Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

June 2019

Jump to today
1 Jun - Saturday
Water and sewerage

Unplanned - Water Interruption - Coolangatta

Day 1 of 2

Streets affected : Musgrave St , Garrick St  , Rutledge St

Cause : Repair water main

W/O : 20515295

Notif : 1000576955

Show more

Start time and date: 4.30pm, 1 June  2019

End time and date: 7.00am, 2 June  2019

south

Water and sewerage

Unplanned - Water Interruption - Hollywell

9.45pm - 10.45pm

Streets affected : Clematis Ave.

Cause : Repair water main

W/O : 20515293

Notif : 1000576952

north

Road closures

Planned - Road closure - Southport

Day 302 of 302

Streets affected: Davenport Street (full road closure local traffic access only) between Nerang Street and Young Street

Show more

Start date: 4 August 2018

End date: 1 June 2019

9 days only between dates                  

Duration: 12:30pm - 11:00pm

Reason: Chinatown Markets for 2018/19

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 201 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 185 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 139 of 200

Streets affected: Old Coach Road between Phaeton Street and Days Road; Days Road between Coomera Grand Drive and Old Coach Road (verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 12am – 11:59pm

Reason: Intersection Upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 139 of 200

Streets affected: Old Coach Road between Days Road and Coomera Grand Drive; also between Phaeton Street and Days Road (partial lane, bike lane and verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 121 of 150

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure)

Show more

Start date: 1 February 2019

End date: 30 June 2019

Duration: 6:30am – 2:30pm

Reason: Lane closure on approach to and including roundabout

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 120 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 107 of 136

Streets affected: Marine Parade (parking lane/bay closure with hold and release for 2 minutes maximum) between Ocean Street and Taylor Street

Show more

Start date: 15 February 2019

End date: 30 June 2019

Duration 1: 6:30am – 6pm (Hold and Release)

Duration 2: 12am - 11:59pm (car park)

Reason: To support the turning and entering of extra long vehicles into Quota Park for works activities

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 95 of 99

Streets affected: River Terrace (verge/footpath, full road closure with local access only) between Enderley Avenue and End of road

Show more

Start date: 27 February 2019

End date: 5 June 2019

Duration: 12am – 11:59pm

Reason: Construction of emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 93 of 93

Streets affected: Days Road (half road closure with detours in place) between Coomera Grand Drive and Old Coach Road

Show more

Start date: 1 March 2019

End date: 1 June 2019

Duration: 12am – 11:59pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Southport

Day 93 of 93

Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone, half road closure) between Bay Street and Windmill Street

Show more

Start date: 1 March 2019

End date: 1 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction deliveries only when required

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 93 of 93

Streets affected: Mallana Street (half road closure with hold and release for 2 minutes maximum) between Holborow Close and End of road

Show more

Start date: 1 March 2019

End date: 1 June 2019

Duration: 6:30am – 6:30pm

Reason: Use of vehicles and trucks for construction activities, delivery of materials and equipment to site

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 93 of 120

Streets affected: Marine Parade (half road, partial verge/footpath closure with hold and release for 2 minutes maximum) between Burrows Street and Taylor Street

Show more

Start date: 1 March 2019

End date: 28 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate delivery vehicles and concrete pours

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 90 of 93

Streets affected: Old Burleigh Road (verge/footpath closure) between Fern Street and Wharf Road

Show more

Start date: 4 March 2019

End date: 4 June 2019

Duration: 12am – 11:59pm

Reason: For the placement of site sheds

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 90 of 93

Streets affected: Wharf Road (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 4 March 2019

End date: 4 June 2019

Duration: 6:30am – 10pm

Reason: To facilitate roadworks, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 88 of 93

Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street

Show more

Start date: 6 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries and ingress and egress of vehicles; also to facilitate large concrete pours

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 87 of 92

Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 7 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 87 of 123

Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 March 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 85 of 92

Streets affected: Gold Coast Highway (footpath closure) between Connor Street and West Street

Show more

Start date: 9 March 2019

End date: 8 June 2019

Duration: 12am – 11:59pm

Reason: Occupation of footpath for location of overhead gantry

south

Road closures

Planned - Temporary Road Closure - Southport

Day 83 of 93

Streets affected: 216 Queen Street (verge/footpath closure with hold and release for 2 minutes maximum) between Mal Burke Street and Ward Street

Show more

Start date: 11 March 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: Construction activities for the demolition of an existing dwelling plus the site establishment for building a new 4 storey unit development

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 79 of 108

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure on approach to and including roundabout)

Show more

Start date: 15 March 2019

End date: 30 June 2019

Duration: 6:30am – 5:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Robina

Day 77 of 175

CBUS Super Stadium - Events - NRL Season

Show more

Cheltenham Drive (Westbound) - CLOSED - local access only.

Robina Station Road - CLOSED - buses only.

Stadium Drive - CLOSED - pedestrians only.

Game Dates:

17 March 2019   /   12 April 2019   /   21 April 2019   /   18 May 2019   /   14 June 2019

29 June 2019   /   21 July 2019   /   27 July 2019   /   16 August 2019   /   7 September 2019

Duration: 7am – 11:30pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 75 of 93

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 19 March 2019

End date: 19 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 73 of 92

Streets affected: Twenty Forth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N

 

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: Midnight 11:59pm

Reason: Continuous partial verge/footpath closure for pedestrian safety

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 73 of 92

Streets affected: Cannes Avenue between Gold Coast Highway and Genoa Street; Genoa Street between Gold Coast Highway and Cannes Avenue (verge/footpath, partial lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 73 of 92

Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace North and Gold Coast Highway

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement of construction related vehicles

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 66 of 96

Streets affected: Frigo Court (metered parking / loading zone) between Karp Court and Crombie Avenue

 

Show more

Start date: 28 March 2019

End date: 1 July 2019

Duration: Midnight  11.59pm

Reason: Storage of building equipment (3 parking bays to be fenced off with temporary fencing)

north

Road closures

Planned - Temporary Road Closure - Miami

Day 62 of 91

Streets affected: Nobby Parade (full road closure local traffic access only) between Albion Avenue and Nundah Avenue

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert crossing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 62 of 91

Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site

north

Road closures

Planned - Temporary Road Closure - Miami

Day 62 of 91

Streets affected: Gold Coast Highway outside Miami High School (verge / footpath closure with hold and release for 2 minutes maximum) between Chairlift Avenue and Santa Monica Road

 

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am 3:30pm

Reason: Construction of a car park within Miami High School

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 59 of 92

Streets affected: Old Burleigh Road (half road, lane closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street

 

Show more

Start date: 4 April 2019

End date: 4 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate movement of construction vehicles

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 58 of 62

Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Date 1: 5 April 2019 to 18 April 2019

Date 2: 29 April 2019 to 5 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 55 of 61

Streets affected: Captain Cook Drive (lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Kendor Street and Demand Avenue

Show more

Start date: 8 April 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm (shoulder, verge/footpath closure)

Duration 2: 9am - 2:30pm (half road with hold and release)

Duration 3: 12am - 11:59pm (lane, verge/footpath closure with contraflow)

Reason: Works associated with a development including: bulk earthworks, civil works, roadworks and landscaping

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 55 of 91

Streets affected: Rutledge Street (parking bays closure) between Musgrave Street and Cul de sac

Show more

Start date: 8 April 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 51 of 62

Streets affected: Foxwell Road (partial verge/footpath closure with hold and release intermittent for 2 minutes maximum) between Oakey Creek Road and Shipper Drive

Show more

Start date: 12 April 2019

End date: 12 June 2019

Duration 1: 9am – 6:30pm (Hold and Release for Westbound Carriageway only)

Duration 2: 6:30am - 6:30pm (Partial Verge/Footpath closure)

Reason: Construction of Coomera State High School

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 49 of 92

Streets affected: Jefferson Lane (verge/footpath closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 14 April 2019

End date: 14 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 49 of 59

Streets affected: Arcadia Drive (half road closure with hold and release for 2 minutes maximum) between Himalaya Street and Canberra Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 49 of 76

Streets affected: Mervyn Thomas Drive (shoulder, verge/footpath closure) between Broadwater Avenue and Halcyon Way

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 49 of 76

Streets affected: Pendraat Parade (shoulder, verge/footpath closure) between Sickle Avenue and Pendraat Parade cul de sac

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 49 of 59

Streets affected: Jabiru Avenue (half road closure with hold and release for 2 minutes maximum) between Avocet Avenue and Fantail Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for stormwater relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 49 of 76

Streets affected: Halcyon Way (shoulder, verge/footpath, parking lane/bay closure) between Mervyn Thomas Drive and Crescent Avenue

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 49 of 59

Streets affected: Kalimna Drive (half road closure with hold and release for 2 minutes maximum) between Moana Park Avenue and End of road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 49 of 59

Streets affected: Allambi Avenue (half road closure with hold and release for 2 minutes maximum) between Naranga Avenue and Ilkinia Avenue

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 49 of 76

Streets affected: Marina Quays Boulevarde (shoulder, verge/footpath, parking lane/bay closure) between Sickle Avenue and Waters Close

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 49 of 59

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Kikori Crescent and Howard Street

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 49 of 59

Streets affected: Savoy Drive (half road closure with hold and release for 2 minutes maximum) between Allambi Avenue and Boongala Road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 48 of 92

Streets affected: Pearson Road (verge/footpath closure) between Kiralea Court and Darlington Drive

Show more

Start date: 15 April 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate implementation of heavy vehicle warning signs for construction site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 46 of 91

Streets affected: Elizabeth Avenue (verge/footpath closure) between Surf Parade and Old Burleigh Road

Show more

Start date: 17 April 2019

End date: 16 July 2019

Duration: 12am – 11:59pm

Reason: For the placement of an overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 45 of 62

Streets affected: Jefferson Lane (half road closure with hold and release for 2 minutes maximum) between Third Avenue and Laceys Lane

Show more

Start date: 18 April 2019

End date: 18 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 43 of 92

Streets affected: Surfers Paradise Boulevard (occasional hold and release for 2 minutes maximum of traffic and pedestrians) between Staghorn Avenue and Palm Avenue

 

Show more

Start date: 20 April 2019

End date: 20 July 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction vehicles to safely reverse from site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 40 of 91

Streets affected: Elizabeth Avenue (parking bay closure) between Old Burleigh Road and Surf Parade

Show more

Start date: 23 April 2019

End date: 22 July 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 39 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 24 April 2019

End date: 24 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

Day 39 of 53

Streets affected: Markeri Street between Caulfield Street and Greenwich Court and Greenwich Court between Markeri Street and cul-de-sac (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum)

 

 

Show more

Start date: 24 April 2019

End date: 15 June 2019

Duration: 9:00am 14:00pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Highland Park

Day 37 of 81

Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a boulder retaining wall

north

Road closures

Planned - Temporary Road Closure - Lower Beechmont

Day 37 of 81

Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a timber retaining wall

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 34 of 43

Streets affected: Cavill Avenue (partial footpath) between Orchid Avenue and The Esplanade

 

Show more

Start date: 29 April 2019

End date:  10 June 2019

Duration: Continuous

Reason: Installation of scaffolding to complete external works associated with the redevelopment of the Surfers Paradise Beer Garden

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 33 of 92

Streets affected: Gold Coast Highway (verge closure) between Thrower Drive and Hawaii Avenue

Show more

Start date: 30 April 2019

End date: 30 July 2019

Duration: 12am – 11:59pm

Reason: Occupation of verge for construction activities ensuring the footpath remains open at all times

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 32 of 84

Streets affected: Kerkin Road North (full road closure with detour and hold and release for 2 minutes maximum) between Yawalpah Road and Gainsborough Drive

 

Show more

Start date: 1 May 2019

End date: 23 July 2019

Duration: Midnight  11:59pm

Reason: Construction of a new roundabout and road widening

north

Road closures

Planned - Temporary Road Closure - Jacobs Well

Day 32 of 61

Streets affected: Helmore Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Harbour Boulevard and Garagul Street

 

Show more

Start date: 1 May 2019

End date: 30 June 2019

Duration: 6:30am 6:00pm

Reason: Road widening, pavement surfacing and line marking

north

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 31 of 58

Streets affected: Boundary Street (half road closure with hold and release for 2 minutes maximum) between Hayter Street and Jewel Street

 

