Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

June 2018

Jump to today
1 Jun - Friday
Water and sewerage

Unplanned - Water interruption - Surfers Paradise

8.35pm - 2.00am

Streets affected: Stanhill Drive

Cause: Water Leak

W/O: 20424760

central

Water and sewerage

Unplanned - Water interruption - Labrador

9.00pm - 1.00am

Streets affected: Nevenia Street

Cause: Water Leak

W/O: 20424744

central

Water and sewerage

Unplanned - Water interruption - Benowa - Bundall

11.30am - 12.30pm

Streets affected: Heeb Street between Poinciana Crescent and Sandown Avenue, Sandown Avenue, Allamanda Grove, Camellia Avenue, Croton Grove

Cause: Repair water main

W/O: 20423484

Notif: 1000468230

central

Water and sewerage

Unplanned - Water interruption - Mudgeeraba

Day 1 of 2

Streets affected: Twilight Drive, Springtime Court, Autumn Court

Cause: Repair water main

W/O: 20424980

Notif: 1000470074

Show more

Start time and date: 2.55pm,  1 June  2018

End time and date: 4.00am, 2 June  2018

south

Water and sewerage

Unplanned - Water Interruption - Currumbin Waters

Day 1 of 2

Streets affected: Bienvenue Rive

Cause: Water Leak

W/O: 20424968

Notif: 1000470059

south

Road closures

Planned - Temporary road closure Yatala

Day 214 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 204 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 117 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 106 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 94 of 94

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 28 February 2018

 End date: 1 June 2018

Duration: Continuous

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 46 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 46 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 39 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 33 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 32 of 33

Streets affected: Binstead Way (half road closure with hold and release for 2 minutes maximum) between Greenway Boulevard and Pitcairn Way     

Show more

Start date: 1 May 2018

End date: 2 June 2018

Duration: 9am - 4pm

Reason: Guardrail upgrade

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 31 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 31 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 31 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 31 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 31 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 31 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 31 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 31 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 29 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 29 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 29 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 24 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 24 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 24 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 24 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 24 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 24 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 24 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 23 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 22 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 19 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 18 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 17 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 18 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 16 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 12 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 12 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Bundall

Day 12 of 15

Streets affected: Karp Court (Left turning lane) between Bundall Road and end of cul-de-sac

 

Show more

Start date: 21 May 2018

End date: 4 June 2018                 

Duration: 7am - 4pm

Reason: Underbore to install communications cabling conduits

north

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 12

Streets affected: Musgrave Avenue (lane closure) between Wilson Street and Neville Avenue

 

Show more

Start date: 21 May 2018

End date: 1 June 2018

1 to 2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer maintenance hole refurbishment

north

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 12

Streets affected: Marine Parade (lane closure) between Nind Street and North Street

 

Show more

Start date: 21 May 2018

End date: 1 June 2018

2 days only between dates                  

Duration: 9am - 3pm

Reason: Sewer maintenance

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 12 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 11 of 11

Streets affected: Queen Street (lane closure) between Mal Burke Street and Ward Street

 

Show more

Start date: 21 May 2018

End date: 1 June 2018                  

Duration: 9am - 2:30pm

1 to 2 days only between dates                  

Reason: Sewer maintenance hole refurbishment program

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 8 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 5 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 5 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 5

Streets affected: Minnie Street (half road closure with hold and release for 2 minutes maximum) between Tweed Street and Nerang Street

                 

Show more

Start date: 28 May 2018

End date: 1 June 2018

Duration: 9:00am - 2:30pm

1 day only between dates                  

Reason: Investigative boreholes 

all regions

Bushfires

Planned - Bushfire hazard reduction burn - Clagiraba/Mount Nathan Reserve/Mungindie Court

Day 4 of 4

Mungindie Court Clagiraba

Show more

Start <time/date>: 7:00am, Tuesday 29 May (weather permitting)
End <time/date>:  7:00pm, Friday 1st June
Duration: 4days

In partnership with Queensland Fire & Emergency Service, the City will door knock residents adjoining burn locations to provide information regarding bushfire protection and preparedness leading into this year’s fire season. Minimal disruption to residents is expected.Residents with health issues associated with smoke are encouraged to contact the City’s Natural Areas Management Unit on 07 5581 6984.

For more information on the scheduled hazard reduction burn program, visit the Gold Coast Rural Fire Brigade Group website.

all regions

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 2 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 1 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 1 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 1 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 1 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

 
2 Jun - Saturday
Water and sewerage

Unplanned - Water interruption - Mudgeeraba

Day 2 of 2

Streets affected: Twilight Drive, Springtime Court, Autumn Court

Cause: Repair water main

W/O: 20424980

Notif: 1000470074

Show more

Start time and date: 2.55pm,  1 June  2018

End time and date: 4.00am, 2 June  2018

south

Water and sewerage

Unplanned - Water Interruption - Currumbin Waters

Day 2 of 2

Streets affected: Bienvenue Rive

Cause: Water Leak

W/O: 20424968

Notif: 1000470059

south

Water and sewerage

Unplanned - Water Interruption - Surfers Paradise

2.20pm - 9.30pm

Streets affected: Stanhill Drive

Cause: Repair water main

W/O: 20425062

Notif: 1000470201

central

Road closures

Planned - Temporary road closure Yatala

Day 215 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 205 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 118 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 107 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 47 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 47 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 40 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 34 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 33 of 33

Streets affected: Binstead Way (half road closure with hold and release for 2 minutes maximum) between Greenway Boulevard and Pitcairn Way     

Show more

Start date: 1 May 2018

End date: 2 June 2018

Duration: 9am - 4pm

Reason: Guardrail upgrade

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 32 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 32 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 32 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 32 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 32 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 32 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 32 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 32 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 30 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 30 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 30 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 25 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 25 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 25 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 25 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 25 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 25 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 25 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 24 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 23 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 20 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 19 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 19 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 18 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 19 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 17 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 13 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 13 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Bundall

