport

9.00am - 12.00pm

Streets affected: Bauer Street

Cause: Meter replacement program

Ref: 1000802902

north

Water and sewerage

Planned - Water Interruption - Labrador

9.00am - 2.00pm

Streets affected: Pengana Street, Wilson Street

Cause: Valve replacement program

Ref: 1000801493

north

Water and sewerage

Planned - Water Interruption - Southport

12.30pm - 4.50pm

Streets affected: White Street

Cause: Meter replacement program

Ref: 1000802872

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 1 of 15

Streets affected:  Old Coach Road (lane closure and traffic control onsite – drive to conditions) between Commercial Street and The Heights Boulevard

 

Also affected:  Ellis Way, Coomera Springs Boulevard (full road closure with detour and traffic control onsite – local traffic access only)

 

Start date: 8 September 2021

 

End date: 22 September 2021

 

Duration: 6.30pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Water and sewerage

Planned - Water Interruption - Currumbin

Day 1 of 2

Streets affected: Currumbin Creek Road

Cause: Watermain Shutdown

Ref: 1000790664/A69993661

This shutdown occurs from Wednesday the 8/9 thru to 9/9

south

 
9 Sep - Thursday
Water and sewerage

Unplanned - Water Interruption - Surfers Paradise

12.15am - 2.30am

Streets affected: Cavill Avenue

Cause: Repair fire hydrant

Ref: 1000804058

north

Water and sewerage

Unplanned - Water Interruption - Southport

8.00am - 9.00am

Streets affected: Louise Street

Cause: Repair water main

Ref: 1000804631

north

Water and sewerage

Unplanned - Water Interruption - Southport

9.15am - 9.30am

Streets affected: Magnolia Drive

Cause: Water Leak

Ref: 1000803822

north

Water and sewerage

Unplanned - Water Interruption - Broadbeach Waters

9.30am - 10.30am

Streets affected: Bombala Street, Rio Vista Boulevard

Cause: Water Leak

Ref: 1000752861

south

Water and sewerage

Unplanned - Water Interruption - Main Beach

12.15pm - 1.15pm

Streets affected: Hughes Avenue

Cause: Water Leak

Ref: 1000803559

 

south

Water and sewerage

Unplanned - Water Interruption- Nerang

6.00pm - 10.00pm

Streets affected: Maroong Cresent, Yarraowee Drive and surrounding streets

Cause: Broken main

Ref. 1000804980

 

hinterland

Road closures

Planned - Temporary Road Closure - Ormeau

Day 235 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 115 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 113 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 89 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 87 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 80 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 57 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 52 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 44 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 40 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 39 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 34 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 31 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 29 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 29 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 26 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 25 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 25 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 22 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 20 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 18 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 16 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 16 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 16 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 15 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 15 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 11 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 11 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 11 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 11 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 11 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 10 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 9 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 7 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 7 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 7 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 4 of 12

Streets affected: Queensland Avenue (half road closure with detour - traffic control on site) between Gold Coast Highway and Jubilee Avenue

Also affected: Gold Coast Highway

Start date: 6 September 2021

End date: 17 September 2021

Duration: 9pm – 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 3 of 18

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 7 September 2021

End date: 24 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with the development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 2 of 15

Streets affected:  Old Coach Road (lane closure and traffic control onsite – drive to conditions) between Commercial Street and The Heights Boulevard

 

Also affected:  Ellis Way, Coomera Springs Boulevard (full road closure with detour and traffic control onsite – local traffic access only)

 

Start date: 8 September 2021

 

End date: 22 September 2021

 

Duration: 6.30pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Water and sewerage

Planned - Water Interruption - Currumbin

Day 2 of 2

Streets affected: Currumbin Creek Road

Cause: Watermain Shutdown

Ref: 1000790664/A69993661

This shutdown occurs from Wednesday the 8/9 thru to 9/9

south

Water and sewerage

Planned - Water Interruption - Broadbeach

1.00am - 5.00am

Streets affected: Victoria Avenue

Cause: Watermain shutdown

Ref: 1000802962/A69995360

south

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Helensvale

4.00am - 6.00am

Areas affected: Helensvale

 

Mosquito/biting midge spraying will be undertaken in these areas on Thursday 9th September 2021 from 4am to 6am for control of mosquitos and biting midges (weather permitting).