Show more

Start date: 1 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm (traffic controllers onsite) and 5.00pm - 7.00am (portable traffic signals onsite)

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 31 of 124

Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street

 

Show more

Start date: 2 May 2019

End date: 2 September 2019

Duration: Midnight 11.59pm

Reason: Associated construction activity for Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 31 of 58

Streets affected: Karloo Street between Mawarra Street and Burra Street (half road closure with hold and release for 2 minutes maximum) and Mawarra Street between Stanhill Drive and Thomas Drive (partial lane, parking bays, verge/footpath)

 

Show more

Start date: 2 May 2019

End date: 28 June 2019

Duration: Midnight 11.59pm

Reason: Street scaping project to the Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 30 of 59

Streets affected: Pacific Parade (verge/footpath closure) between Johnston Street and Archer Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: Continuous

Reason: Footpath closure for occupation of site office and construction materials

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 30 of 59

Streets affected: Pacific Parade (half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 28 of 62

Streets affected: Albatross Avenue (bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Seashell Avenue and Heron Avenue

 

Show more

Start date: 5 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Daily closures to facilitate deliveries to site

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 26 of 32

Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade

 

Show more

Start date: 7 May 2019

End date: 7 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 26 of 61

Streets affected: Markeri Street, Australia Avenue, Queensland Avenue, Gold Coast Highway, Jubilee Avenue (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 7 May 2019

End date: 6 July 2019

Duration: 6:30am 6:30pm

Reason: NBN / telecommunication installation

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 25 of 41

Streets affected: Old Coach Road (lane, bike lane, shoulder closure) between Low Drive and Marsh Street

Show more

Start date: 7 May 2019

End date: 17 June 2019

Duration: 7pm – 5am

Reason: Undertake Falling Weight Deflectometer (FWD) and Ground Penetration Radar (GPR) Testing under rolling traffic control conditions

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 25 of 93

Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate site sheds and material storage for development site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 25 of 31

Streets affected: Fourth Avenue (full road closure local traffic access only) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone in designated parking bays

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 25 of 31

Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 25 of 31

Streets affected: Eady Avenue (partial lane, verge/footpath closure) between T E Peters Drive and No Through Road

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate trenching works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 25 of 93

Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Construction Works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 25 of 93

Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 25 of 93

Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Detour for one way of traffic to facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 24 of 32

Streets affected: Marina Quays Boulevard (shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Crescent Avenue and Mervyn Thomas Drive

 

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am 6:00pm

Reason: Sewer main works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 24 of 92

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate vehicle movement in and out of construction site

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 24 of 32

Streets affected: Peninsular Drive (verge/footpath closure) between Holborow Close and Watson Esplanade

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am – 6pm

Reason: Facilitate relocation of overhead power cables beneath the ground

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 24 of 92

Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street

Show more

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate material and equipment deliveries plus various construction activities

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 23 of 62

Streets affected: Baker Avenue (verge/footpath closure) between Frank Street and Proud Street

Show more

Start date: 10 May 2019

End date: 10 July 2019

Duration: 12am – 11:59pm

Reason: To facilitate new development site

north

Road closures

Planned - Temporary Road Closure - Robina

Day 22 of 31

Streets affected: Scottsdale Drive between Christine Avenue and Laurel Oak Drive; Laurel Oak Drive between Scottsdale Drive and Mountain Ash Circuit (parking lane/bay closure with hold and release for 2 minutes maximum)

Show more

Start date: 11 May 2019

End date: 10 June 2019

Duration: 6:30am – 6:30pm

Reason: To assist large construction vehicles in and out of development site

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 20 of 60

Streets affected: Gold Coast Highway (loading zone closure) between Connor Street and West Street

Show more

Start date: 13 May 2019

End date: 11 July 2019

Duration: 6:30am – 6:30pm

Reason: The Loading Zone will be used by pedestrians to bypass a footpath closure

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 20 of 66

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) between Nineteenth Avenue and Fifteenth Avenue

Start date: 13 May 2019

End date: 17 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries of building materials / scaffolding to the construction site

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 18 of 32

Streets affected: Old Pacific Highway (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Fig Tree Court and Leo Graham Way

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 9:00am 2:30pm

Reason: Closure to facilitate water main crossing requiring trenching

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 17 of 31

Streets affected: Birmingham Road (lane, bike lane and verge/footpath closure) between Emanual College Drive and Nielsens Road

 

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Pavement investigation services

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 17 of 93

Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road

 

 

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: Midnight 11:59pm

Reason: Continuous footpath closure to facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 17 of 93

Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: 6:30am – 6:30pm

Reason: Full road closure at end of road to facilitate construction activities when required for safety

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 16 of 61

Streets affected: Helensvale Road (verge/footpath, partial lane closure) between Hannaford Place and Siganto Drive

Show more

Also affected: Woodside Place, Grey Gum Street, Shepparton Road, Michigan Drive, Parkside Drive, John Dalley Drive

Start date: 17 May 2019

End date: 16 July 2019

Duration: 6:30am – 6:30pm

Reason: NBN Works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 16 of 32

Streets affected: Stanmore Road (lane, bike lane verge/footpath closure with hold and release for 2 minutes maximum) between Paterson Road and Quarry Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 16 of 32

Streets affected: Enkleman Street (lane, bike lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanmore Road and Taperoo Court

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 16 of 32

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 9:00am 2:30pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 15 of 31

Streets affected: Fourth Avenue (verge/footpath closure) between Third Avenue and Fifth Avenue

 

 

Show more

Start date: 18 May 2019

End date: 17 June 2019

Duration: Midnight 11.59pm

Reason: To facilitate a safe work place for the construction site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 13 of 14

Streets affected: Tallebudgera Drive (full road closure with detours) between Townson Avenue and Gold Coast Highway

Show more

Start date: 19 May 2019

End date: 2 June 2019

Duration: 6pm – 6am

Reason: Road pavement profiled and overlayed with asphalt

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 13 of 15

Streets affected: Sovereigh Drive (half road closure with hold and release for 2 minutes maximum) between Apollo Avenue and Dame Pattie Avenue (north)

 

Show more

Start date: 20 May 2019

End date: 3 June 2019

Duration: 6:30am 6:30pm

Reason: Pavement profile and resealing works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 13 of 20

Streets affected: Alec Avenue between Peter Parade and Hillcrest Parade; Kiers Road between Karbunya Street and Kallay Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 20 May 2019

End date: 8 June 2019

Duration: 6:30am – 5:30pm

Reason: Kerb and channelling on all four corners of Alec Avenue and Kiers Road intersection

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 13 of 13

Streets affected: Hargraves Road (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Reindeer Street and Bambi Close

Show more

Also affected: Roe Street, Fallow Street, Fawn Street, Saint Stephens Drive

Start date: 20 May 2019

End date: 1 June 2019

Duration: 6:30am – 3:30pm

Reason: Placement of pram ramps and island ramp through traffic island

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 13 of 40

Streets affected: Railway Parade (lane, bike lane, shoulder, verge/footpath, with hold and release for 2 minutes maximum) between Nerang-Broadbeach Road and Grenfell Street

Show more

Start date: 20 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm

Reason: Water main replacement program

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 12 of 18

Streets affected: Sandy Creek Road (half road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Start date: 20 May 2019

End date: 7 June 2019

Duration: 6:30pm 6:00am

Reason: Road profiling and asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 12 of 31

Streets affected: Quarry Road (rolling blockade) between Rossmanns Road and Stapylton Jacobs Well Road

 

Show more

Start date: 20 May 2019

End date: 20 June 2019

Duration: 7:00pm 5:00am

Reason: To facilitate falling weight deflectometer and ground penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 12 of 14

Streets affected: Reserve Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Highland Way and Lakes End Court

Show more

Start date: 20 May 2019

End date: 3 June 2019

Duration: 7:00pm 5:00am

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 12 of 46

Streets affected: Bondi Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and end of road

 

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 12 of 46

Streets affected: Bondi Avenue (parking lane/bays closure) between Gold Coast Highway and End of road

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 12 of 92

Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway

Show more

Start date: 21 May 2019

End date: 20 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Miami

Day 12 of 32

Streets affected: Avalon Parade (parking lane closure) between Pacific Avenue and Paradise Avenue

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate sewer connection to existing manhole

south

Road closures

Planned - Temporary Road Closure - Tugan

Day 12 of 32

Streets affected: Singh Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Wyberba Street and end of street

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: Connect communications to existing pole

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 12 of 15

Streets affected: Upper Ormeau Road (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Thompson Road and Landsdowne Drive

 

Show more

Start date: 21 May 2019

End date: 4 June 2019

Duration: 6:30am 6:30pm (half road closure with hold and release)

Duration:  Midnight - 11:59pm (verge/footpath closure)

Reason: Driveway construction works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 10 of 28

Streets affected: Mattocks Road (rolling lane closure) between Treeview Drive North and Bushtree Court

 

Show more

Start date: 22 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: Undertake falling weight deflectometer and ground penetration radar testing

south

Road closures

Planned - Temporary Road Closure - Miami

Day 10 of 11

Streets affected: Gold Coast Highway (verge/footpath closure) between Pacific Avenue and Paradise Avenue

 

Show more

Start date: 23 May 2019

End date: 2 June 2019

Duration: 9:30am 2:30pm (Monday to Friday)

Duration:  6:30am - 6.30pm (Saturday to Sunday)

Reason: Construction of a driveway at Miami High School

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 10 of 16

Streets affected: Shipper Drive (shoulder, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Ford Road and End of road

Show more

Start date: 23 May 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm - Shoulder and verge/footpath closure

Duration 2: 9am - 2:30pm - Half road closure with hold and release

Reason: Installation of temporary dredge delivery pipe

north

Road closures

Planned - Temporary Road Closure - Molendinar

Day 9 of 17

Streets affected: Olsen Avenue (shoulder, verge/footpath closure) between Crestwood Drive and Smith Street

 

Show more

Start date: 23 May 2019

End date: 9June 2019

Duration: 800pm 5:00am

Reason: Removal and replacement of crossover

north

Road closures

Planned - Temporary Road Closures - Yatala

Day 8 of 10

Streets affected: Pearson Road (full road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Date: 24 May 2019 to 27 May 2019

Also affected: Computer Road (full road closure with hold and release for 2 minutes maximum) between Byte Street and Pearson Road

Date: 31 May 2019 to 3 June 2019

Duration: 6pm – 5am

Reason: Construction of 3 service crossings at intersection for new development

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 8 of 26

Streets affected: Christine Avenue (Rolling lane closure) between Bridgewater Drive and Varsity College car park

 

Show more

Start date: 24 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: To undertake falling weight deflectometer and ground testing penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 30

Streets affected: Cavill Avenue (partial lane closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevarde and Ferny Avenue

Show more

Start date: 24 May 2019

End date: 23 June 2019

Duration: 8pm – 5am

Reason: Falling weight deflectometer and ground penetrating radar investigations

north

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 8 of 32

Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive

Show more

Start date: 25 May 2019

End date: 25 June 2019

Duration: 6:30am – 6:30pm

Reason: Large deliveries, concrete pours, trucks and construction vehicles entering and exiting the site

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 6 of 12

Streets affected: Somerset Drive (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Jarema Drive and Bonogin Road

Show more

Also affected: Somerset Drive between Gemvale Road and Swanton Drive; Gemvale Road between Jarema Drive and Alvey Court

Start date: 26 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Merrimac

Day 6 of 7

Streets affected: Boowaggan Road (half road closure with hold and release for 2 minutes maximum) between Gooding Drive and Robina Parkway

Show more

Start date: 26 May 2019

End date: 2 June 2019

Duration: 8pm – 5am

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closures - Surfers Paradise

Day 6 of 93

Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 27 May 2019

End date: 27 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate road works, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Pacific Pines

Day 6 of 15

Streets affected: Midway Terrace (half road closure with hold and release for 2 minutes maximum) between Hillary Circuit and Santa Isobel Boulevard

 

 

 

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 6:30am 6:30pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 6 of 32

Streets affected: Cassia Street between Bayview Street and Joseph Street; Joseph Street between Poinsettia Avenue and Howard Street (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works, including inspections, cleaning and reline installations

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 6 of 33

Streets affected: Finnegan Way (verge/footpath, parking lane/bay closure) between Ritz Drive and Chromata Lane