Day 13 of 15

Streets affected: Karp Court (Left turning lane) between Bundall Road and end of cul-de-sac

 

Show more

Start date: 21 May 2018

End date: 4 June 2018                 

Duration: 7am - 4pm

Reason: Underbore to install communications cabling conduits

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 13 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 9 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 6 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 6 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 4 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 3 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 2 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 2 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 2 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 2 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

 
3 Jun - Sunday
Water and sewerage

Unplanned - Water Interruption - Palm Beach

12.55pm - 2.00pm

Streets affected: Leyte Avenue

Cause: Repair water service

W/O: 20424112

Notif: 1000469097

south

Road closures

Planned - Temporary road closure Yatala

Day 216 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 206 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 119 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 108 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 48 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 48 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 41 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 35 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 33 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 33 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 33 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 33 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 33 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 33 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 33 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 33 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 31 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 31 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 31 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 26 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 26 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 26 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 26 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 26 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 26 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 26 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 25 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 24 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 21 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 20 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 20 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 19 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 20 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 18 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 14 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 14 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Bundall

Day 14 of 15

Streets affected: Karp Court (Left turning lane) between Bundall Road and end of cul-de-sac

 

Show more

Start date: 21 May 2018

End date: 4 June 2018                 

Duration: 7am - 4pm

Reason: Underbore to install communications cabling conduits

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 14 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 10 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 7 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 7 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 5 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 4 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 4 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 3 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 3 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 3 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 3 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

 
4 Jun - Monday
Water and sewerage

Unplanned - Water interruption - Palm Beach

9.30am - 11.00am

Streets affected: Molucca Avenue

Cause: Repair water hydrant

W/O: 20424111

Notif: 1000468996

south

Water and sewerage

Unplanned - Water interruption - Nerang

10.05am - 10.35am

Streets affected: Dugandan Street

Cause: Repair water hydrant

W/O: 20423939

Notif: 1000468793

central

Road closures

Planned - Temporary road closure Yatala

Day 217 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 207 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 120 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 109 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 49 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 49 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 42 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 36 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 34 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 34 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 34 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 34 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 34 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 34 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 34 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 34 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 32 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 32 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 32 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 27 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 27 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 27 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 27 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 27 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 27 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 27 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 26 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 25 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 22 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 21 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 21 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 20 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 21 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 19 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 15 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 15 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Bundall

Day 15 of 15

Streets affected: Karp Court (Left turning lane) between Bundall Road and end of cul-de-sac

 

Show more

Start date: 21 May 2018

End date: 4 June 2018                 

Duration: 7am - 4pm

Reason: Underbore to install communications cabling conduits

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 15 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 11 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 8 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 8 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 6 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 5 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 5 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 4 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 4 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 4 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 4 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 1 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 1 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 1 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 1 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

 
5 Jun - Tuesday
Water and sewerage

Unplanned - Water interruption - Mermaid Waters

2.00pm - 3.00pm

Streets affected: Apollo Avenue

Cause: Repair water main

W/O: 20425428

Notif: 1000470635

south

Road closures

Planned - Temporary road closure Yatala

Day 218 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 208 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 121 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 110 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 50 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 50 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 43 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 37 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 35 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 35 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 35 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 35 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 35 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 35 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 35 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 35 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 33 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 33 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 33 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 28 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 28 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 28 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 28 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 28 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 28 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 28 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 27 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 26 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 23 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 22 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 22 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 21 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 22 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 20 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 16 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 16 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 16 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 12 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 9 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 9 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 7 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 6 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 6 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 5 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 5 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 5 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 5 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 2 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 2 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 2 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 2 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Water and sewerage

Planned - Sewer works - Arundel

Day 1 of 3

Streets affected: Brisbane Road

Cause: Maintenance work at sewer pump station

Ispot: 69794213

W/O: 60005286

Notif: 1000467382

Show more

Start time and date: 6.00am, 5  June  2018

End time and date: 6.00pm, 7  June  2018

central

Water and sewerage

Planned - Water interruption - Labrador

Day 1 of 3

Streets affected: Liam Court

Cause: Maintenance work at sewer pump station

Ispot: 69794273

W/O: 60005286

Notif: 1000467382

Show more

Start time and date: 6.00am, 5  June  2018

End time and date: 6.00pm, 7  June  2018

central

Road closures

Planned - Temporary Road Closure Miami

Day 1 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Bushfires

Planned - Bushfire Hazard Reduction Burn - Numinbah

8.00am - 5.00pm

Numinbah Conservation Area, 365 Chester’s Road, Numinbah

Show more

Start: 08:00am, Tuesday 5 June 2018

Finish: 5pm, Tuesday 5 June 2018

hinterland

Water and sewerage

Planned - Water interruption - Nerang

9.00am - 2.00pm

Streets affected: Country Crescent, Bluebelle Drive, Lily Crescent, Birdlife Court

Cause: Repair water main

Ispot: 69795333

W/O: 20421220

Notif: 1000465575

central

Water and sewerage

Planned - Water interruption - Broadbeach Waters

9.00am - 2.00pm

Streets affected: Cypress Drive

Cause: Work on water network

Ispot: 69792234

W/O: 60005306

Notif: 1000469564

central

Road closures

Planned - Temporary Road Closure Palm Beach

Day 1 of 3

Streets affected: Nineteenth Avenue (lane closure) between Angelica Street and Kentia Court

 