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Arundel

Day 1 of 21

Streets affected: Allied Drive (lane closure with traffic control onsite – expect delays) between Muirefield Place and Napper Road

 

Start date 1: 9 September 2021

End date 1:  17 Sepember 2021

 

Duration: 9.00am - 2.30pm

 

Start date 2: 18 September 2021 

End date 2: 29 September 2021

 

Duration: 8.30am - 3.00pm

 

Reason: To facilitate the replacement of loops.

north

Water and sewerage

Planned - Water Interruption - Currumbin Waters

9.00am - 2.00pm

Streets affected: Ware Drive, Hillier Street, Hillcot Street, Tudor Court, Alder Court

Cause: Hydrant replacement program

Ref: 1000794683 / A69475149

south

Water and sewerage

Planned - Water Interruption - Palm Beach

9.00am - 2.00pm

Streets affected: Townson Avenue and Kalang Street

Cause: Watermain Shutdown

Ref: 1000798841/A69479756

south

Water and sewerage

Planned - Water Interruption - Bundall

Day 1 of 2

Streets affected: Bundall Road

Cause: Meter replacement

Ref: 1000804142/70158673

 

Start Date and Time:  10pm 9 Sept 2021
End Date and Time: 05.00am 10 Sept 2021

north

Water and sewerage

Planned - Water Interruption - Carrara

Day 1 of 2

Streets affected: Spencer Road

Cause: Watermain replacement

Ref: 1000794792  / WWS/2021/321

This shutdown is occuring from Thursday 9/9 thru 10/9

south

 
10 Sep - Friday
Water and sewerage

Unplanned - Water Interruption - Nerang

11.20am - 12.20pm

Streets affected: Paladin Court

Cause: Repair water main

Ref: 1000803775

north

Water and sewerage

Unplanned - Water Interruption - Main Beach

11.30am - 12.30pm

Streets affected: Cronin Ave

Cause: Repair water main

Ref: 1000805034

north

Road closures

Planned - Temporary Road Closure - Ormeau

Day 236 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 116 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 114 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 90 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 88 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 81 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 58 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 53 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 45 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 41 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 40 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 35 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 32 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 30 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 30 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 27 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 26 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 26 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 23 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 21 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 19 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 17 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 17 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 17 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 16 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 16 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 12 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 12 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 12 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 12 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Mosquito spraying

Planned - Pest Animal Trapping - Numinbah Conservation Area, Pocket Road Conservation Area

Day 12 of 12

Areas affected: Numinbah Conservation Area, Pocket Road Conservation Area

 

Please be advised the Pest Animal Management team are scheduled to undertake pest animal trapping within the Numinbah Conservation area and the Pocket Road Conservation area over the period from 7.00am 30 August 2021 to 11.59pm 10 September 2021.

 

Please stay out of sections that have been closed with signs and barrier tape during the above period as penalties apply.

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 11 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 10 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 8 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 8 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 8 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 5 of 12

Streets affected: Queensland Avenue (half road closure with detour - traffic control on site) between Gold Coast Highway and Jubilee Avenue

Also affected: Gold Coast Highway

Start date: 6 September 2021

End date: 17 September 2021

Duration: 9pm – 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 4 of 18

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 7 September 2021

End date: 24 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with the development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 3 of 15

Streets affected:  Old Coach Road (lane closure and traffic control onsite – drive to conditions) between Commercial Street and The Heights Boulevard

 

Also affected:  Ellis Way, Coomera Springs Boulevard (full road closure with detour and traffic control onsite – local traffic access only)

 

Start date: 8 September 2021

 

End date: 22 September 2021

 

Duration: 6.30pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Arundel

Day 2 of 21

Streets affected: Allied Drive (lane closure with traffic control onsite – expect delays) between Muirefield Place and Napper Road

 

Start date 1: 9 September 2021

End date 1:  17 Sepember 2021

 

Duration: 9.00am - 2.30pm

 

Start date 2: 18 September 2021 

End date 2: 29 September 2021

 

Duration: 8.30am - 3.00pm

 

Reason: To facilitate the replacement of loops.