Show more

Start date: 27 May 2019

End date: 28 June 2019

Duration: 7am – 2pm

Reason: Installation of a weathproof shelter over the footpath between the Coomera Rivers State School boundary and the 'Stop Drop and Go' parking/drop off lane

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 6 of 15

Streets affected: White Street (lane, partial lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Price Street and Nerang Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 15

Streets affected: Brighton Parade (bike lane, half road closure with hold and release for 2 minutes maximum) between Como Crescent and Como Crescent

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 6 of 12

Streets affected: Surf Parade (verge/footpath closure with hold and release for 2 minutes maximum) between Victoria Avenue and Queensland Avenue

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7am – 5pm

Reason: Removing coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 6 of 13

Streets affected: Jefferson Lane (full road closure with local access for residents with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Dates: 27 - 31 May 2019; 3 - 8 June 2019

Duration: 7am – 5pm

Reason: Concrete pours for paths, stairs and crossovers including landscaping supplies

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 6 of 32

Streets affected: Marina Quays Boulevarde (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Waters Close and Crescent Avenue

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 7am – 5pm

Reason: Gas main extension

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 6 of 17

Streets affected: Reserve Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Rose Valley Drive and Greenleaf Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9am – 2:30pm

Reason: Modify existing guardrail

north

Road closures

Planned - Temporary Road Closure - Robina

Day 6 of 17

Streets affected: Cottesloe Drive (parking lane closure) between Grenaside Court and Pyrmont Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9:30am – 3pm

Reason: Removal of two existing guardrails

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 5 of 11

Streets affected: Highland Way (bike lane, half road closure with hold and release for 2 minutes maximum) between Skyridge Drive and Rose Valley Drive

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 5 of 14

Streets affected: Griffith Street (half road closure with hold and release for 2 minutes maximum) between Warner Street and Dixon Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 11:59pm (Sun - Thu only) – 5am (Mon - Fri only)

Reason: Replacement of street light on a centre traffic island

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 5 of 15

Streets affected: Banyula Drive between Evers Street and Coolibah Road; Matilda Road between End of road and Banyula Drive (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 28 May 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: To repair and replace broken guardrail

north

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 8

Streets affected: Bay Street (half road closure with hold and release for 2 minutes maximum) between High Street and Rawlins Street

Show more

Start date: 28 May 2019

End date: 4 June 2019

Duration: 6:30am – 6:30pm

Reason: Placement of crane to facilitate pre-cast concrete installation

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 5 of 32

Streets affected: Sunshine Boulevarde (lane, verge/footpath closure) between Surfers Avenue and Gretel Drive

Show more

Start date: 28 May 2019

End date: 28 June 2019

Duration: 9am – 1pm

Reason: To facilitate safe ingress and egress of construction vehicles

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 4 of 64

Streets affected: Markeri Street (lane closure) between Sunshine Boulevarde and Avanti Street

Show more

Start date: 29 May 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 4 of 32

Streets affected: Bienvenue Drive (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Clives Circuit and Itong Place

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 6:30am – 1pm

Reason: Excavate and remove existing water meter; install new meter and concrete lid

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 4 of 32

Streets affected: Peachey Road (lane, shoulder, verge/footpath closure with hold and release for 2 minutes maximum) between Caswell Court and Oppermann Drive

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 7am – 7pm

Reason: Installation of drainage line from flow meter to gully

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 4 of 73

Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road

Show more

Start date: 29 May 2019

End date: 9 August 2019

Duration: 7am – 5pm

Reason: New recycled water investigation - potholing stage

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 3 of 13

Streets affected: Gilston Road (lane closure) between Winderadeen Court and New Street

Show more

Start date: 29 May 2019

End date: 11 Jun 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 9

Streets affected: Queen Street between Mal Burke Street and Ward Street; Mal Burke Street between Queen Street and Pohlman Street (full road closure with detour)

Show more

Start date: 29 May 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: To facilitate sewer connection under road way for new development

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 2 of 10

Streets affected: Philippine Parade (lane, verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 31 May 2019

End date: 9 June 2019

Duration: 12am – 11:59pm

Reason: Building a manhole for sewer connection

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 2 of 57

Streets affected: Eggersdorf Road (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Arthur Way and Stewart's Road

Show more

Start date: 31 May 2019

End date: 26 July 2019

Duration: 12am – 11:59pm

Reason: Road duplication/upgrading of Eggersdorf Road - Phase 3

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 2 of 32

Streets affected: Nelson Avenue (shoulder, verge/footpath closure) between Pool Street and Sheehan Drive

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 2 of 32

Streets affected: Oxley Drive (shoulder, verge/footpath closure) between Crescent Avenue and Sunbird Place

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 2 of 15

Streets affected: McLaren Road (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Castagno Avenue and Fillmore Street

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration 1: 9:30am – 2:30pm (Mon - Fri)

Duration 2: 6:30am - 6:30pm (Saturdays)

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 2 of 15

Streets affected: Reserve Road between Lawson Drive and Coldcrest Drive; Old Coach Road between Reserve Road and Baileys Mountain Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9am – 2:30pm

Reason: Install coloured surfacing at roundabout and approaches

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 2

Streets affected: The Esplanade (full road closure) between Elkhorn Avenue (Soul Roundabout) and Hanlan Street

Show more

Start date: 31 May 2019

End date: 1 June 2019

Duration: 4pm – 10pm

Reason: Seafire 2019 EVENT

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 1 of 14

Streets affected: Benowa Road between St Kevins Avenue and Allchurch Street; Mediterranean Drive between Mary Ann Street and Benowa Road (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9pm – 6am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 1 of 61

Streets affected: Salzburg Road (full road closure with detours) between Barry Street and Yawalpah Road

Show more

Also affected: Yawalpah Road (verge/footpath closure with hold and release for 2 minutes maximum) between Attenborough Boulevarde and Old Pacific Motorway

Start date: 1 June 2019

End date: 31 July 2019

Duration 1: 12am – 11:59pm

Duration 2: 9am - 2:30pm (Yawalpah Road)

Reason: Stage 2 (1 June - 12 July 2019)   and   Stage 3 (13 July - 31 July 2019) works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 1 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 1 of 8

Streets affected: Bayview Street (bike lane, shoulder closure with hold and release for 2 minutes maximum) between Simbai Street and Lae Drive

Show more

Start date: 1 June 2019

End date: 8 June 2019

Duration 1: 6:30am – 6:30pm (Saturdays)

Duration 2: 9:30am - 2:30pm 

Reason: To facilitate overhead works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 1 of 92

Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street

Show more

Start date: 1 June 2019

End date: 31 August 2019

Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Bonogin

Day 1 of 30

Streets affected: Bonogin Road (verge/footpath, half road, parking lane/bay, bike lane, shoulder closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Canopy Drive

Show more

Also affected: Hardys Road (slip lane, shoulder closure) between Bonogin Road and Glenmore Drive

Also affected: Carrington Road (verge/footpath, shoulder closure) between Bonogin Road and Tahilia Court

Start date: 1 June 2019

End date: 30 June 2019

Duration: 7am – 5pm

Reason: Water main renewal works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 6

Streets affected: Ferny Avenue (lane, partial lane, shoulder, metered parking/loading zone, full road closure with hold and release for 2 minutes maximum) between Beach Road and Gold Coast Highway

Show more

Start date: 1 June 2019

End date: 6 June 2019

Duration: 6pm – 6am

Reason: Road rehabilitation mill and fill

north

 
2 Jun - Sunday
Water and sewerage

Unplanned - Water Interruption - Coolangatta

Day 2 of 2

Streets affected : Musgrave St , Garrick St  , Rutledge St

Cause : Repair water main

W/O : 20515295

Notif : 1000576955

Show more

Start time and date: 4.30pm, 1 June  2019

End time and date: 7.00am, 2 June  2019

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 202 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 186 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 140 of 200

Streets affected: Old Coach Road between Phaeton Street and Days Road; Days Road between Coomera Grand Drive and Old Coach Road (verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 12am – 11:59pm

Reason: Intersection Upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 140 of 200

Streets affected: Old Coach Road between Days Road and Coomera Grand Drive; also between Phaeton Street and Days Road (partial lane, bike lane and verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 122 of 150

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure)

Show more

Start date: 1 February 2019

End date: 30 June 2019

Duration: 6:30am – 2:30pm

Reason: Lane closure on approach to and including roundabout

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 121 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 108 of 136

Streets affected: Marine Parade (parking lane/bay closure with hold and release for 2 minutes maximum) between Ocean Street and Taylor Street

Show more

Start date: 15 February 2019

End date: 30 June 2019

Duration 1: 6:30am – 6pm (Hold and Release)

Duration 2: 12am - 11:59pm (car park)

Reason: To support the turning and entering of extra long vehicles into Quota Park for works activities

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 96 of 99

Streets affected: River Terrace (verge/footpath, full road closure with local access only) between Enderley Avenue and End of road

Show more

Start date: 27 February 2019

End date: 5 June 2019

Duration: 12am – 11:59pm

Reason: Construction of emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 94 of 120

Streets affected: Marine Parade (half road, partial verge/footpath closure with hold and release for 2 minutes maximum) between Burrows Street and Taylor Street

Show more

Start date: 1 March 2019

End date: 28 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate delivery vehicles and concrete pours

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 91 of 93

Streets affected: Old Burleigh Road (verge/footpath closure) between Fern Street and Wharf Road

Show more

Start date: 4 March 2019

End date: 4 June 2019

Duration: 12am – 11:59pm

Reason: For the placement of site sheds

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 91 of 93

Streets affected: Wharf Road (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 4 March 2019

End date: 4 June 2019

Duration: 6:30am – 10pm

Reason: To facilitate roadworks, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 89 of 93

Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street

Show more

Start date: 6 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries and ingress and egress of vehicles; also to facilitate large concrete pours

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 88 of 92

Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 7 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 88 of 123

Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 March 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 86 of 92

Streets affected: Gold Coast Highway (footpath closure) between Connor Street and West Street

Show more

Start date: 9 March 2019

End date: 8 June 2019

Duration: 12am – 11:59pm

Reason: Occupation of footpath for location of overhead gantry

south

Road closures

Planned - Temporary Road Closure - Southport

Day 84 of 93

Streets affected: 216 Queen Street (verge/footpath closure with hold and release for 2 minutes maximum) between Mal Burke Street and Ward Street

Show more

Start date: 11 March 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: Construction activities for the demolition of an existing dwelling plus the site establishment for building a new 4 storey unit development

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 80 of 108

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure on approach to and including roundabout)

Show more

Start date: 15 March 2019

End date: 30 June 2019

Duration: 6:30am – 5:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Robina

Day 78 of 175

CBUS Super Stadium - Events - NRL Season

Show more

Cheltenham Drive (Westbound) - CLOSED - local access only.

Robina Station Road - CLOSED - buses only.

Stadium Drive - CLOSED - pedestrians only.