Show more

Start date: 5 June 2018

End date: 7 June 2018                 

Duration: 09:00am - 14:30pm

Reason: Pavement investigation works

south

 
6 Jun - Wednesday
Water and sewerage

Unplanned - Water interruption - Nerang

8.00am - 9.00am

Streets affected: Nerang River Drive

Cause: Repair water main

W/O: 20425805

Notif: 1000471118

central

Water and sewerage

Unplanned - Water interruption - Ormeau

11.50am - 12.50pm

Streets affected: Duranta Street

Cause: Repair water hydrant

W/O: 20421735

Notif: 1000466152

north

Water and sewerage

Unplanned - Water Interruption - Helensvale

2.35pm - 3.35pm

Streets affected: Ferrymans Court

Cause: Repair hydrant

W/O: 20420202

Notif: 1000464442

north

Road closures

Planned - Temporary road closure Yatala

Day 219 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 209 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 122 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 111 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 51 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 51 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 44 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 38 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 36 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 36 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 36 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 36 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 36 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 36 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 36 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 36 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 34 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 34 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 34 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 29 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 29 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 29 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 29 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 29 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 29 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 29 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 28 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 27 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 24 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 23 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 23 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 22 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 23 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 21 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 17 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 17 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 17 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 16 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 13 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 10 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 10 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 8 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 7 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 7 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 6 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 6 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 6 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 6 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 3 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 3 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 3 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 3 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Water and sewerage

Planned - Sewer works - Arundel

Day 2 of 3

Streets affected: Brisbane Road

Cause: Maintenance work at sewer pump station

Ispot: 69794213

W/O: 60005286

Notif: 1000467382

Show more

Start time and date: 6.00am, 5  June  2018

End time and date: 6.00pm, 7  June  2018

central

Water and sewerage

Planned - Water interruption - Labrador

Day 2 of 3

Streets affected: Liam Court

Cause: Maintenance work at sewer pump station

Ispot: 69794273

W/O: 60005286

Notif: 1000467382

Show more

Start time and date: 6.00am, 5  June  2018

End time and date: 6.00pm, 7  June  2018

central

Road closures

Planned - Temporary Road Closure Miami

Day 2 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 2 of 3

Streets affected: Nineteenth Avenue (lane closure) between Angelica Street and Kentia Court

 

Show more

Start date: 5 June 2018

End date: 7 June 2018                 

Duration: 09:00am - 14:30pm

Reason: Pavement investigation works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 1 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Water and sewerage

Planned - Water Interruption - Pimpama

7.00am - 4.00pm

Streets affected: Dixon Drive, Soldier Bird Avenue

Cause: New water connection

Ispot: 69788118

W/O: 52009568

Notif: 1000430503

north

Road closures

Planned - Temporary Road Closure Bundall

Day 1 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 2.00pm

Streets affected: Mary Gilmour Court

Cause: Replace water hydrant

Ispot: 69763502

W/O: 20423793

Notif: 1000468629

south

Water and sewerage

Planned - Water interruption - Currumbin Waters

9.00am - 2.00pm

Streets affected: Ora Court, Mayfair Street, Narbine Street, Herbert Street

Cause: Replace water main

Ispot: 69804572

W/O: 60005086

Notif: 1000442445

south

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 1 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 1 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 1 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Water and sewerage

Planned - Water Interruption - Pimpama

Day 1 of 2

Streets affected: Depot Road, Pimpama Jacob Well Road, Old Pacific Highway

Cause: Work on  water main

Ispot: 69814452

W/O: 52009680

Notif: 1000466855

Show more

Start time and date: 7.00pm, 6 June  2018

End time and date: 4.00am, 7 June  2018

north

 
7 Jun - Thursday
Water and sewerage

Unplanned - Water Interruption - Yatala

5.00am - 6.00am

Streets Affected : Union Circuit

Causes : Repair to Water Hydrant

W/O : 20420868

Notif : 1000465136

north

Water and sewerage

Unplanned - Water interruption - Biggera Waters

11.35am - 12.35pm

Streets affected: Vaggelas Crescent

Cause: Repair water service

W/O: 20425203

Notif: 1000470771

north

Water and sewerage

Unplanned - Water interruption - Southport

5.10pm - 7.30pm

Streets affected: Minnie Street

Cause: Water main repairs

W/O: 20426413

Notif: 1000471933

central

Road closures

Planned - Temporary road closure Yatala

Day 220 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 210 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 123 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 112 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 52 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 52 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 45 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 39 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 37 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 37 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 37 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 37 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 37 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 37 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 37 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 37 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 35 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 35 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 35 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 30 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 30 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 30 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 30 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 30 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 30 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 30 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 29 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 28 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 25 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 24 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 24 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 23 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 24 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 22 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 18 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 18 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 18 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 17 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 14 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 11 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 11 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 9 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 9 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 8 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 8 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 7 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 7 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 7 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 7 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 4 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 4 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 4 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 4 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Water and sewerage

Planned - Sewer works - Arundel

Day 3 of 3

Streets affected: Brisbane Road

Cause: Maintenance work at sewer pump station

Ispot: 69794213

W/O: 60005286

Notif: 1000467382

Show more

Start time and date: 6.00am, 5  June  2018

End time and date: 6.00pm, 7  June  2018

central

Water and sewerage

Planned - Water interruption - Labrador

Day 3 of 3

Streets affected: Liam Court

Cause: Maintenance work at sewer pump station

Ispot: 69794273

W/O: 60005286

Notif: 1000467382

Show more

Start time and date: 6.00am, 5  June  2018

End time and date: 6.00pm, 7  June  2018

central

Road closures

Planned - Temporary Road Closure Miami

Day 3 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 3

Streets affected: Nineteenth Avenue (lane closure) between Angelica Street and Kentia Court

 

Show more

Start date: 5 June 2018

End date: 7 June 2018                 

Duration: 09:00am - 14:30pm

Reason: Pavement investigation works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 2 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 2 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 2 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 2 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 2 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Water and sewerage