north

Water and sewerage

Planned - Water Interruption - Bundall

Day 2 of 2

Streets affected: Bundall Road

Cause: Meter replacement

Ref: 1000804142/70158673

 

Start Date and Time:  10pm 9 Sept 2021
End Date and Time: 05.00am 10 Sept 2021

north

Water and sewerage

Planned - Water Interruption - Carrara

Day 2 of 2

Streets affected: Spencer Road

Cause: Watermain replacement

Ref: 1000794792  / WWS/2021/321

This shutdown is occuring from Thursday 9/9 thru 10/9

south

Mosquito spraying

Planned - Biting Midge Canal Beach Treatment – Florida Gardens, Rio Vista

5.30am - 10.00am

Areas affected: Florida Gardens, Rio Vista

 

Biting Midge Canal Beach Treatment will be undertaken in these areas on Friday 10 September 2021 from 5.30am to 10.00am for control of biting midge larvae (weather permitting)

all regions

Water and sewerage

Planned - Water Interruption - Currumbin Waters

9.00am - 2.00pm

Streets affected: Ware Drive, Coote Court, Gough Place, Glentrees Grove, Ilford Close, Timothy Court

Cause: Hydrant replacement program

Ref: 1000794684 / A69475149

south

Water and sewerage

Planned - Water Interruption - Labrador

9.00am - 2.00pm

Streets affected: Reynolds Avenue

Cause: Water service connection

Ref: 60009403 / A70121342

north

Water and sewerage

Planned - Water Interruption - Coombabah

Day 1 of 2

Streets affected: 251 Brisbane Road

Cause: Water meter replacement

Ref: 1000803123/A70006090

north

 
11 Sep - Saturday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 237 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 117 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 115 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 91 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 89 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 82 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 59 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 54 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 46 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 42 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 41 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 36 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 33 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 31 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 31 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 28 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 27 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 27 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 24 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 22 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - Temporary Road Closure - Worongary

Day 20 of 20

Streets affected: Hinkler Drive (half road closure with traffic control onsite – expect delays) between Mudgeeraba Road and Akira Way

 

Start date: 23 August 2021

 

End date: 11 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 18 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 18 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 18 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 17 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 17 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 13 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 13 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 13 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 13 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 12 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 11 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 9 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 9 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 9 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 6 of 12

Streets affected: Queensland Avenue (half road closure with detour - traffic control on site) between Gold Coast Highway and Jubilee Avenue

Also affected: Gold Coast Highway

Start date: 6 September 2021

End date: 17 September 2021

Duration: 9pm – 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 5 of 18

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 7 September 2021

End date: 24 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with the development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 4 of 15

Streets affected:  Old Coach Road (lane closure and traffic control onsite – drive to conditions) between Commercial Street and The Heights Boulevard

 

Also affected:  Ellis Way, Coomera Springs Boulevard (full road closure with detour and traffic control onsite – local traffic access only)

 

Start date: 8 September 2021

 

End date: 22 September 2021

 

Duration: 6.30pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Arundel

Day 3 of 21

Streets affected: Allied Drive (lane closure with traffic control onsite – expect delays) between Muirefield Place and Napper Road

 

Start date 1: 9 September 2021

End date 1:  17 Sepember 2021

 

Duration: 9.00am - 2.30pm

 

Start date 2: 18 September 2021 

End date 2: 29 September 2021

 

Duration: 8.30am - 3.00pm

 

Reason: To facilitate the replacement of loops.