Game Dates:

17 March 2019   /   12 April 2019   /   21 April 2019   /   18 May 2019   /   14 June 2019

29 June 2019   /   21 July 2019   /   27 July 2019   /   16 August 2019   /   7 September 2019

Duration: 7am – 11:30pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 76 of 93

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 19 March 2019

End date: 19 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 74 of 92

Streets affected: Twenty Forth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N

 

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: Midnight 11:59pm

Reason: Continuous partial verge/footpath closure for pedestrian safety

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 74 of 92

Streets affected: Cannes Avenue between Gold Coast Highway and Genoa Street; Genoa Street between Gold Coast Highway and Cannes Avenue (verge/footpath, partial lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 74 of 92

Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace North and Gold Coast Highway

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement of construction related vehicles

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 67 of 96

Streets affected: Frigo Court (metered parking / loading zone) between Karp Court and Crombie Avenue

 

Show more

Start date: 28 March 2019

End date: 1 July 2019

Duration: Midnight  11.59pm

Reason: Storage of building equipment (3 parking bays to be fenced off with temporary fencing)

north

Road closures

Planned - Temporary Road Closure - Miami

Day 63 of 91

Streets affected: Nobby Parade (full road closure local traffic access only) between Albion Avenue and Nundah Avenue

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert crossing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 63 of 91

Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site

north

Road closures

Planned - Temporary Road Closure - Miami

Day 63 of 91

Streets affected: Gold Coast Highway outside Miami High School (verge / footpath closure with hold and release for 2 minutes maximum) between Chairlift Avenue and Santa Monica Road

 

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am 3:30pm

Reason: Construction of a car park within Miami High School

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 60 of 92

Streets affected: Old Burleigh Road (half road, lane closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street

 

Show more

Start date: 4 April 2019

End date: 4 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate movement of construction vehicles

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 59 of 62

Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Date 1: 5 April 2019 to 18 April 2019

Date 2: 29 April 2019 to 5 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 56 of 61

Streets affected: Captain Cook Drive (lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Kendor Street and Demand Avenue

Show more

Start date: 8 April 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm (shoulder, verge/footpath closure)

Duration 2: 9am - 2:30pm (half road with hold and release)

Duration 3: 12am - 11:59pm (lane, verge/footpath closure with contraflow)

Reason: Works associated with a development including: bulk earthworks, civil works, roadworks and landscaping

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 56 of 91

Streets affected: Rutledge Street (parking bays closure) between Musgrave Street and Cul de sac

Show more

Start date: 8 April 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 52 of 62

Streets affected: Foxwell Road (partial verge/footpath closure with hold and release intermittent for 2 minutes maximum) between Oakey Creek Road and Shipper Drive

Show more

Start date: 12 April 2019

End date: 12 June 2019

Duration 1: 9am – 6:30pm (Hold and Release for Westbound Carriageway only)

Duration 2: 6:30am - 6:30pm (Partial Verge/Footpath closure)

Reason: Construction of Coomera State High School

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 50 of 92

Streets affected: Jefferson Lane (verge/footpath closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 14 April 2019

End date: 14 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 50 of 59

Streets affected: Arcadia Drive (half road closure with hold and release for 2 minutes maximum) between Himalaya Street and Canberra Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 50 of 76

Streets affected: Mervyn Thomas Drive (shoulder, verge/footpath closure) between Broadwater Avenue and Halcyon Way

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 50 of 76

Streets affected: Pendraat Parade (shoulder, verge/footpath closure) between Sickle Avenue and Pendraat Parade cul de sac

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 50 of 59

Streets affected: Jabiru Avenue (half road closure with hold and release for 2 minutes maximum) between Avocet Avenue and Fantail Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for stormwater relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 50 of 76

Streets affected: Halcyon Way (shoulder, verge/footpath, parking lane/bay closure) between Mervyn Thomas Drive and Crescent Avenue

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 50 of 59

Streets affected: Kalimna Drive (half road closure with hold and release for 2 minutes maximum) between Moana Park Avenue and End of road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 50 of 59

Streets affected: Allambi Avenue (half road closure with hold and release for 2 minutes maximum) between Naranga Avenue and Ilkinia Avenue

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 50 of 76

Streets affected: Marina Quays Boulevarde (shoulder, verge/footpath, parking lane/bay closure) between Sickle Avenue and Waters Close

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 50 of 59

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Kikori Crescent and Howard Street

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 50 of 59

Streets affected: Savoy Drive (half road closure with hold and release for 2 minutes maximum) between Allambi Avenue and Boongala Road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 49 of 92

Streets affected: Pearson Road (verge/footpath closure) between Kiralea Court and Darlington Drive

Show more

Start date: 15 April 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate implementation of heavy vehicle warning signs for construction site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 47 of 91

Streets affected: Elizabeth Avenue (verge/footpath closure) between Surf Parade and Old Burleigh Road

Show more

Start date: 17 April 2019

End date: 16 July 2019

Duration: 12am – 11:59pm

Reason: For the placement of an overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 46 of 62

Streets affected: Jefferson Lane (half road closure with hold and release for 2 minutes maximum) between Third Avenue and Laceys Lane

Show more

Start date: 18 April 2019

End date: 18 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 44 of 92

Streets affected: Surfers Paradise Boulevard (occasional hold and release for 2 minutes maximum of traffic and pedestrians) between Staghorn Avenue and Palm Avenue

 

Show more

Start date: 20 April 2019

End date: 20 July 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction vehicles to safely reverse from site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 41 of 91

Streets affected: Elizabeth Avenue (parking bay closure) between Old Burleigh Road and Surf Parade

Show more

Start date: 23 April 2019

End date: 22 July 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 40 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 24 April 2019

End date: 24 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

Day 40 of 53

Streets affected: Markeri Street between Caulfield Street and Greenwich Court and Greenwich Court between Markeri Street and cul-de-sac (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum)

 

 

Show more

Start date: 24 April 2019

End date: 15 June 2019

Duration: 9:00am 14:00pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Highland Park

Day 38 of 81

Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a boulder retaining wall

north

Road closures

Planned - Temporary Road Closure - Lower Beechmont

Day 38 of 81

Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a timber retaining wall

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 35 of 43

Streets affected: Cavill Avenue (partial footpath) between Orchid Avenue and The Esplanade

 

Show more

Start date: 29 April 2019

End date:  10 June 2019

Duration: Continuous

Reason: Installation of scaffolding to complete external works associated with the redevelopment of the Surfers Paradise Beer Garden

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 34 of 92

Streets affected: Gold Coast Highway (verge closure) between Thrower Drive and Hawaii Avenue

Show more

Start date: 30 April 2019

End date: 30 July 2019

Duration: 12am – 11:59pm

Reason: Occupation of verge for construction activities ensuring the footpath remains open at all times

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 33 of 84

Streets affected: Kerkin Road North (full road closure with detour and hold and release for 2 minutes maximum) between Yawalpah Road and Gainsborough Drive

 

Show more

Start date: 1 May 2019

End date: 23 July 2019

Duration: Midnight  11:59pm

Reason: Construction of a new roundabout and road widening

north

Road closures

Planned - Temporary Road Closure - Jacobs Well

Day 33 of 61

Streets affected: Helmore Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Harbour Boulevard and Garagul Street

 

Show more

Start date: 1 May 2019

End date: 30 June 2019

Duration: 6:30am 6:00pm

Reason: Road widening, pavement surfacing and line marking

north

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 32 of 58

Streets affected: Boundary Street (half road closure with hold and release for 2 minutes maximum) between Hayter Street and Jewel Street

 

Show more

Start date: 1 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm (traffic controllers onsite) and 5.00pm - 7.00am (portable traffic signals onsite)

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 32 of 124

Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street

 

Show more

Start date: 2 May 2019

End date: 2 September 2019

Duration: Midnight 11.59pm

Reason: Associated construction activity for Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 32 of 58

Streets affected: Karloo Street between Mawarra Street and Burra Street (half road closure with hold and release for 2 minutes maximum) and Mawarra Street between Stanhill Drive and Thomas Drive (partial lane, parking bays, verge/footpath)

 

Show more

Start date: 2 May 2019

End date: 28 June 2019

Duration: Midnight 11.59pm

Reason: Street scaping project to the Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 31 of 59

Streets affected: Pacific Parade (verge/footpath closure) between Johnston Street and Archer Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: Continuous

Reason: Footpath closure for occupation of site office and construction materials

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 31 of 59

Streets affected: Pacific Parade (half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 29 of 62

Streets affected: Albatross Avenue (bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Seashell Avenue and Heron Avenue

 

Show more

Start date: 5 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Daily closures to facilitate deliveries to site

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 27 of 32

Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade

 

Show more

Start date: 7 May 2019

End date: 7 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 27 of 61

Streets affected: Markeri Street, Australia Avenue, Queensland Avenue, Gold Coast Highway, Jubilee Avenue (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 7 May 2019

End date: 6 July 2019

Duration: 6:30am 6:30pm

Reason: NBN / telecommunication installation

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 26 of 41

Streets affected: Old Coach Road (lane, bike lane, shoulder closure) between Low Drive and Marsh Street

Show more

Start date: 7 May 2019

End date: 17 June 2019

Duration: 7pm – 5am

Reason: Undertake Falling Weight Deflectometer (FWD) and Ground Penetration Radar (GPR) Testing under rolling traffic control conditions

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 26 of 93

Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate site sheds and material storage for development site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 26 of 31

Streets affected: Fourth Avenue (full road closure local traffic access only) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone in designated parking bays

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 26 of 31

Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 26 of 31

Streets affected: Eady Avenue (partial lane, verge/footpath closure) between T E Peters Drive and No Through Road

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate trenching works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 26 of 93

Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Construction Works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 26 of 93

Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 26 of 93

Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Detour for one way of traffic to facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 25 of 32

Streets affected: Marina Quays Boulevard (shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Crescent Avenue and Mervyn Thomas Drive

 

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am 6:00pm

Reason: Sewer main works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 25 of 92

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate vehicle movement in and out of construction site

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 25 of 32

Streets affected: Peninsular Drive (verge/footpath closure) between Holborow Close and Watson Esplanade

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am – 6pm

Reason: Facilitate relocation of overhead power cables beneath the ground

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 25 of 92

Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street

Show more

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate material and equipment deliveries plus various construction activities

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 24 of 62

Streets affected: Baker Avenue (verge/footpath closure) between Frank Street and Proud Street

Show more

Start date: 10 May 2019

End date: 10 July 2019

Duration: 12am – 11:59pm

Reason: To facilitate new development site

north

Road closures

Planned - Temporary Road Closure - Robina

Day 23 of 31

Streets affected: Scottsdale Drive between Christine Avenue and Laurel Oak Drive; Laurel Oak Drive between Scottsdale Drive and Mountain Ash Circuit (parking lane/bay closure with hold and release for 2 minutes maximum)

Show more

Start date: 11 May 2019

End date: 10 June 2019

Duration: 6:30am – 6:30pm

Reason: To assist large construction vehicles in and out of development site

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 21 of 60

Streets affected: Gold Coast Highway (loading zone closure) between Connor Street and West Street

Show more

Start date: 13 May 2019

End date: 11 July 2019

Duration: 6:30am – 6:30pm

Reason: The Loading Zone will be used by pedestrians to bypass a footpath closure

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 21 of 66

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) between Nineteenth Avenue and Fifteenth Avenue

Start date: 13 May 2019

End date: 17 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries of building materials / scaffolding to the construction site

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 19 of 32

Streets affected: Old Pacific Highway (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Fig Tree Court and Leo Graham Way

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 9:00am 2:30pm

Reason: Closure to facilitate water main crossing requiring trenching

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 18 of 31

Streets affected: Birmingham Road (lane, bike lane and verge/footpath closure) between Emanual College Drive and Nielsens Road

 

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Pavement investigation services

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 18 of 93

Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road

 

 

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: Midnight 11:59pm

Reason: Continuous footpath closure to facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 18 of 93

Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: 6:30am – 6:30pm

Reason: Full road closure at end of road to facilitate construction activities when required for safety

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 17 of 61

Streets affected: Helensvale Road (verge/footpath, partial lane closure) between Hannaford Place and Siganto Drive

Show more

Also affected: Woodside Place, Grey Gum Street, Shepparton Road, Michigan Drive, Parkside Drive, John Dalley Drive

Start date: 17 May 2019

End date: 16 July 2019

Duration: 6:30am – 6:30pm

Reason: NBN Works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 17 of 32

Streets affected: Stanmore Road (lane, bike lane verge/footpath closure with hold and release for 2 minutes maximum) between Paterson Road and Quarry Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 17 of 32

Streets affected: Enkleman Street (lane, bike lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanmore Road and Taperoo Court

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 17 of 32

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 9:00am 2:30pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 16 of 31

Streets affected: Fourth Avenue (verge/footpath closure) between Third Avenue and Fifth Avenue

 

 

Show more

Start date: 18 May 2019

End date: 17 June 2019

Duration: Midnight 11.59pm

Reason: To facilitate a safe work place for the construction site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 14 of 14

Streets affected: Tallebudgera Drive (full road closure with detours) between Townson Avenue and Gold Coast Highway

Show more

Start date: 19 May 2019

End date: 2 June 2019

Duration: 6pm – 6am

Reason: Road pavement profiled and overlayed with asphalt

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 14 of 15

Streets affected: Sovereigh Drive (half road closure with hold and release for 2 minutes maximum) between Apollo Avenue and Dame Pattie Avenue (north)

 

Show more

Start date: 20 May 2019

End date: 3 June 2019

Duration: 6:30am 6:30pm

Reason: Pavement profile and resealing works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 14 of 20

Streets affected: Alec Avenue between Peter Parade and Hillcrest Parade; Kiers Road between Karbunya Street and Kallay Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 20 May 2019