Planned - Water Interruption - Pimpama

Day 2 of 2

Streets affected: Depot Road, Pimpama Jacob Well Road, Old Pacific Highway

Cause: Work on  water main

Ispot: 69814452

W/O: 52009680

Notif: 1000466855

Show more

Start time and date: 7.00pm, 6 June  2018

End time and date: 4.00am, 7 June  2018

north

Water and sewerage

Planned - Water Interruption - Pimpama - Cancelled due weather

7.00am - 4.00pm

Streets affected: Dixon Drive, Soldier Bird Avenue

Cause: New water connection

Ispot: 69791102

W/O: 52009568

Notif: 1000430503

north

Water and sewerage

Planned - Water interruption - Mermaid Beach

9.00am - 2.00pm

Streets affected: Venice Street, Hedges Avenue, Ocean Street, Gold Coast Highway

Cause: Install water  valve

Ispot: 69806188

W/O: 60005307

Notif: 1000469771

south

 
8 Jun - Friday
Water and sewerage

Unplanned - Water Interruption - Oxenford

9.40am - 10.40am

Streets affected: Oregon Way

Cause: Repair water hydrant

W/O: 20418306

Notif: 1000462180

north

Water and sewerage

Unplanned - Water Interruption - Ashmore

11.45am - 4.00pm

Streets affected: Ashmore Road

Cause: Repair water main

W/O: 20426536

Notif: 1000472106

central

Water and sewerage

Unplanned - Water interruption - Burleigh Heads

12.10pm - 2.10pm

Streets affected: Mary Gilmour Crescent

Cause: Repair water main

W/O: 20426271

Notif: 1000471737

south

Road closures

Planned - Temporary road closure Yatala

Day 221 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 211 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 124 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 113 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 53 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 53 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 46 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 40 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 38 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 38 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 38 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 38 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 38 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 38 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 38 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 38 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 36 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 36 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 36 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 31 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 31 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 31 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 31 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 31 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 31 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 31 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 30 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 29 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 26 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 25 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 25 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 24 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 25 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 23 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 19 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 19 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 19 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 18 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 12 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 12 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 10 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 10 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 9 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 9 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 8 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 8 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 8 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 8 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 5 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 5 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 5 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 5 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 4 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 3 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 3 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 3 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 3 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 3 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 1 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 1 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Water and sewerage

Planned - Water interruption - Mermaid Waters

9.00am - 2.00pm

Streets affected: Quest Court

Cause: Relocate water main

Ispot: 69839326

W/O: 60004191

Notif: 1000442445

south

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

 
9 Jun - Saturday
Water and sewerage

Unplanned - Water interruption - Surfers Paradise

12.00pm - 1.20pm

Streets affected: Tarcoola Crescent

Cause: Water Leak

W/O: 20426714

Notif: 1000472353

central

Road closures

Planned - Temporary road closure Yatala

Day 222 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 212 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 125 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 114 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 54 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 54 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 47 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 41 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 39 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 39 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 39 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 39 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 39 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 39 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 39 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 39 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 37 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 37 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 37 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 32 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 32 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 32 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 32 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 32 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 32 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 32 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 30 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 27 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 26 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 26 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 25 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 26 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 24 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 20 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 20 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 20 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 19 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 16 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 13 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 10 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 10 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 9 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 9 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 9 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 9 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 6 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 6 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 6 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 6 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 5 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 4 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 4 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 4 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 4 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 4 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 2 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 2 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Water and sewerage

Planned - Water interruption - Coomera

Day 1 of 2

Streets affected: Foxwell Road, Oakley Creek Road

Cause: Work on water main network

Ispot: 69856628

W/O: 52009722

Notif: 1000470512

Show more

Start time and date: 9.30pm, 9  June  2018

End time and date: 4.00am, 10  June  2018

north

Road closures

Planned - Temporary Road Closure Labrador

Day 1 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

 
10 Jun - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 223 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 213 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 126 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 115 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 55 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 55 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 48 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 42 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 40 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 40 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 40 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 40 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 40 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 40 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 40 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 40 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 38 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 38 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 38 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 33 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 33 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 33 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 33 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Robina

Day 33 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 33 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 33 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 31 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 28 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 27 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 27 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 26 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 27 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 25 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 21 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 21 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 21 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 20 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 17 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 11 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 11 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 10 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 10 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 10 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 10 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 7 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 7 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 7 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 7 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 6 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 5 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 5 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 5 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 5 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 5 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 3 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 3 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Water and sewerage

Planned - Water interruption - Coomera

Day 2 of 2

Streets affected: Foxwell Road, Oakley Creek Road

Cause: Work on water main network

Ispot: 69856628

W/O: 52009722

Notif: 1000470512

Show more

Start time and date: 9.30pm, 9  June  2018

End time and date: 4.00am, 10  June  2018

north

Road closures

Planned - Temporary Road Closure Labrador

Day 2 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

 
11 Jun - Monday
Water and sewerage

Unplanned - Water Interruption - Hope Island

4.50am - 10.00am

Streets affected: Santa Barbara Road (and surrounding streets)

Cause: Repair water main

W/O: 20426765

Notif: 1000472419

north

Water and sewerage

Unplanned - Water Interruption - Bonogin

6.20pm - 9.20pm

Streets affected: Bonogin Road

Cause: Water Leak

W/O: 20427019

Notif: 1000472667

south

Road closures

Planned - Temporary road closure Yatala

Day 224 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 214 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 127 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 116 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 56 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 56 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 49 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 43 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 41 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 41 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 41 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 41 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 41 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 41 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 41 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 41 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 39 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 39 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 39 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 34 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 34 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 34 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 34 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 34 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 32 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 29 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 28 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 28 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 27 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 28 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 26 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 22 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 22 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 22 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 21 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 12 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 12 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 11 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 11 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 11 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 11 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 8 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 8 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 8 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 8 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 7 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 6 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 6 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 6 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 6 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 6 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 4 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 4 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 3 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary Road Closure Tugun