north

Water and sewerage

Planned - Water Interruption - Coombabah

Day 2 of 2

Streets affected: 251 Brisbane Road

Cause: Water meter replacement

Ref: 1000803123/A70006090

north

Water and sewerage

Planned - Water Interruption - Arundel

8.00am - 11.00am

Streets affected: Wrights Place

Cause: Meter replacement program

Ref: 1000803754 / A70107675

north

Water and sewerage

Planned - Water Interruption - Currumbin Waters

9.00am - 2.00pm

Streets affected: Wheeler Crescent and Villiers Drive

Cause: Watermain works

Ref: 1000782085

south

Water and sewerage

Planned - Water Interruption - Arundel

12.00pm - 2.00pm

Streets affected: Logistics Place

Cause: Meter replacement program

Ref: 1000804701 / A70195541

north

Water and sewerage

Planned - Water Interruption - Carrara

12.00pm - 3.00pm

Streets affected: Spall Street

Cause: Meter replacement program

Ref: 1000804971

south

 
12 Sep - Sunday
Road closures

Planned - Temporary Road Closure - Ormeau

Day 238 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 118 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 116 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 92 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 90 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 83 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 60 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 55 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 47 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 43 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 42 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 37 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 34 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 32 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 32 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 29 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 28 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 28 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 25 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 23 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 19 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 19 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 19 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 18 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 18 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Biggera Waters/Coombabah

Day 14 of 14

Streets affected: Pine Ridge Road (half road closure with traffic control) between Gold Coast Highway/Brisbane Road and Coombabah Road

Also affected: Lakelands Road, Harbour Quays Drive, East Quay Drive (half road with detour and traffic control)

 

Start date: 29 August 2021

End date: 12 September 2021

Duration: 7.00pm - 5.00am

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 14 of 14

Streets affected 1 : Foxwell Road (reduced lanes with Police traffic control onsite) between Days Road/M1 Interchange and Finnegan Way

 

Streets affected 2 : George Alexander Way (full road closure with detour) between Foxwell Road to Bloom Avenue

 

Streets affected 3: Railway Road (reduced lane) between Foxwell Road and Entrance Road to Coomera Station

 

 

Start date: 29 August 2021

 

End date: 12 September 2021

 

Duration: 7.00pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 14 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 14 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 13 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 12 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 10 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 10 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 10 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 7 of 12

Streets affected: Queensland Avenue (half road closure with detour - traffic control on site) between Gold Coast Highway and Jubilee Avenue

Also affected: Gold Coast Highway

Start date: 6 September 2021

End date: 17 September 2021

Duration: 9pm – 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 6 of 18

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 7 September 2021

End date: 24 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with the development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 5 of 15

Streets affected:  Old Coach Road (lane closure and traffic control onsite – drive to conditions) between Commercial Street and The Heights Boulevard

 

Also affected:  Ellis Way, Coomera Springs Boulevard (full road closure with detour and traffic control onsite – local traffic access only)

 

Start date: 8 September 2021

 

End date: 22 September 2021

 

Duration: 6.30pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Arundel

Day 4 of 21

Streets affected: Allied Drive (lane closure with traffic control onsite – expect delays) between Muirefield Place and Napper Road

 

Start date 1: 9 September 2021

End date 1:  17 Sepember 2021

 

Duration: 9.00am - 2.30pm

 

Start date 2: 18 September 2021 

End date 2: 29 September 2021

 

Duration: 8.30am - 3.00pm

 

Reason: To facilitate the replacement of loops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 1 of 17

Streets affected: Monaco Street (half road closure with traffic control onsite) between Bermuda Street and Rio Vista Boulevard

 

Also affected: Pacific Boulevard (full road closure with local traffic only)

 

Start date: 12 September 2021

 

End date: 28 September 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate the excavation and resurfacing of the road.

south

 
13 Sep - Monday
Water and sewerage

Unplanned - Water Interruption - Coombabah

9.00am - 10.00am

Streets affected: Cartagena Lane

Cause: Repair hydrant

Ref: 1000804369

north

Water and sewerage

Unplanned - Water Interruption - Mermaid Waters

3.00pm - 9.00pm

Streets affected: Henning Court

Cause: Repair water main

Ref: 1000805681

south

Water and sewerage

Unplanned - Water Interruption - Mudgeeraba

10.00pm - 11.45pm

Streets affected: Railway Street

Cause: Repair water hydrant

Ref: 1000793273

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 239 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 119 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 117 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 93 of 93

Streets affected: Aloha Lane (full road closure local traffic access only) between Main Beach Parade and Pacific Street

Start date: 13 June 2021

End date: 13 September 2021

Duration: Midnight – 11:59pm

Reason: To facilitate placement of dewatering plant and construction related activities.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 91 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 84 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 61 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 56 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 48 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 44 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 43 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 38 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 35 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 33 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 33 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 30 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 29 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 29 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 26 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 24 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 20 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 20 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 20 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 19 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 19 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 15 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 15 of 15