End date: 8 June 2019

Duration: 6:30am – 5:30pm

Reason: Kerb and channelling on all four corners of Alec Avenue and Kiers Road intersection

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 14 of 40

Streets affected: Railway Parade (lane, bike lane, shoulder, verge/footpath, with hold and release for 2 minutes maximum) between Nerang-Broadbeach Road and Grenfell Street

Show more

Start date: 20 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm

Reason: Water main replacement program

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 13 of 18

Streets affected: Sandy Creek Road (half road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Start date: 20 May 2019

End date: 7 June 2019

Duration: 6:30pm 6:00am

Reason: Road profiling and asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 13 of 31

Streets affected: Quarry Road (rolling blockade) between Rossmanns Road and Stapylton Jacobs Well Road

 

Show more

Start date: 20 May 2019

End date: 20 June 2019

Duration: 7:00pm 5:00am

Reason: To facilitate falling weight deflectometer and ground penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 13 of 14

Streets affected: Reserve Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Highland Way and Lakes End Court

Show more

Start date: 20 May 2019

End date: 3 June 2019

Duration: 7:00pm 5:00am

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 13 of 46

Streets affected: Bondi Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and end of road

 

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 13 of 46

Streets affected: Bondi Avenue (parking lane/bays closure) between Gold Coast Highway and End of road

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 13 of 92

Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway

Show more

Start date: 21 May 2019

End date: 20 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Miami

Day 13 of 32

Streets affected: Avalon Parade (parking lane closure) between Pacific Avenue and Paradise Avenue

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate sewer connection to existing manhole

south

Road closures

Planned - Temporary Road Closure - Tugan

Day 13 of 32

Streets affected: Singh Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Wyberba Street and end of street

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: Connect communications to existing pole

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 13 of 15

Streets affected: Upper Ormeau Road (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Thompson Road and Landsdowne Drive

 

Show more

Start date: 21 May 2019

End date: 4 June 2019

Duration: 6:30am 6:30pm (half road closure with hold and release)

Duration:  Midnight - 11:59pm (verge/footpath closure)

Reason: Driveway construction works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 11 of 28

Streets affected: Mattocks Road (rolling lane closure) between Treeview Drive North and Bushtree Court

 

Show more

Start date: 22 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: Undertake falling weight deflectometer and ground penetration radar testing

south

Road closures

Planned - Temporary Road Closure - Miami

Day 11 of 11

Streets affected: Gold Coast Highway (verge/footpath closure) between Pacific Avenue and Paradise Avenue

 

Show more

Start date: 23 May 2019

End date: 2 June 2019

Duration: 9:30am 2:30pm (Monday to Friday)

Duration:  6:30am - 6.30pm (Saturday to Sunday)

Reason: Construction of a driveway at Miami High School

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 11 of 16

Streets affected: Shipper Drive (shoulder, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Ford Road and End of road

Show more

Start date: 23 May 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm - Shoulder and verge/footpath closure

Duration 2: 9am - 2:30pm - Half road closure with hold and release

Reason: Installation of temporary dredge delivery pipe

north

Road closures

Planned - Temporary Road Closure - Molendinar

Day 10 of 17

Streets affected: Olsen Avenue (shoulder, verge/footpath closure) between Crestwood Drive and Smith Street

 

Show more

Start date: 23 May 2019

End date: 9June 2019

Duration: 800pm 5:00am

Reason: Removal and replacement of crossover

north

Road closures

Planned - Temporary Road Closures - Yatala

Day 9 of 10

Streets affected: Pearson Road (full road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Date: 24 May 2019 to 27 May 2019

Also affected: Computer Road (full road closure with hold and release for 2 minutes maximum) between Byte Street and Pearson Road

Date: 31 May 2019 to 3 June 2019

Duration: 6pm – 5am

Reason: Construction of 3 service crossings at intersection for new development

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 9 of 26

Streets affected: Christine Avenue (Rolling lane closure) between Bridgewater Drive and Varsity College car park

 

Show more

Start date: 24 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: To undertake falling weight deflectometer and ground testing penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 30

Streets affected: Cavill Avenue (partial lane closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevarde and Ferny Avenue

Show more

Start date: 24 May 2019

End date: 23 June 2019

Duration: 8pm – 5am

Reason: Falling weight deflectometer and ground penetrating radar investigations

north

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 9 of 32

Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive

Show more

Start date: 25 May 2019

End date: 25 June 2019

Duration: 6:30am – 6:30pm

Reason: Large deliveries, concrete pours, trucks and construction vehicles entering and exiting the site

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 7 of 12

Streets affected: Somerset Drive (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Jarema Drive and Bonogin Road

Show more

Also affected: Somerset Drive between Gemvale Road and Swanton Drive; Gemvale Road between Jarema Drive and Alvey Court

Start date: 26 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Merrimac

Day 7 of 7

Streets affected: Boowaggan Road (half road closure with hold and release for 2 minutes maximum) between Gooding Drive and Robina Parkway

Show more

Start date: 26 May 2019

End date: 2 June 2019

Duration: 8pm – 5am

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closures - Surfers Paradise

Day 7 of 93

Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 27 May 2019

End date: 27 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate road works, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Pacific Pines

Day 7 of 15

Streets affected: Midway Terrace (half road closure with hold and release for 2 minutes maximum) between Hillary Circuit and Santa Isobel Boulevard

 

 

 

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 6:30am 6:30pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 7 of 32

Streets affected: Cassia Street between Bayview Street and Joseph Street; Joseph Street between Poinsettia Avenue and Howard Street (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works, including inspections, cleaning and reline installations

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 7 of 33

Streets affected: Finnegan Way (verge/footpath, parking lane/bay closure) between Ritz Drive and Chromata Lane

Show more

Start date: 27 May 2019

End date: 28 June 2019

Duration: 7am – 2pm

Reason: Installation of a weathproof shelter over the footpath between the Coomera Rivers State School boundary and the 'Stop Drop and Go' parking/drop off lane

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 7 of 15

Streets affected: White Street (lane, partial lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Price Street and Nerang Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 15

Streets affected: Brighton Parade (bike lane, half road closure with hold and release for 2 minutes maximum) between Como Crescent and Como Crescent

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 7 of 12

Streets affected: Surf Parade (verge/footpath closure with hold and release for 2 minutes maximum) between Victoria Avenue and Queensland Avenue

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7am – 5pm

Reason: Removing coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 7 of 13

Streets affected: Jefferson Lane (full road closure with local access for residents with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Dates: 27 - 31 May 2019; 3 - 8 June 2019

Duration: 7am – 5pm

Reason: Concrete pours for paths, stairs and crossovers including landscaping supplies

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 7 of 32

Streets affected: Marina Quays Boulevarde (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Waters Close and Crescent Avenue

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 7am – 5pm

Reason: Gas main extension

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 7 of 17

Streets affected: Reserve Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Rose Valley Drive and Greenleaf Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9am – 2:30pm

Reason: Modify existing guardrail

north

Road closures

Planned - Temporary Road Closure - Robina

Day 7 of 17

Streets affected: Cottesloe Drive (parking lane closure) between Grenaside Court and Pyrmont Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9:30am – 3pm

Reason: Removal of two existing guardrails

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 6 of 11

Streets affected: Highland Way (bike lane, half road closure with hold and release for 2 minutes maximum) between Skyridge Drive and Rose Valley Drive

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 6 of 14

Streets affected: Griffith Street (half road closure with hold and release for 2 minutes maximum) between Warner Street and Dixon Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 11:59pm (Sun - Thu only) – 5am (Mon - Fri only)

Reason: Replacement of street light on a centre traffic island

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 6 of 15

Streets affected: Banyula Drive between Evers Street and Coolibah Road; Matilda Road between End of road and Banyula Drive (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 28 May 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: To repair and replace broken guardrail

north

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 8

Streets affected: Bay Street (half road closure with hold and release for 2 minutes maximum) between High Street and Rawlins Street

Show more

Start date: 28 May 2019

End date: 4 June 2019

Duration: 6:30am – 6:30pm

Reason: Placement of crane to facilitate pre-cast concrete installation

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 6 of 32

Streets affected: Sunshine Boulevarde (lane, verge/footpath closure) between Surfers Avenue and Gretel Drive

Show more

Start date: 28 May 2019

End date: 28 June 2019

Duration: 9am – 1pm

Reason: To facilitate safe ingress and egress of construction vehicles

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 5 of 64

Streets affected: Markeri Street (lane closure) between Sunshine Boulevarde and Avanti Street

Show more

Start date: 29 May 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 5 of 32

Streets affected: Bienvenue Drive (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Clives Circuit and Itong Place

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 6:30am – 1pm

Reason: Excavate and remove existing water meter; install new meter and concrete lid

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 5 of 32

Streets affected: Peachey Road (lane, shoulder, verge/footpath closure with hold and release for 2 minutes maximum) between Caswell Court and Oppermann Drive

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 7am – 7pm

Reason: Installation of drainage line from flow meter to gully

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 5 of 73

Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road

Show more

Start date: 29 May 2019

End date: 9 August 2019

Duration: 7am – 5pm

Reason: New recycled water investigation - potholing stage

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 13

Streets affected: Gilston Road (lane closure) between Winderadeen Court and New Street

Show more

Start date: 29 May 2019

End date: 11 Jun 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 9

Streets affected: Queen Street between Mal Burke Street and Ward Street; Mal Burke Street between Queen Street and Pohlman Street (full road closure with detour)

Show more

Start date: 29 May 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: To facilitate sewer connection under road way for new development

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 3 of 10

Streets affected: Philippine Parade (lane, verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 31 May 2019

End date: 9 June 2019

Duration: 12am – 11:59pm

Reason: Building a manhole for sewer connection

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 3 of 57

Streets affected: Eggersdorf Road (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Arthur Way and Stewart's Road

Show more

Start date: 31 May 2019

End date: 26 July 2019

Duration: 12am – 11:59pm

Reason: Road duplication/upgrading of Eggersdorf Road - Phase 3

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 3 of 32

Streets affected: Nelson Avenue (shoulder, verge/footpath closure) between Pool Street and Sheehan Drive

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 3 of 32

Streets affected: Oxley Drive (shoulder, verge/footpath closure) between Crescent Avenue and Sunbird Place

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 3 of 15

Streets affected: McLaren Road (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Castagno Avenue and Fillmore Street

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration 1: 9:30am – 2:30pm (Mon - Fri)

Duration 2: 6:30am - 6:30pm (Saturdays)

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 3 of 15

Streets affected: Reserve Road between Lawson Drive and Coldcrest Drive; Old Coach Road between Reserve Road and Baileys Mountain Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9am – 2:30pm

Reason: Install coloured surfacing at roundabout and approaches

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 2 of 14

Streets affected: Benowa Road between St Kevins Avenue and Allchurch Street; Mediterranean Drive between Mary Ann Street and Benowa Road (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9pm – 6am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 2 of 61

Streets affected: Salzburg Road (full road closure with detours) between Barry Street and Yawalpah Road

Show more

Also affected: Yawalpah Road (verge/footpath closure with hold and release for 2 minutes maximum) between Attenborough Boulevarde and Old Pacific Motorway

Start date: 1 June 2019

End date: 31 July 2019

Duration 1: 12am – 11:59pm

Duration 2: 9am - 2:30pm (Yawalpah Road)

Reason: Stage 2 (1 June - 12 July 2019)   and   Stage 3 (13 July - 31 July 2019) works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 2 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 2 of 8

Streets affected: Bayview Street (bike lane, shoulder closure with hold and release for 2 minutes maximum) between Simbai Street and Lae Drive

Show more

Start date: 1 June 2019

End date: 8 June 2019

Duration 1: 6:30am – 6:30pm (Saturdays)

Duration 2: 9:30am - 2:30pm 

Reason: To facilitate overhead works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 2 of 92

Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street

Show more

Start date: 1 June 2019

End date: 31 August 2019

Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Bonogin

Day 2 of 30

Streets affected: Bonogin Road (verge/footpath, half road, parking lane/bay, bike lane, shoulder closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Canopy Drive

Show more

Also affected: Hardys Road (slip lane, shoulder closure) between Bonogin Road and Glenmore Drive

Also affected: Carrington Road (verge/footpath, shoulder closure) between Bonogin Road and Tahilia Court