Day 1 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 1 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Water and sewerage

Planned - Water Interruption - Pimpama

7.00am - 4.00pm

Streets affected: Dixon Drive, Soldier Bird Avenue

Cause: New water main connection

W/O: 52009568

Notif: 1000430503

 

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 1 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

9.00am - 2.00pm

Streets affected: Tallebudgera Creek Road

Cause: Repair water valve

Ispot: 69855459

W/O: 20411761

Notif: 1000454410

south

 
12 Jun - Tuesday
Water and sewerage

Unplanned - Water Interruption Paradise Point

4.50am - 7.20pm

Streets affected: Grice Avenue

Cause: Repair water main

Notif. 1000472810

W/O. 20427114

north

Water and sewerage

Unplanned - Water interruption - Labrador

10.55am - 2.00pm

Streets affected: Jimmieson Avenue, Beeka Street

Cause: Repair water main

W/O: 20427213

Notif: 1000472908

central

Water and sewerage

Unplanned - Water interruption - Mudgeeraba

11.30am - 3.00pm

Streets affected: Natan Road

Cause: Repair water main

W/O: 60005305

Notif: 1000469449

south

Water and sewerage

Unplanned - Water interruption - Labrador

6.30pm - 10.00pm

Streets affected: Muir Street

Cause: Water Leak

W/O: 20427482

Notif: 1000473240

central

Water and sewerage

Unplanned - Water interruption - Carrara

10.00pm - 11.50pm

Streets affected: LakeView Drive

Cause: Water Leak

W/O: 20419774

Notif: 1000463966

central

Water and sewerage

Unplanned - Water interruption - Labrador

10.15pm - 11.45pm

Streets affected: Muir Street

Cause: Water Leak

W/O: 20427482

Notif: 1000473240

central

Road closures

Planned - Temporary road closure Yatala

Day 225 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 215 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 128 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 117 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 57 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 57 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 50 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 44 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 42 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 42 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 42 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 42 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 42 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 42 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 42 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 42 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 40 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 40 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ormeau

Day 35 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 35 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 35 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 35 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 35 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 33 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 30 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 29 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 29 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 28 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 29 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 27 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 23 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 23 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 23 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 22 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 19 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 13 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 13 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 12 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 12 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 12 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 12 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 9 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 9 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 9 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 9 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 8 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 7 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 7 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 7 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 7 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 7 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 5 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 5 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 4 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary Road Closure Tugun

Day 2 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 2 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Water and sewerage

Planned - Water interruption - Tugun

9.00am - 2.00pm

Streets affected: Coolangatta Road

Cause: New connection to water main

Ispot: 69830317

W/O: 52009701

Notif: 1000469712

south

 
13 Jun - Wednesday
Water and sewerage

Unplanned - Water interruption - Surfers Paradise

9.15am - 10.15am

Streets affected: Stanhill Drive

Cause: Repair water hydrant

W/O: 30045008

Notif: 1000468346

central

Water and sewerage

Unplanned - Water interruption - Currumbin Waters

10.00am - 11.00am

Streets affected: Togo's Avenue, Just Street

Cause: Repair water main

W/O: 20426643

Notif: 1000472267

south

Water and sewerage

Unplanned - Water interruption - Mudgeeraba

10.15am - 11.15am

Streets affected: Moonbean Parade, Twilight Drive

Cause: Repair water hydrant

W/O: 60005236

Notif: 1000462462

south

Water and sewerage

Unplanned - Water interruption - Ormeau

11.10am - 12.10pm

Streets affected: Daniells Court

Cause: Repair water hydrant

W/O: 20425201

Notif: 1000470330

north

Water and sewerage

Unplanned - Water interruption - Ormeau

2.15pm - 3.15pm

Streets affected: Senna Street

Cause: Repair water hydrant

W/O: 20420335

Notif: 1000464577

north

Road closures

Planned - Temporary road closure Yatala

Day 226 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 216 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 129 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 118 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 58 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 58 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 51 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 45 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 43 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 43 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Hope Island

Day 43 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Miami

Day 43 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 43 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 43 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 43 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 43 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 41 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 41 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ormeau

Day 36 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 36 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 36 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 36 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 36 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 34 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 31 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 30 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 30 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 29 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 30 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 28 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 24 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 24 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 24 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 23 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 20 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 14 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 14 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 13 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 13 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 13 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 13 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 10 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 10 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 10 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 10 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 9 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 8 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 8 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 8 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 8 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 8 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 6 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 6 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 5 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary Road Closure Tugun

Day 3 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 3 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 1 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 1 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Water and sewerage

Planned - Water Interruption - Helensvale - CANCELLED

9.00am - 2.00pm

Streets affected: Careel Close

Cause: Work on water main

Ispot: 69807907

W/O: 52009720

Notif: 1000469929

 

north

Water and sewerage

Planned - Water interruption - Surfers Paradise

9.00am - 2.00pm

Streets affected: Darrambal Street, Adori Street, Thomas Drive, Illawong Street, Stanhill Drive

Cause: Replace water main

Ispot: 69865433

W/O: 60005304

Notif: 1000468329

 

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 3

Streets affected: Leo Graham Way (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Tamborine Oxenford Road

Show more

Start date: 13 June 2018

End date: 15 June 2018

Duration: 9am - 2.30pm

Reason: Pavement investigation

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 1 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