Streets affected: Cypress Drive (full road closure with traffic control onsite) between Cedar Place and Cul-de-sac

 

Also affected: Conifer Crescent

 

 

Start date: 30 August 2021

 

End date: 13 September 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate the resurfacing of the road.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 14 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 13 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 11 of 15

Streets affected: Finnegan Way (half road closure with traffic control onsite) between Chromata Lane and Lisa Crescent

 

Also affected: Lily Avenue, Trillers Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.30am - 4.30pm

 

Reason: To facilitate the upgrade of the Bus Stops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 11 of 15

Streets affected: Main Beach Parade (full road closure with detour and traffic control onsite) between Aloha Lane and Cabel Street

 

Also affected: Breaker Street, Serisier Avenue

 

Start date: 3 September 2021

 

End date: 17 September 2021

 

Duration: 6.00pm - 6.00am

 

Reason: To facilitate road pavement excavation and resurfacing.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 11 of 18

Streets affected: Reserve Road (half road closure with traffic control onsite) between Abraham Road and Heathwood Drive

 

Start date: 3 September 2021

 

End date: 20 September 2021

 

Duration: 7.00pm - 6.00am 

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 8 of 12

Streets affected: Queensland Avenue (half road closure with detour - traffic control on site) between Gold Coast Highway and Jubilee Avenue

Also affected: Gold Coast Highway

Start date: 6 September 2021

End date: 17 September 2021

Duration: 9pm – 5am

Reason: Asphalt resurfacing works

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 7 of 18

Streets affected: Wharf Road (full road closure with traffic control onsite) between Old Burleigh Road and Beach end of Street

 

Start date: 7 September 2021

End date: 24 September 2021

Duration: 6.30am - 6.30pm

Reason: To facilitate crane lifting works associated with the development site.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 6 of 15

Streets affected:  Old Coach Road (lane closure and traffic control onsite – drive to conditions) between Commercial Street and The Heights Boulevard

 

Also affected:  Ellis Way, Coomera Springs Boulevard (full road closure with detour and traffic control onsite – local traffic access only)

 

Start date: 8 September 2021

 

End date: 22 September 2021

 

Duration: 6.30pm - 6.00am

 

Reason: To facilitate excavation and resurfacing works.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Arundel

Day 5 of 21

Streets affected: Allied Drive (lane closure with traffic control onsite – expect delays) between Muirefield Place and Napper Road

 

Start date 1: 9 September 2021

End date 1:  17 Sepember 2021

 

Duration: 9.00am - 2.30pm

 

Start date 2: 18 September 2021 

End date 2: 29 September 2021

 

Duration: 8.30am - 3.00pm

 

Reason: To facilitate the replacement of loops.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 2 of 17

Streets affected: Monaco Street (half road closure with traffic control onsite) between Bermuda Street and Rio Vista Boulevard

 

Also affected: Pacific Boulevard (full road closure with local traffic only)

 

Start date: 12 September 2021

 

End date: 28 September 2021

 

Duration: 6.00pm - 6.00am 

 

Reason: To facilitate the excavation and resurfacing of the road.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 1 of 19

Streets affected: Peachey Road (full road closure with traffic control onsite) between Stephens Way and Sandy Creek Road

 

Start date: 13 September 2021

 

End date: 1 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: To facilitate traffic light installation and sewer work.

north

Mosquito spraying

Planned - Biting Midge Canal Beach Treatment - Broadbeach Waters, Miami

5.30am - 10.00am

Areas affected: Broadbeach Waters, Miami

 

Biting Midge Canal Beach Treatment will be undertaken in these areas on Monday 13th September 2021 from 5.30am to 10.00am for control of biting midge larvae (weather permitting)

all regions

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 1 of 3

Streets affected: Brooke Avenue (half road closure with traffic control onsite) between Townson Avenue and Nineteenth Avenue

 

Start date: 13 September 2021

 

End date: 15 September 2021


Duration: 6.30am - 6.30pm

 

Reason: To facilitate a Tower Crane installation.