Start date: 1 June 2019

End date: 30 June 2019

Duration: 7am – 5pm

Reason: Water main renewal works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 6

Streets affected: Ferny Avenue (lane, partial lane, shoulder, metered parking/loading zone, full road closure with hold and release for 2 minutes maximum) between Beach Road and Gold Coast Highway

Show more

Start date: 1 June 2019

End date: 6 June 2019

Duration: 6pm – 6am

Reason: Road rehabilitation mill and fill

north

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 31

Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone, half road closure) between Bay Street and Windmill Street

Show more

Start date: 2 June 2019

End date: 2 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction deliveries only when required

north

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 6

Streets affected: Wilson Street between Jimmieson Avenue and Musgrave Avenue; Neville Avenue between Chuter Avenue and Musgrave Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 2 June 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: Water and Waste sewer relining

north

 
3 Jun - Monday
Water and sewerage

Unplanned - Water interruption - Yatala

7.15am - 10.30am

Streets affected: Logistics Street, Union Circuit, Link Drive, Darlington Drive

Cause: Repair water main

W/O: 20515324

Notif: 1000576994

north

Water and sewerage

Unplanned - Water Interruption - Bundall

12.03pm - 1.03pm

Streets affected: Wallaby Place

Cause: Repair water leak

W/O: 20513576

Notif: 1000574927

central

Water and sewerage

Unplanned - Water interruption - Tallebudgera

1.15pm - 3.15pm

Streets affected: Daffodil Street

Cause: Repair water leak

W/O: 20515022

Notif: 1000577102

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 203 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 187 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 141 of 200

Streets affected: Old Coach Road between Phaeton Street and Days Road; Days Road between Coomera Grand Drive and Old Coach Road (verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 12am – 11:59pm

Reason: Intersection Upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 141 of 200

Streets affected: Old Coach Road between Days Road and Coomera Grand Drive; also between Phaeton Street and Days Road (partial lane, bike lane and verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 123 of 150

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure)

Show more

Start date: 1 February 2019

End date: 30 June 2019

Duration: 6:30am – 2:30pm

Reason: Lane closure on approach to and including roundabout

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 122 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 109 of 136

Streets affected: Marine Parade (parking lane/bay closure with hold and release for 2 minutes maximum) between Ocean Street and Taylor Street

Show more

Start date: 15 February 2019

End date: 30 June 2019

Duration 1: 6:30am – 6pm (Hold and Release)

Duration 2: 12am - 11:59pm (car park)

Reason: To support the turning and entering of extra long vehicles into Quota Park for works activities

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 97 of 99

Streets affected: River Terrace (verge/footpath, full road closure with local access only) between Enderley Avenue and End of road

Show more

Start date: 27 February 2019

End date: 5 June 2019

Duration: 12am – 11:59pm

Reason: Construction of emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 95 of 120

Streets affected: Marine Parade (half road, partial verge/footpath closure with hold and release for 2 minutes maximum) between Burrows Street and Taylor Street

Show more

Start date: 1 March 2019

End date: 28 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate delivery vehicles and concrete pours

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 92 of 93

Streets affected: Old Burleigh Road (verge/footpath closure) between Fern Street and Wharf Road

Show more

Start date: 4 March 2019

End date: 4 June 2019

Duration: 12am – 11:59pm

Reason: For the placement of site sheds

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 92 of 93

Streets affected: Wharf Road (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 4 March 2019

End date: 4 June 2019

Duration: 6:30am – 10pm

Reason: To facilitate roadworks, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 90 of 93

Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street

Show more

Start date: 6 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries and ingress and egress of vehicles; also to facilitate large concrete pours

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 89 of 92

Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 7 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 89 of 123

Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 March 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 87 of 92

Streets affected: Gold Coast Highway (footpath closure) between Connor Street and West Street

Show more

Start date: 9 March 2019

End date: 8 June 2019

Duration: 12am – 11:59pm

Reason: Occupation of footpath for location of overhead gantry

south

Road closures

Planned - Temporary Road Closure - Southport

Day 85 of 93

Streets affected: 216 Queen Street (verge/footpath closure with hold and release for 2 minutes maximum) between Mal Burke Street and Ward Street

Show more

Start date: 11 March 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: Construction activities for the demolition of an existing dwelling plus the site establishment for building a new 4 storey unit development

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 81 of 108

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure on approach to and including roundabout)

Show more

Start date: 15 March 2019

End date: 30 June 2019

Duration: 6:30am – 5:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Robina

Day 79 of 175

CBUS Super Stadium - Events - NRL Season

Show more

Cheltenham Drive (Westbound) - CLOSED - local access only.

Robina Station Road - CLOSED - buses only.

Stadium Drive - CLOSED - pedestrians only.

Game Dates:

17 March 2019   /   12 April 2019   /   21 April 2019   /   18 May 2019   /   14 June 2019

29 June 2019   /   21 July 2019   /   27 July 2019   /   16 August 2019   /   7 September 2019

Duration: 7am – 11:30pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 77 of 93

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 19 March 2019

End date: 19 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 75 of 92

Streets affected: Twenty Forth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N

 

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: Midnight 11:59pm

Reason: Continuous partial verge/footpath closure for pedestrian safety

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 75 of 92

Streets affected: Cannes Avenue between Gold Coast Highway and Genoa Street; Genoa Street between Gold Coast Highway and Cannes Avenue (verge/footpath, partial lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 75 of 92

Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace North and Gold Coast Highway

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement of construction related vehicles

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 68 of 96

Streets affected: Frigo Court (metered parking / loading zone) between Karp Court and Crombie Avenue

 

Show more

Start date: 28 March 2019

End date: 1 July 2019

Duration: Midnight  11.59pm

Reason: Storage of building equipment (3 parking bays to be fenced off with temporary fencing)

north

Road closures

Planned - Temporary Road Closure - Miami

Day 64 of 91

Streets affected: Nobby Parade (full road closure local traffic access only) between Albion Avenue and Nundah Avenue

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert crossing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 64 of 91

Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site

north

Road closures

Planned - Temporary Road Closure - Miami

Day 64 of 91

Streets affected: Gold Coast Highway outside Miami High School (verge / footpath closure with hold and release for 2 minutes maximum) between Chairlift Avenue and Santa Monica Road

 

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am 3:30pm

Reason: Construction of a car park within Miami High School

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 61 of 92

Streets affected: Old Burleigh Road (half road, lane closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street

 

Show more

Start date: 4 April 2019

End date: 4 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate movement of construction vehicles

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 60 of 62

Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Date 1: 5 April 2019 to 18 April 2019

Date 2: 29 April 2019 to 5 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 57 of 61

Streets affected: Captain Cook Drive (lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Kendor Street and Demand Avenue

Show more

Start date: 8 April 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm (shoulder, verge/footpath closure)

Duration 2: 9am - 2:30pm (half road with hold and release)

Duration 3: 12am - 11:59pm (lane, verge/footpath closure with contraflow)

Reason: Works associated with a development including: bulk earthworks, civil works, roadworks and landscaping

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 57 of 91

Streets affected: Rutledge Street (parking bays closure) between Musgrave Street and Cul de sac

Show more

Start date: 8 April 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 53 of 62

Streets affected: Foxwell Road (partial verge/footpath closure with hold and release intermittent for 2 minutes maximum) between Oakey Creek Road and Shipper Drive

Show more

Start date: 12 April 2019

End date: 12 June 2019

Duration 1: 9am – 6:30pm (Hold and Release for Westbound Carriageway only)

Duration 2: 6:30am - 6:30pm (Partial Verge/Footpath closure)

Reason: Construction of Coomera State High School

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 51 of 92

Streets affected: Jefferson Lane (verge/footpath closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 14 April 2019

End date: 14 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 51 of 59

Streets affected: Arcadia Drive (half road closure with hold and release for 2 minutes maximum) between Himalaya Street and Canberra Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 51 of 76

Streets affected: Mervyn Thomas Drive (shoulder, verge/footpath closure) between Broadwater Avenue and Halcyon Way

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 51 of 76

Streets affected: Pendraat Parade (shoulder, verge/footpath closure) between Sickle Avenue and Pendraat Parade cul de sac

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 51 of 59

Streets affected: Jabiru Avenue (half road closure with hold and release for 2 minutes maximum) between Avocet Avenue and Fantail Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for stormwater relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 51 of 76

Streets affected: Halcyon Way (shoulder, verge/footpath, parking lane/bay closure) between Mervyn Thomas Drive and Crescent Avenue

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 51 of 59

Streets affected: Kalimna Drive (half road closure with hold and release for 2 minutes maximum) between Moana Park Avenue and End of road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 51 of 59

Streets affected: Allambi Avenue (half road closure with hold and release for 2 minutes maximum) between Naranga Avenue and Ilkinia Avenue

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 51 of 76

Streets affected: Marina Quays Boulevarde (shoulder, verge/footpath, parking lane/bay closure) between Sickle Avenue and Waters Close

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 51 of 59

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Kikori Crescent and Howard Street

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 51 of 59

Streets affected: Savoy Drive (half road closure with hold and release for 2 minutes maximum) between Allambi Avenue and Boongala Road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 50 of 92

Streets affected: Pearson Road (verge/footpath closure) between Kiralea Court and Darlington Drive

Show more

Start date: 15 April 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate implementation of heavy vehicle warning signs for construction site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 48 of 91

Streets affected: Elizabeth Avenue (verge/footpath closure) between Surf Parade and Old Burleigh Road

Show more

Start date: 17 April 2019

End date: 16 July 2019

Duration: 12am – 11:59pm

Reason: For the placement of an overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 47 of 62

Streets affected: Jefferson Lane (half road closure with hold and release for 2 minutes maximum) between Third Avenue and Laceys Lane

Show more

Start date: 18 April 2019

End date: 18 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 45 of 92

Streets affected: Surfers Paradise Boulevard (occasional hold and release for 2 minutes maximum of traffic and pedestrians) between Staghorn Avenue and Palm Avenue

 

Show more

Start date: 20 April 2019

End date: 20 July 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction vehicles to safely reverse from site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 42 of 91

Streets affected: Elizabeth Avenue (parking bay closure) between Old Burleigh Road and Surf Parade

Show more

Start date: 23 April 2019

End date: 22 July 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 41 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 24 April 2019

End date: 24 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

Day 41 of 53

Streets affected: Markeri Street between Caulfield Street and Greenwich Court and Greenwich Court between Markeri Street and cul-de-sac (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum)

 

 

Show more

Start date: 24 April 2019

End date: 15 June 2019

Duration: 9:00am 14:00pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Highland Park

Day 39 of 81

Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a boulder retaining wall

north

Road closures

Planned - Temporary Road Closure - Lower Beechmont

Day 39 of 81

Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a timber retaining wall

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 36 of 43

Streets affected: Cavill Avenue (partial footpath) between Orchid Avenue and The Esplanade

 

Show more

Start date: 29 April 2019

End date:  10 June 2019

Duration: Continuous

Reason: Installation of scaffolding to complete external works associated with the redevelopment of the Surfers Paradise Beer Garden

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 35 of 92

Streets affected: Gold Coast Highway (verge closure) between Thrower Drive and Hawaii Avenue

Show more

Start date: 30 April 2019

End date: 30 July 2019

Duration: 12am – 11:59pm

Reason: Occupation of verge for construction activities ensuring the footpath remains open at all times

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 34 of 84

Streets affected: Kerkin Road North (full road closure with detour and hold and release for 2 minutes maximum) between Yawalpah Road and Gainsborough Drive

 

Show more

Start date: 1 May 2019

End date: 23 July 2019

Duration: Midnight  11:59pm

Reason: Construction of a new roundabout and road widening

north

Road closures

Planned - Temporary Road Closure - Jacobs Well

Day 34 of 61

Streets affected: Helmore Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Harbour Boulevard and Garagul Street

 

Show more

Start date: 1 May 2019

End date: 30 June 2019

Duration: 6:30am 6:00pm

Reason: Road widening, pavement surfacing and line marking

north

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 33 of 58

Streets affected: Boundary Street (half road closure with hold and release for 2 minutes maximum) between Hayter Street and Jewel Street

 

Show more

Start date: 1 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm (traffic controllers onsite) and 5.00pm - 7.00am (portable traffic signals onsite)

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 33 of 124

Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street

 