 
14 Jun - Thursday
Water and sewerage

Unplanned - Water interruption - Broadbeach Waters

10.35am - 11.20am

Streets affected: Lamb Street

Cause: Repair water main

W/O: 20427976

Notif: 1000473840

central

Water and sewerage

Unplanned - Water interruption - Varsity Lakes

11.00am - 12.00pm

Streets affected: Notre Dame Court

Cause: Repair water hydrant

W/O: 20424105

Notif: 1000469015

south

Water and sewerage

Unplanned - Water interruption - Upper Coomera

11.00am - 12.00pm

Streets affected: Ghost Gum Grove, Manassa Street

Cause: Repair water hydrant

W/O: 20414017

Notif: 1000459123

north

Water and sewerage

Unplanned - Water interruption - Tugun

1.25pm - 2.25pm

Streets affected: Kitchner Street

Cause: Repair water hydrant

W/O: 20427131

Notif: 1000472830

south

Water and sewerage

Unplanned - Water Interruption Paradise Point

11.00pm - 11.59pm

Streets affected: Nankeen Avenue

Cause: Repair water service

Notif. 1000473368

W/O. 20427594

north

Road closures

Planned - Temporary road closure Yatala

Day 227 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 217 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 130 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 119 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 59 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 59 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 52 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 46 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 32 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 31 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 31 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 30 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 31 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 29 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 25 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 25 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 25 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 24 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 21 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 16 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 15 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 14 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 14 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 14 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 14 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 11 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 11 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 11 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 11 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 10 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 9 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 9 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 9 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 9 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 9 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 7 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 7 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 6 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary Road Closure Tugun

Day 4 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 4 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 2 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 2 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 3

Streets affected: Leo Graham Way (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Tamborine Oxenford Road

Show more

Start date: 13 June 2018

End date: 15 June 2018

Duration: 9am - 2.30pm

Reason: Pavement investigation

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 2 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Mosquito spraying

Planned - Mosqito/Biting midge spraying - Benowa Waters, Broadbeach Waters, Isle of Capri, Mermaid Waters, Sorrento.

4.00am - 6.00am

Areas affected: Benowa Waters, Broadbeach Waters, Isle of Capri, Mermaid Waters, Sorrento.

Mosquito/biting midge spraying will be undertaken in these areas on Thursday 14th June 2018 from 4am to 6am for control of mosquitos and biting midges (weather permitting). 

all regions

Water and sewerage

Planned - Water interruption - Mermaid Waters

9.00am - 2.00pm

Streets affected: Quest Court

Cause: Relocate water main

Ispot: 69881702

W/O: 60004191

Notif: 1000442445

 

south

Water and sewerage

Planned - Water interruption - Currumbin Waters

9.00am - 3.15pm

Streets affected: Currumbin Creek Road, Galleon Way, Tierney Drive

Cause: Work on water main

Ispot: 69823543

W/O: 60005323

Notif: 1000470382

 

south

Road closures

Planned - Temporary Road Closure Nerang

Day 1 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

 
15 Jun - Friday
Water and sewerage

Unplanned - Water interruption - Surfers Paradise

12.25pm - 1.25pm

Streets affected: Stanhill Drive

Cause: Repair water hydrant

W/O: 20421896

Notif: 1000466307

central

Water and sewerage

Unplanned - Water interruption - Ashmore

1.35pm - 2.35pm

Streets affected: Heeb Street on corner of Devco Place, Devco Place

Cause: Repair water hydrant

W/O: 20425115

Notif: 1000470194

central

Water and sewerage

Unplanned - Water interruption - Mudgeeraba

2.15pm - 3.15pm

Streets affected: Mudgeeraba Road

Cause: Repair water hydrant

W/O: 20424727

Notif: 1000469724

south

Road closures

Planned - Temporary road closure Yatala

Day 228 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 218 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 131 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 120 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 60 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 60 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 53 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 47 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 33 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 32 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 32 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 31 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 32 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 30 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 26 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 26 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 26 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 25 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 22 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 17 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 16 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 16 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 15 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 15 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 15 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 15 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 12 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 12 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 12 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 12 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 11 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 10 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 10 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 10 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 10 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 10 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 8 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 8 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 7 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary Road Closure Tugun

Day 5 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 5 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 3 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 3 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Oxenford

Day 3 of 3

Streets affected: Leo Graham Way (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Tamborine Oxenford Road

Show more

Start date: 13 June 2018

End date: 15 June 2018

Duration: 9am - 2.30pm

Reason: Pavement investigation

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 3 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 2 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 1 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

 
16 Jun - Saturday
Water and sewerage

Unplanned - Water Interruption - Helensvale

5.35pm - 6.35pm

Streets affected: Lachlan Court

Cause: Water Leak

W/O: 20428526

Notif: 1000474499

all regions

Road closures

Planned - Temporary road closure Yatala

Day 229 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 219 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 132 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 121 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 61 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 61 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 54 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 34 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 33 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 33 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 32 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 31 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 27 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 27 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 26 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 23 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 18 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 17 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 16 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 16 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 16 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 16 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 13 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 13 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Norwell

Day 13 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Yatala

Day 13 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Miami

Day 12 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 11 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 11 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 11 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 11 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 11 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 9 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 9 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Tugun

Day 6 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 6 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 4 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 4 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 4 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 3 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 2 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 1 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 1 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

 
17 Jun - Sunday
Water and sewerage

Unplanned - Water interruption - Miami

11.25am - 1.25pm

Streets affected: Chainey Avenue

Cause: Water Leak

W/O: 20427459

Notif: 1000473196

south

Road closures

Planned - Temporary road closure Yatala

Day 230 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 220 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 133 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 122 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 62 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 62 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 55 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 35 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 34 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 33 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 32 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 28 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 28 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 27 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 24 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 19 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 17 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 17 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 17 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 17 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 14 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 14 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Miami

Day 13 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 12 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 12 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 12 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 12 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 12 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 10 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 10 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 10 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 10 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Tugun

Day 7 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 7 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 5 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 5 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 5 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 4 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 3 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 2 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 2 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

 
18 Jun - Monday
Water and sewerage

Unplanned - Sewer works - Helensvale and Paradise Point

Day 1 of 2

Streets affected: Helensvale on Oxenford - Southport Road between roundabout at Monterey Keys Drive and Riverlinks Boulevard.