south

Water and sewerage

Planned - Water Interruption - Biggera Waters

7.30am - 4.00pm

Streets affected: Ashbourne Terrace

Cause: Replace water service

Ref: 1000776037

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mermaid Beach

Day 1 of 3

Streets affected: Hedges Avenue (Half road with detour) between Peerless Avenue and Sunbrite Avenue

 

Start date: 13 September 2021

 

End date: 15 September 2021

 

Duration: 9.00am - 5.00pm

 

Reason: Facilitate repairs on a telecommunications blockage.

south

Water and sewerage

Planned - Water Interruption - Pimpama

9.00am - 12.00pm

Streets affected: Tamarind Place

Cause: Meter replacement program

Ref: 1000803758 / A70104132

north

Water and sewerage

Planned - Water Interruption - Robina

Day 1 of 2

Streets affected: Robina Town Centre Drive, Waterfront Place

Cause: Watermain connection

Ref: 1000798988

Start time and date: 9:00pm 13 September 2021

End time and date: 05.00am 14 September 2021

south

 
14 Sep - Tuesday
Water and sewerage

Unplanned - Water Interruption - Southport

4.20am - 5.20am

Streets affected: Garden Street

Cause: Repair water main

Ref: 1000804634

north

Water and sewerage

Unplanned - Water Interruption - Southport

5.00am - 6.00am

Streets affected: Case Street

Cause: Repair water main

Ref: 1000804989

north

Water and sewerage

Unplanned - Water Interruption - Broadbeach Waters

10.00am - 10.50am

Streets affected: Rudd Street

Low Pressure: Wyuna Drive, Rosemont Avenue

Cause: Repair water main

Ref: 1000805045

south

Water and sewerage

Unplanned - Water Interruption - Parkwood

11.50am - 12.20pm

Streets affected: Morfantaine Terrace

Cause: Repair hydrant

Ref: 1000799871

north

Water and sewerage

Unplanned - Water Interruption - Robina

Day 1 of 2

Streets affected: Thorngate Drive, Paravista Street, Dulwich Place, Trinity Place, Para Place, Aspendale Place, Wayville Place, Unley Place, Springvale Street, Broadview Place, Waitara Place, Tiffany Close, Seffon Place, Wattle Glen Place,Sylvania Place, KingsGroove Street, Kilburn Street, Medinde Court, Kidman Street, Wynnvale Place, Hindmarsh Court.

Cause: Repair water main

Ref: 1000806169

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 240 of 691

Streets affected: Unformed Road (Vennor Reserve) (Full road closure with traffic control – expect delays) between Peachey Road and Shaws Pocket Road North 

Start date: 18 January 2021

End date: 9 December 2022

Duration: 6.30am to 5.00pm

Reason: Construction of new 70m telecommunications tower (including associated equipment) and decommission existing structure and remove from site – entire project timeframe is approximately 23 months. Works include upgrade of track/road.

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 120 of 167

Streets affected: Foxwell Road (half road closure with traffic control – expect delays) between Learning Street and Oakey Creek Road

 

Also affected: Henry Street 

 

Start date:  18May 2021

End date: 31 October 2021

Duration: 9.00am - 2.30pm, 6.30am - 6.30pm (School Holidays)

Reason: Construction of shared footpath on Northern verge.

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 118 of 363

Streets affected: Via Roma (Half road closure with traffic control – expect delays) between Remembrance Drive and St Peters Place

 

Also affected: Markwell Avenue

 

Start date: 19 May 2021

 

End date: 17 May 2022

 

Duration: 6.30am - 6.30pm

 

Reason:  To facilitate construction works on the Isle of Capri Decongestion Project.

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 92 of 169

Streets affected: Currumbin Creek Road (lane closure with traffic control – expect delays) between Braewood Drive and End of Currumbin Creek Road

 

Start date: 15 June 2021

 

End date: 30 November 2021

 

Duration: 12.00am - 11.59pm

 

Reason: This is emergent make-safe works for landslides which reduced road width and vehicles cannot pass safely. 