Show more

Start date: 2 May 2019

End date: 2 September 2019

Duration: Midnight 11.59pm

Reason: Associated construction activity for Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 33 of 58

Streets affected: Karloo Street between Mawarra Street and Burra Street (half road closure with hold and release for 2 minutes maximum) and Mawarra Street between Stanhill Drive and Thomas Drive (partial lane, parking bays, verge/footpath)

 

Show more

Start date: 2 May 2019

End date: 28 June 2019

Duration: Midnight 11.59pm

Reason: Street scaping project to the Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 32 of 59

Streets affected: Pacific Parade (verge/footpath closure) between Johnston Street and Archer Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: Continuous

Reason: Footpath closure for occupation of site office and construction materials

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 32 of 59

Streets affected: Pacific Parade (half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 30 of 62

Streets affected: Albatross Avenue (bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Seashell Avenue and Heron Avenue

 

Show more

Start date: 5 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Daily closures to facilitate deliveries to site

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 28 of 32

Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade

 

Show more

Start date: 7 May 2019

End date: 7 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 28 of 61

Streets affected: Markeri Street, Australia Avenue, Queensland Avenue, Gold Coast Highway, Jubilee Avenue (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 7 May 2019

End date: 6 July 2019

Duration: 6:30am 6:30pm

Reason: NBN / telecommunication installation

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 27 of 41

Streets affected: Old Coach Road (lane, bike lane, shoulder closure) between Low Drive and Marsh Street

Show more

Start date: 7 May 2019

End date: 17 June 2019

Duration: 7pm – 5am

Reason: Undertake Falling Weight Deflectometer (FWD) and Ground Penetration Radar (GPR) Testing under rolling traffic control conditions

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 27 of 93

Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate site sheds and material storage for development site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 27 of 31

Streets affected: Fourth Avenue (full road closure local traffic access only) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone in designated parking bays

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 27 of 31

Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 27 of 31

Streets affected: Eady Avenue (partial lane, verge/footpath closure) between T E Peters Drive and No Through Road

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate trenching works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 27 of 93

Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Construction Works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 27 of 93

Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 27 of 93

Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Detour for one way of traffic to facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 26 of 32

Streets affected: Marina Quays Boulevard (shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Crescent Avenue and Mervyn Thomas Drive

 

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am 6:00pm

Reason: Sewer main works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 26 of 92

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate vehicle movement in and out of construction site

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 26 of 32

Streets affected: Peninsular Drive (verge/footpath closure) between Holborow Close and Watson Esplanade

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am – 6pm

Reason: Facilitate relocation of overhead power cables beneath the ground

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 26 of 92

Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street

Show more

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate material and equipment deliveries plus various construction activities

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 25 of 62

Streets affected: Baker Avenue (verge/footpath closure) between Frank Street and Proud Street

Show more

Start date: 10 May 2019

End date: 10 July 2019

Duration: 12am – 11:59pm

Reason: To facilitate new development site

north

Road closures

Planned - Temporary Road Closure - Robina

Day 24 of 31

Streets affected: Scottsdale Drive between Christine Avenue and Laurel Oak Drive; Laurel Oak Drive between Scottsdale Drive and Mountain Ash Circuit (parking lane/bay closure with hold and release for 2 minutes maximum)

Show more

Start date: 11 May 2019

End date: 10 June 2019

Duration: 6:30am – 6:30pm

Reason: To assist large construction vehicles in and out of development site

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 22 of 60

Streets affected: Gold Coast Highway (loading zone closure) between Connor Street and West Street

Show more

Start date: 13 May 2019

End date: 11 July 2019

Duration: 6:30am – 6:30pm

Reason: The Loading Zone will be used by pedestrians to bypass a footpath closure

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 22 of 66

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) between Nineteenth Avenue and Fifteenth Avenue

Start date: 13 May 2019

End date: 17 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries of building materials / scaffolding to the construction site

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 20 of 32

Streets affected: Old Pacific Highway (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Fig Tree Court and Leo Graham Way

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 9:00am 2:30pm

Reason: Closure to facilitate water main crossing requiring trenching

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 19 of 31

Streets affected: Birmingham Road (lane, bike lane and verge/footpath closure) between Emanual College Drive and Nielsens Road

 

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Pavement investigation services

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 19 of 93

Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road

 

 

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: Midnight 11:59pm

Reason: Continuous footpath closure to facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 19 of 93

Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: 6:30am – 6:30pm

Reason: Full road closure at end of road to facilitate construction activities when required for safety

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 18 of 61

Streets affected: Helensvale Road (verge/footpath, partial lane closure) between Hannaford Place and Siganto Drive

Show more

Also affected: Woodside Place, Grey Gum Street, Shepparton Road, Michigan Drive, Parkside Drive, John Dalley Drive

Start date: 17 May 2019

End date: 16 July 2019

Duration: 6:30am – 6:30pm

Reason: NBN Works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 18 of 32

Streets affected: Stanmore Road (lane, bike lane verge/footpath closure with hold and release for 2 minutes maximum) between Paterson Road and Quarry Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 18 of 32

Streets affected: Enkleman Street (lane, bike lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanmore Road and Taperoo Court

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 18 of 32

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 9:00am 2:30pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 17 of 31

Streets affected: Fourth Avenue (verge/footpath closure) between Third Avenue and Fifth Avenue

 

 

Show more

Start date: 18 May 2019

End date: 17 June 2019

Duration: Midnight 11.59pm

Reason: To facilitate a safe work place for the construction site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 15 of 15

Streets affected: Sovereigh Drive (half road closure with hold and release for 2 minutes maximum) between Apollo Avenue and Dame Pattie Avenue (north)

 

Show more

Start date: 20 May 2019

End date: 3 June 2019

Duration: 6:30am 6:30pm

Reason: Pavement profile and resealing works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 15 of 20

Streets affected: Alec Avenue between Peter Parade and Hillcrest Parade; Kiers Road between Karbunya Street and Kallay Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 20 May 2019

End date: 8 June 2019

Duration: 6:30am – 5:30pm

Reason: Kerb and channelling on all four corners of Alec Avenue and Kiers Road intersection

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 15 of 40

Streets affected: Railway Parade (lane, bike lane, shoulder, verge/footpath, with hold and release for 2 minutes maximum) between Nerang-Broadbeach Road and Grenfell Street

Show more

Start date: 20 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm

Reason: Water main replacement program

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 14 of 18

Streets affected: Sandy Creek Road (half road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Start date: 20 May 2019

End date: 7 June 2019

Duration: 6:30pm 6:00am

Reason: Road profiling and asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 14 of 31

Streets affected: Quarry Road (rolling blockade) between Rossmanns Road and Stapylton Jacobs Well Road

 

Show more

Start date: 20 May 2019

End date: 20 June 2019

Duration: 7:00pm 5:00am

Reason: To facilitate falling weight deflectometer and ground penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 14 of 14

Streets affected: Reserve Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Highland Way and Lakes End Court

Show more

Start date: 20 May 2019

End date: 3 June 2019

Duration: 7:00pm 5:00am

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 14 of 46

Streets affected: Bondi Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and end of road

 

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 14 of 46

Streets affected: Bondi Avenue (parking lane/bays closure) between Gold Coast Highway and End of road

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 14 of 92

Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway

Show more

Start date: 21 May 2019

End date: 20 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Miami

Day 14 of 32

Streets affected: Avalon Parade (parking lane closure) between Pacific Avenue and Paradise Avenue

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate sewer connection to existing manhole

south

Road closures

Planned - Temporary Road Closure - Tugan

Day 14 of 32

Streets affected: Singh Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Wyberba Street and end of street

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: Connect communications to existing pole

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 14 of 15

Streets affected: Upper Ormeau Road (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Thompson Road and Landsdowne Drive

 

Show more

Start date: 21 May 2019

End date: 4 June 2019

Duration: 6:30am 6:30pm (half road closure with hold and release)

Duration:  Midnight - 11:59pm (verge/footpath closure)

Reason: Driveway construction works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 12 of 28

Streets affected: Mattocks Road (rolling lane closure) between Treeview Drive North and Bushtree Court

 

Show more

Start date: 22 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: Undertake falling weight deflectometer and ground penetration radar testing

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 12 of 16

Streets affected: Shipper Drive (shoulder, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Ford Road and End of road

Show more

Start date: 23 May 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm - Shoulder and verge/footpath closure

Duration 2: 9am - 2:30pm - Half road closure with hold and release

Reason: Installation of temporary dredge delivery pipe

north

Road closures

Planned - Temporary Road Closure - Molendinar

Day 11 of 17

Streets affected: Olsen Avenue (shoulder, verge/footpath closure) between Crestwood Drive and Smith Street

 

Show more

Start date: 23 May 2019

End date: 9June 2019

Duration: 800pm 5:00am

Reason: Removal and replacement of crossover

north

Road closures

Planned - Temporary Road Closures - Yatala

Day 10 of 10

Streets affected: Pearson Road (full road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Date: 24 May 2019 to 27 May 2019

Also affected: Computer Road (full road closure with hold and release for 2 minutes maximum) between Byte Street and Pearson Road

Date: 31 May 2019 to 3 June 2019

Duration: 6pm – 5am

Reason: Construction of 3 service crossings at intersection for new development

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 10 of 26

Streets affected: Christine Avenue (Rolling lane closure) between Bridgewater Drive and Varsity College car park

 

Show more

Start date: 24 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: To undertake falling weight deflectometer and ground testing penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 10 of 30

Streets affected: Cavill Avenue (partial lane closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevarde and Ferny Avenue

Show more

Start date: 24 May 2019

End date: 23 June 2019

Duration: 8pm – 5am

Reason: Falling weight deflectometer and ground penetrating radar investigations

north

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 10 of 32

Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive

Show more

Start date: 25 May 2019

End date: 25 June 2019

Duration: 6:30am – 6:30pm

Reason: Large deliveries, concrete pours, trucks and construction vehicles entering and exiting the site

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 8 of 12

Streets affected: Somerset Drive (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Jarema Drive and Bonogin Road

Show more

Also affected: Somerset Drive between Gemvale Road and Swanton Drive; Gemvale Road between Jarema Drive and Alvey Court

Start date: 26 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closures - Surfers Paradise

Day 8 of 93

Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 27 May 2019

End date: 27 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate road works, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Pacific Pines

Day 8 of 15

Streets affected: Midway Terrace (half road closure with hold and release for 2 minutes maximum) between Hillary Circuit and Santa Isobel Boulevard

 

 

 

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 6:30am 6:30pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 8 of 32

Streets affected: Cassia Street between Bayview Street and Joseph Street; Joseph Street between Poinsettia Avenue and Howard Street (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works, including inspections, cleaning and reline installations

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 8 of 33

Streets affected: Finnegan Way (verge/footpath, parking lane/bay closure) between Ritz Drive and Chromata Lane

Show more

Start date: 27 May 2019

End date: 28 June 2019

Duration: 7am – 2pm

Reason: Installation of a weathproof shelter over the footpath between the Coomera Rivers State School boundary and the 'Stop Drop and Go' parking/drop off lane

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 8 of 15

Streets affected: White Street (lane, partial lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Price Street and Nerang Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 15

Streets affected: Brighton Parade (bike lane, half road closure with hold and release for 2 minutes maximum) between Como Crescent and Como Crescent

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 8 of 12

Streets affected: Surf Parade (verge/footpath closure with hold and release for 2 minutes maximum) between Victoria Avenue and Queensland Avenue

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7am – 5pm

Reason: Removing coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 8 of 13

Streets affected: Jefferson Lane (full road closure with local access for residents with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Dates: 27 - 31 May 2019; 3 - 8 June 2019

Duration: 7am – 5pm

Reason: Concrete pours for paths, stairs and crossovers including landscaping supplies

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 8 of 32

Streets affected: Marina Quays Boulevarde (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Waters Close and Crescent Avenue

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 7am – 5pm

Reason: Gas main extension

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 8 of 17

Streets affected: Reserve Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Rose Valley Drive and Greenleaf Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9am – 2:30pm

Reason: Modify existing guardrail

north

Road closures

Planned - Temporary Road Closure - Robina

Day 8 of 17

Streets affected: Cottesloe Drive (parking lane closure) between Grenaside Court and Pyrmont Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9:30am – 3pm

Reason: Removal of two existing guardrails

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 7 of 11

Streets affected: Highland Way (bike lane, half road closure with hold and release for 2 minutes maximum) between Skyridge Drive and Rose Valley Drive