                             Paradise Point Falkinder Street between Grice Avenue and Paradise Parade

Cause:

Sewerage main break:

  • There is no interruption to sewerage service,

  • Tankering of sewer has been organised resulting in noise and temporary lighting which may impact some customers in the Hope Island area

  • Tankers driving to dump points in Faulkner Street Paradise Point and at OX45 in Oxenford will occur until the repairs are complete. Customers in these streets may also be impacted by noise.

  • We apologise for any inconvenience and thank all Customer’s/Residents/Visitors for their patience and assistance.

 

W/O: 34567890

Notif: 56789012

Show more

Start time and date: 3.30pm, 18 June  2018

End time and date: 6.00am, 19  June  2018

north

Water and sewerage

Unplanned - Water interruption - Labrador

Day 1 of 2

Streets affected: Bright Avenue

Cause: Water Leak

W/O: 20428838

Notif: 1000474936

Show more

Start time and date: 9.45pm, 18 June 2018

End time and date: 1.45am, 19 June 2018

central

Road closures

Planned - Temporary road closure Yatala

Day 231 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 221 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 134 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 123 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 63 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 63 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 56 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 36 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 35 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 34 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 29 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 29 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 28 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 25 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 20 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 19 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 18 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 18 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 18 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 18 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 15 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 15 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Miami

Day 14 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 13 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 13 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 13 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 13 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 13 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 11 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 11 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 11 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 11 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Tugun

Day 8 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 8 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 6 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 6 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 6 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 5 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 4 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 3 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 1 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Water and sewerage

Planned - Sewer works - Labrador

Day 1 of 5

Streets affected: Government Road, Parker Street

Cause: Cleaning sewer mains

Ispot: 69897942

W/O: 10309045

Notif: 1000220403

 

 

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22  June  2018

central

Water and sewerage

Planned - Sewer works - Arundel

Day 1 of 5

Streets affected: Putter Place, Carnoustie Court

Cause: Cleanibg sewer mains

Ispot: 69900116

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22 June  2018

central

Water and sewerage

Planned - Sewer works - Parkwood

Day 1 of 5

Streets affected: Stadler Court, Greg Norman Crescent, Napper Road, Desert Falls Crescent, Hazeltime Place, Parkwood Boulevard

Cause: Cleaning sewer mains

Ispot: 69900000

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22  June  2018

central

Water and sewerage

Planned - Sewer works - Southport

Day 1 of 5

Streets affected: Slatyer Avenue, Benowa Road, Ridgeway Avenue

Cause: Cleaning sewer mains

Ispot: 69897995

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22  June  2018

central

Water and sewerage

Planned - Sewer works - Nerang

Day 1 of 5

Streets affected: Dugandan Street, Koola Drive, Lawrence Drive, Pine Grove Street

Cause: Cleaning sewer mains

Ispot: 69899206

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22 June  2018

central

Water and sewerage

Planned - Sewer works - Ashmore

Day 1 of 5

Streets affected: Pinkwood Drive, Conebush Street, Sapium Road

Cause: Cleaning sewer mains

Ispot: 69898016

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22 June  2018

central

Water and sewerage

Planned - Sewer works - Tallai

Day 1 of 5

Streets affected: Haylett Court

Cause: Cleaning sewer mains

Ispot: 69900168

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22 June  2018

south

Water and sewerage

Planned - Sewer works - Mudgeeraba

Day 1 of 5

Streets affected: Robert Street, Ziedan Drive, Old Coach Road, Railway Street, Constellation Crescent

Cause: Cleaning sewer mains

Ispot: 69899815

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22  June  2018

south

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 1 of 12

Streets affected: Venice Street (lane closure) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 18 June 2018

End date: 29 June 2018

1 day only between dates                  

Duration: 7am - 5pm

Reason: Profile and reseal roadway

south

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Water and sewerage

Planned - Water Interruption - Elanora

9.00am - 2.00pm

Streets affected: Silver Glade Drive, Hibertia Avenue, Brush Box Street, Laurina Court, Bidwell Court, Water Gum Street, Leopard Avenue, Eudonia Court ,Breynia Court, Acmena Court and Forest Drive

Cause: Replace water main

Ispot: 69906894

W/O: 20426068

Notif: 1000471497

south

Water and sewerage

Planned - Water interruption - Bilinga

9.00am - 2.00pm

Streets affected: Pacific Parade between Graham Street and Johnston Street 

Cause: New water connection

Ispot: 69915076

W/O: 52009663

Notif: 1000462463

south

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 13

Streets affected: Harriet Lane and Kopps Road (full road closure local traffic access only) between Cathmor Court / Harriet Lane and End of Road

Show more

Start date: 18 June 2018

End date: 30 June 2018

Duration: Continuous

Reason: Stormwater, sewer and electrical works

north

 
19 Jun - Tuesday
Water and sewerage

Unplanned - Sewer works - Helensvale and Paradise Point

Day 2 of 2

Streets affected: Helensvale on Oxenford - Southport Road between roundabout at Monterey Keys Drive and Riverlinks Boulevard.

                             Paradise Point Falkinder Street between Grice Avenue and Paradise Parade

Cause:

Sewerage main break:

  • There is no interruption to sewerage service,

  • Tankering of sewer has been organised resulting in noise and temporary lighting which may impact some customers in the Hope Island area

  • Tankers driving to dump points in Faulkner Street Paradise Point and at OX45 in Oxenford will occur until the repairs are complete. Customers in these streets may also be impacted by noise.