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - MIAMI

Day 85 of 175

Streets affected: Albion Avenue (full road closure with detour - traffic control onsite) between Nobby Parade and Dawn Parade

 

Also affected: Snipe Street

 

 

Start date: 22 June 2021

 

End date: 13 December 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate the construction of a new stormwater line.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 62 of 93

Streets affected: Woodroffe Avenue (full road closure with traffic control – expect delays) between Main Beach Parade and End of Road (East)

 

 

Start date: 15 July 2021

 

End date: 15 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate a safe environment for major deliveries utilising a mobile crane and concrete pour.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Southport

Day 57 of 92

Streets affected: Marine Parade (reduced lanes - drive to conditions) between Nind Street and Cloyne Road

 

Also affected: Nind Street

 

Start date: 19 July 2021

 

End date: 19 October 2021

 

Duration 1: 9.00am - 2.30pm

Duration 2: 7.00pm - 6.30am

 

Reason: To facilitate Installation of stormwater drainage.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 49 of 92

Streets affected: George Avenue (half road closure with detour - traffic control on site) between Surf Parade and Old Burleigh Road

Start date: 28 July 2021

End date: 27 October 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach

Day 45 of 92

Streets affected: Australia Avenue (half road closure with detour and traffic control – expect delays) between Old Burleigh Road and Broadbeach Boulevard

 

Also affected: Old Burleigh Road

 

Start date: 1 August 2021

 

End date: 31 October 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To safely facilitate material deliveries and construction activities for the development site.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Bilinga

Day 44 of 47

Streets affected: Golden Four Drive (shared path) between Gold Coast Highway and Surf Street

 

Start date: 2 August 2021

End date: 17 August 2021

Duration: 12.00am - 11.59pm

Reason: Construction of Rock wall for future development. Boardwalk Closure 24/7 with Pedestrian diversion. Works require approximately 6 weeks to complete.

south

Road closures

Planned - Temporary Road Closure - Stapylton

Day 39 of 116

Streets affected: Stapylton Jacobs Well Road (half road closure and footpath with traffic control – expect delays) between Henry Hester Drive/Christensen Road M1 Interchange and Yellowood Road

Also affected: Hillside Drive, De Bortoli Street, Quarry Road

Start date: 6 August 2021

End date: 30 November 2021

Duration: 6pm – 6am

Reason: To facilitate the construction and industrial subdivision, line marking and barrier installation (Vantage) at Yatala, including upgrading the entry off Stapylton Jacobs Well Road.  

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Labrador

Day 36 of 82

Streets affected: Reynolds Avenue (half road closure with detour/local traffic access only - traffic control onsite) between Whiting Street and Muir Street

 

Start date: 10 August 2021

End date: 30 October 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate full road construction works (one side at a time) including kerb, footpath, driveway and lane.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 34 of 62

Streets affected: Moresby Avenue, Timor Avenue (full road closure with detour/local traffic access only) between Tahiti Avenue and Merauke Avenue

 

 

 

 

 

Start date: 12 August 2021

 

End date: 12 October 2021

 

Duration: 12.00am - 11.59pm

 

Reason: Facilitate new sewer connections.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Pimpama

Day 34 of 36

Streets affected: Gainsborough Drive (full road closure with detour/local traffic access only - traffic control onsite) between Dixon Drive and Bunderoo Circuit

 

Start date: 12 August 2021

 

End date: 16 September 2021

 

Duration: 12.00am - 23.59pm

 

Reason: To facilitate civil works including kerb, pavement, resurfacing existing road, signage and line marking.

 

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Robina

Day 31 of 108

Streets affected: Stadium Drive (half/full road closure with Police traffic control – expect delays) between Promethean Way and East Lane

Also affected: Cheltenham Drive, Centreline Place, Laver Drive, Robina Station Road

 

 

Start date: 14 August 2021 

 

End date: 30 November 2021

 

Duration: 3 hours prior to scheduled game start, 2 hours post game finish.  Various dates please visit Cbus Super Stadium website for game dates

 

Reason: NRL Season 2021 Games.  Various closures to facilitate advance warning signs and a safe environment for all road users on event days.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Broadbeach Waters

Day 30 of 137

Streets affected: T E Peters Drive (Reduced lanes with detour - drive to conditions) between Rio Vista Boulevard and Sunshine Boulevard

 

Also affected: Key West, Pearl Key

Start date: 16 August 2021

 

End date: 30 December 2021

 

Duration: 6.30am - 6.30pm

 

Reason: To facilitate road reconstruction works.

 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Main Beach

Day 30 of 41

Streets affected: Cronin Avenue (full road closure with detour/local traffic access only - traffic control onsite) between Tedder Avenue and Rankin Parade

 

Start date: 16 August 2021

End date: 25 September 2021

Duration: 6.30am - 5.00pm

Reason: To facilitate kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coolangatta

Day 27 of 27

Streets affected: Marine Parade (continuous verge/footpath/parking lane/bay/partial bike lane) between Miles Street and Rutledge Street

 

Start date: 19 August 2021

End date: 14 September 2021 
 
Duration: 12.00am - 11.59pm

Reason: To facilitate under boarding and open trenching for the upgrade to Kirra Pavilion. 

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Surfers Paradise

Day 25 of 28

Streets affected: The Esplanade and View Avenue (half full road closure with traffic control – expect delays) between Elkhorn Avenue and Surfers Paradise Boulevard

 

Start date: 21 August 2021

 

End date: 17 September 2021

 

Duration: 6.30am  5.00pm

 

Reason: To facilitate footpath reconstruction and kerb and channel works.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 21 of 57

Streets affected: Townson Avenue (full road closure with traffic control onsite and detour in place) between Seventh Avenue and Eleventh Avenue

 

 

Start date: 25 August 2021

End date: 20 December 2021

Duration: 12.00am - 11.59pm

Reason: To facilitate full road pavement reconstruction including footpath.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Norwell

Day 21 of 22

Streets affected: Norwell Road (half road closure with traffic control onsite – expect delays) between Pimpama Jacobs Well Road and Cowley Road

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Yatala

Day 21 of 22

Streets affected: Darlington Drive (verge/footpath, bike lane) between Sandy Creek Road and Pearson Road

 

 

Start date: 25 August 2021

 

End date: 15 September 2021

 

Duration: 7.00am - 3.00pm

 

Reason: To facilitate Guardrail repairs.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Hope Island

Day 20 of 114

Streets affected: Santa Barbara Road (half road closure with traffic control onsite – expect delays) between Hope Island Road and Casey Road

 

Start date: 26 August 2021

 

End date: 17 December 2021

 

Duration 1: 9.00 - 2.30pm

Duration 2: 7.00pm - 6.00am

Duration 3: 12.00am - 11.59pm

 

Reason: To facilitate the installation of new recycled water main and sewer rising main.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Mount Nathan

Day 20 of 51

Streets affected: Nathan Valley Road (full road closure with traffic control onsite – expect delays) between Mount Nathan Road 26 and End of Road

 

Start date: 26 August 2021

 

End date: 15 October 2021

 

Duration: 7.00am - 5.00pm

 

Reason: To facilitate tree cleaning, road widening and construction of crib retaining wall.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Palm Beach

Day 16 of 96

Streets affected: Palm Beach Avenue (half road closure with detour - traffic control on site) between Jefferson Lane and Gold Coast Highway

Start date: 30 August 2021

End date: 3 December 2021

Duration: 6:30am – 6:30pm

Reason: To facilitate large concrete pours and deliveries.

south

Road closures

Planned - TEMPORARY ROAD CLOSURE - Upper Coomera

Day 15 of 42

Streets affected: Reserve Road (lane closure with traffic control onsite – expect delays) between Old Coach Road and Kaizlee Crescent

 

Start date: 30 August 2021

 

End date: 11 October 2021

 

Duration: 9.00am - 2.30pm; 7.00pm - 6.00am (East bound right turn lane with detour on Reserve Road) 

 

Reason: To facilitate the installation of new conduits, pits and footings for new CCTV site.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Helensvale

Day 14 of 44

Streets affected: Helensvale Road (half road closure with traffic control onsite – expect delays) between Serenity Boulevard amd Halcyon Way

 

Start date: 1 September 2021

 

End date: 14 October 2021

 

Duration 1: 9.00am - 2.30pm (Monday - Friday)

Duration 2:  7.00pm - 5.00am

Duration 3:  7.00am - 6.00pm (Saturday)

 

Reason: To facilitate replacement of bridge expansion joints and deck wearing surface replacement.

north

Road closures

Planned - TEMPORARY ROAD CLOSURE - Coomera

Day 12 of 15