  • We apologise for any inconvenience and thank all Customer’s/Residents/Visitors for their patience and assistance.

 

W/O: 34567890

Notif: 56789012

Show more

Start time and date: 3.30pm, 18 June  2018

End time and date: 6.00am, 19  June  2018

north

Water and sewerage

Unplanned - Water interruption - Labrador

Day 2 of 2

Streets affected: Bright Avenue

Cause: Water Leak

W/O: 20428838

Notif: 1000474936

Show more

Start time and date: 9.45pm, 18 June 2018

End time and date: 1.45am, 19 June 2018

central

Water and sewerage

Unplanned - Water interruption - Labrador

10.10am - 11.10am

Streets affected: Elm Court

Cause: Repair water hydrant

W/O: 20428956

Notif: 1000475070

central

Water and sewerage

Unplanned - Water interruption - Hope Island

1.30pm - 6.00pm

Streets affected: Viewline Terrace

Cause: Repair water main

W/O: 20428275

Notif: 1000474501

north

Water and sewerage

Unplanned - Water interruption - Labrador

2.45pm - 3.45pm

Streets affected: Brisbane Road between Jacob Drive and Babidge Street

Cause: Repair water hydrant

W/O: 20428220

Notif: 1000474118

central

Road closures

Planned - Temporary road closure Yatala

Day 232 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 222 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 135 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 124 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 64 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 64 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 57 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 37 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 36 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 35 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 30 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 30 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 29 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 26 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 21 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 20 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 19 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 19 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 19 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 19 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 16 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 15 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 14 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 14 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 14 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 14 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 12 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 12 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Tugun

Day 9 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 9 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 7 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 7 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 7 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 6 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 5 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 4 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 4 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 2 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Water and sewerage

Planned - Sewer works - Labrador

Day 2 of 5

Streets affected: Government Road, Parker Street

Cause: Cleaning sewer mains

Ispot: 69897942

W/O: 10309045

Notif: 1000220403

 

 

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22  June  2018

central

Water and sewerage

Planned - Sewer works - Arundel

Day 2 of 5

Streets affected: Putter Place, Carnoustie Court

Cause: Cleanibg sewer mains

Ispot: 69900116

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22 June  2018

central

Water and sewerage

Planned - Sewer works - Parkwood

Day 2 of 5

Streets affected: Stadler Court, Greg Norman Crescent, Napper Road, Desert Falls Crescent, Hazeltime Place, Parkwood Boulevard

Cause: Cleaning sewer mains

Ispot: 69900000

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22  June  2018

central

Water and sewerage

Planned - Sewer works - Southport

Day 2 of 5

Streets affected: Slatyer Avenue, Benowa Road, Ridgeway Avenue

Cause: Cleaning sewer mains

Ispot: 69897995

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22  June  2018

central

Water and sewerage

Planned - Sewer works - Nerang

Day 2 of 5

Streets affected: Dugandan Street, Koola Drive, Lawrence Drive, Pine Grove Street

Cause: Cleaning sewer mains

Ispot: 69899206

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22 June  2018

central

Water and sewerage

Planned - Sewer works - Ashmore

Day 2 of 5

Streets affected: Pinkwood Drive, Conebush Street, Sapium Road

Cause: Cleaning sewer mains

Ispot: 69898016

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22 June  2018

central

Water and sewerage

Planned - Sewer works - Tallai

Day 2 of 5

Streets affected: Haylett Court

Cause: Cleaning sewer mains

Ispot: 69900168

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22 June  2018

south

Water and sewerage

Planned - Sewer works - Mudgeeraba

Day 2 of 5

Streets affected: Robert Street, Ziedan Drive, Old Coach Road, Railway Street, Constellation Crescent

Cause: Cleaning sewer mains

Ispot: 69899815

W/O: 10309045

Notif: 1000220403

Show more

Start time and date: 7.00am, 18  June  2018

End time and date: 4.00pm, 22  June  2018

south

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 2 of 12

Streets affected: Venice Street (lane closure) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 18 June 2018

End date: 29 June 2018

1 day only between dates                  

Duration: 7am - 5pm

Reason: Profile and reseal roadway

south

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 13

Streets affected: Harriet Lane and Kopps Road (full road closure local traffic access only) between Cathmor Court / Harriet Lane and End of Road

Show more

Start date: 18 June 2018

End date: 30 June 2018

Duration: Continuous

Reason: Stormwater, sewer and electrical works

north

Water and sewerage

Planned - Water interruption - Coolangatta

9.00am - 3.00pm

Streets affected: Dixon Street, Ballow Street, Dutton Street

Cause: New water connection

Ispot: 69830277

W/O: 52009702

Notif: 1000469714

south

 
20 Jun - Wednesday
Water and sewerage

Unplanned - Water interruption - Gaven

9.30am - 10.00am

Streets affected: Castle Hill Drive, Narrabri Court

Cause: Repair water main

W/O: 20428491

Notif: 1000474446

central

Water and sewerage

Unplanned - Water interruption - Nerang

2.20pm - 3.20pm

Streets affected: Country Crescent

Cause: Repair water hydrant

W/O: 20426255

Notif: 1000471712

central

Water and sewerage

Unplanned - Water interruption - Mermaid Beach

3.25pm - 3.55pm

Streets affected: Petrel Avenue

Cause: Repair water main

W/O: 20428872

Notif: 1000475778

south

Water and sewerage

Unplanned - Water Interruption Helensvale

9.50pm - 10.50pm

Streets affected: Hannaford Place

Cause: Repair water service

Notif. 1000473371

W/O. 20427463

north

Road closures

Planned - Temporary road closure Yatala

Day 233 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 223 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 136 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 125 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 65 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 65 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 58 of 68

Streets affected: Robert Street and Muir Street