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 7 of 14

Streets affected: Griffith Street (half road closure with hold and release for 2 minutes maximum) between Warner Street and Dixon Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 11:59pm (Sun - Thu only) – 5am (Mon - Fri only)

Reason: Replacement of street light on a centre traffic island

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 7 of 15

Streets affected: Banyula Drive between Evers Street and Coolibah Road; Matilda Road between End of road and Banyula Drive (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 28 May 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: To repair and replace broken guardrail

north

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 8

Streets affected: Bay Street (half road closure with hold and release for 2 minutes maximum) between High Street and Rawlins Street

Show more

Start date: 28 May 2019

End date: 4 June 2019

Duration: 6:30am – 6:30pm

Reason: Placement of crane to facilitate pre-cast concrete installation

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 7 of 32

Streets affected: Sunshine Boulevarde (lane, verge/footpath closure) between Surfers Avenue and Gretel Drive

Show more

Start date: 28 May 2019

End date: 28 June 2019

Duration: 9am – 1pm

Reason: To facilitate safe ingress and egress of construction vehicles

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 6 of 64

Streets affected: Markeri Street (lane closure) between Sunshine Boulevarde and Avanti Street

Show more

Start date: 29 May 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 6 of 32

Streets affected: Bienvenue Drive (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Clives Circuit and Itong Place

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 6:30am – 1pm

Reason: Excavate and remove existing water meter; install new meter and concrete lid

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 6 of 32

Streets affected: Peachey Road (lane, shoulder, verge/footpath closure with hold and release for 2 minutes maximum) between Caswell Court and Oppermann Drive

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 7am – 7pm

Reason: Installation of drainage line from flow meter to gully

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 6 of 73

Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road

Show more

Start date: 29 May 2019

End date: 9 August 2019

Duration: 7am – 5pm

Reason: New recycled water investigation - potholing stage

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 13

Streets affected: Gilston Road (lane closure) between Winderadeen Court and New Street

Show more

Start date: 29 May 2019

End date: 11 Jun 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 9

Streets affected: Queen Street between Mal Burke Street and Ward Street; Mal Burke Street between Queen Street and Pohlman Street (full road closure with detour)

Show more

Start date: 29 May 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: To facilitate sewer connection under road way for new development

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 4 of 10

Streets affected: Philippine Parade (lane, verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 31 May 2019

End date: 9 June 2019

Duration: 12am – 11:59pm

Reason: Building a manhole for sewer connection

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 4 of 57

Streets affected: Eggersdorf Road (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Arthur Way and Stewart's Road

Show more

Start date: 31 May 2019

End date: 26 July 2019

Duration: 12am – 11:59pm

Reason: Road duplication/upgrading of Eggersdorf Road - Phase 3

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 4 of 32

Streets affected: Nelson Avenue (shoulder, verge/footpath closure) between Pool Street and Sheehan Drive

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 4 of 32

Streets affected: Oxley Drive (shoulder, verge/footpath closure) between Crescent Avenue and Sunbird Place

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 15

Streets affected: McLaren Road (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Castagno Avenue and Fillmore Street

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration 1: 9:30am – 2:30pm (Mon - Fri)

Duration 2: 6:30am - 6:30pm (Saturdays)

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 4 of 15

Streets affected: Reserve Road between Lawson Drive and Coldcrest Drive; Old Coach Road between Reserve Road and Baileys Mountain Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9am – 2:30pm

Reason: Install coloured surfacing at roundabout and approaches

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 3 of 14

Streets affected: Benowa Road between St Kevins Avenue and Allchurch Street; Mediterranean Drive between Mary Ann Street and Benowa Road (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9pm – 6am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 3 of 61

Streets affected: Salzburg Road (full road closure with detours) between Barry Street and Yawalpah Road

Show more

Also affected: Yawalpah Road (verge/footpath closure with hold and release for 2 minutes maximum) between Attenborough Boulevarde and Old Pacific Motorway

Start date: 1 June 2019

End date: 31 July 2019

Duration 1: 12am – 11:59pm

Duration 2: 9am - 2:30pm (Yawalpah Road)

Reason: Stage 2 (1 June - 12 July 2019)   and   Stage 3 (13 July - 31 July 2019) works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 3 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 3 of 8

Streets affected: Bayview Street (bike lane, shoulder closure with hold and release for 2 minutes maximum) between Simbai Street and Lae Drive

Show more

Start date: 1 June 2019

End date: 8 June 2019

Duration 1: 6:30am – 6:30pm (Saturdays)

Duration 2: 9:30am - 2:30pm 

Reason: To facilitate overhead works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 3 of 92

Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street

Show more

Start date: 1 June 2019

End date: 31 August 2019

Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Bonogin

Day 3 of 30

Streets affected: Bonogin Road (verge/footpath, half road, parking lane/bay, bike lane, shoulder closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Canopy Drive

Show more

Also affected: Hardys Road (slip lane, shoulder closure) between Bonogin Road and Glenmore Drive

Also affected: Carrington Road (verge/footpath, shoulder closure) between Bonogin Road and Tahilia Court

Start date: 1 June 2019

End date: 30 June 2019

Duration: 7am – 5pm

Reason: Water main renewal works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 3 of 6

Streets affected: Ferny Avenue (lane, partial lane, shoulder, metered parking/loading zone, full road closure with hold and release for 2 minutes maximum) between Beach Road and Gold Coast Highway

Show more

Start date: 1 June 2019

End date: 6 June 2019

Duration: 6pm – 6am

Reason: Road rehabilitation mill and fill

north

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 31

Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone, half road closure) between Bay Street and Windmill Street

Show more

Start date: 2 June 2019

End date: 2 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction deliveries only when required

north

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 6

Streets affected: Wilson Street between Jimmieson Avenue and Musgrave Avenue; Neville Avenue between Chuter Avenue and Musgrave Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 2 June 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: Water and Waste sewer relining

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 1 of 12

Streets affected: Executive Drive (half road closure with hold and release for 2 minutes maximum) between Burleigh Connection Road and Bermuda Street

Show more

Also affected: Classic Way between Executive Drive and Bermuda Street

Start date: 3 June 2019

End date: 14 June 2019

Duration: 5am – 6:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure - Main Beach

6.00am - 6.00pm

Streets affected: Tedder Avenue (parking bay closure) between Peak Avenue and Woodroffe Avenue

Show more

Start date: 3 June 2019

End date: 3 June 2019

Duration: 6am – 6pm

Reason: Work Zone

5x parking bays (#5023 - #5027) + 2x loading zone bays (#LZ0122)

north

Road closures

Planned - Temporary Road Closure - Elanora

Day 1 of 43

Streets affected: Nineteenth Avenue (half road, parking lane/bay, bike lane closure with hold and release for 2 minutes maximum) between Angelica Street and Saffron Street

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6am – 6pm

Reason: Profiling, sealing and asphalt works

south

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 1 of 43

Streets affected: Lae Drive between Oxley Drive and Bayview Street; Moralla Avenue between Sports Drive and Folkstone Place (parking lane/bay, bike lane, lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: Remedial works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 1 of 5

Streets affected: Gold Coast Highway (parking bay closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone - 4x parking bays (#8107 to #8110)

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 1 of 59

Streets affected: Gold Coast Highway (verge/footpath closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: To install signs and complete works

south

Road closures

Planned - Temporary Road Closure - Miami

Day 1 of 24

Streets affected: Santa Monica Road between Chairlift Avenue East and Riviera Road; Paradise Avenue between Pacific Avenue and Bardon Avenue (verge/footpath, parking lane/bay closure)

Show more

Start date: 3 June 2019

End date: 26 June 2019

Duration: 6:30am – 6:30pm

Reason: Installation of CoGC conduit and fibre optic cable for the Digital City Expansion Project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 1 of 15

Streets affected: Main Beach Parade between Beulah Lane and MacArthur Parade; John Kemp Street between Pacific Street and Main Beach Parade (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 17 June 2019

Duration: 7am – 5pm

Reason: Install coloured works

north

Mosquito spraying

Planned - Pest Animal Trapping - Pimpama River Conservation Area

Day 1 of 12

Areas affected: Pimpama River Conservation Area

Pest animal trapping will be carried out within Pimpama River Conservation Area from 7.00am Monday 3rd June 2019 to 11.59pm Friday 14th June 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 5

Streets affected: Falconer Street (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Nerang Street and Ward Street

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 7am – 2pm

Reason: To facilitate water main road crossing cut dig and reinstate

north

Road closures

Planned - Temporary Road Closure - Tallebudgera Valley

Day 1 of 19

Streets affected: Tallebudgera Creek Road (half road closure with hold and release for 2 minutes maximum) between Mount Cougal Road and Len Dickfos Road

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 4pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 1 of 19

Streets affected: Currumbin Creek Road (half road closure with hold and release for 2 minutes maximum) between Braewood Road and Kianga Court

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 3pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 1 of 19

Streets affected: Nerang Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Short Street and Ferry Street

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9am – 2pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 1 of 5

Streets affected: Nielsens Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Birmingham Road and Hickey Way

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9am – 2:30pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 1 of 5

Streets affected: Crusader Way (lane, partial lane, shoulder and verge/footpath) between Weedons Road and Saxon Court

 

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9:30am 2:30pm

Reason: Loop cutting repairs

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 1 of 19

Streets affected: Rifle Range Road (half road closure with hold and release for 2 minutes maximum) between Waverley Drive and Hotham Creek Road

 

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am 2:30pm

Reason: Installation of a floodway sign

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 1 of 19

Streets affected: Old Coach Road (shoulder closure at roundabout) between Kingsmore Boulevarde and Pacific Motorway off-ramp

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Robina

Day 1 of 19

Streets affected: Robina Town Centre Drive (lane closure) between Investigator Drive and Highfield Drive

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 1 of 15

Streets affected: Nielsens Road (lane, bike lane, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Coelia Court and Hickey Way

Show more

Also affected: Murev Way, Pappas Way, Alzino Place and Greenbank Circuit

Start date: 3 June 2019

End date: 17 June 2019

Duration: 6pm – 6am

Reason: Road profiling, sealing and asphalt works

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 1 of 13

Streets affected: Albatross Avenue (verge/footpath, full road closure with detour) between Lavarack Road and Chairlift Avenue East

 

Show more

Start date: 3 June 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 1 of 28

Streets affected: Markeri Street (lane, bike lane, shoulder, verge/footpath, parking lane/bay closure) between Sunshine Boulevarde and Intrepid Drive

Show more

Start date: 3 June 2019

End date: 30 June 2019

Duration: 7pm – 5am

Reason: Road pavement investigation and testing

south

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 1 of 4

Streets affected: Anembo Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 3 June 2019

End date: 6 June 2019

Duration: 10pm (Sun - Wed)  / 11pm (Thu - Fri) – 6am

Reason: Relining a sewer pipeline

north

 
4 Jun - Tuesday
Water and sewerage

Unplanned - Water interruption - Labrador

12.00pm - 2.00pm

Streets affected: Ahern Street

Cause: Repair water main

W/O: 20515780

Notif: 1000577447

central

Water and sewerage

Unplanned - Water Interruption - Carrara

12.15pm - 1.15pm

Streets affected: Lakeview Drive

Cause: Repair water main

W/O: 20514780

Notif: 1000576286

central

Water and sewerage

Unplanned - Water Interruption - Runaway Bay

12.50pm - 1.50pm

Streets affected: Mt Hagen Road

Cause: Repair water leak

W/O: 20515610

Notif: 1000577262

north

Water and sewerage

Unplanned - Water interruption - Currumbin Waters

1.40pm - 2.10pm

Streets affected: Station Street

Cause: Repair water leak

W/O: 20514316

Notif: 1000575843

south

Water and sewerage

Unplanned - Water interruption - Labrador

1.50pm - 2.50pm

Streets affected: Ahern Street

Cause: Repair water hydrant

W/O: 20515780

Notif: 1000577447

central

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 204 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 188 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 142 of 200

Streets affected: Old Coach Road between Phaeton Street and Days Road; Days Road between Coomera Grand Drive and Old Coach Road (verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 12am – 11:59pm

Reason: Intersection Upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 142 of 200

Streets affected: Old Coach Road between Days Road and Coomera Grand Drive; also between Phaeton Street and Days Road (partial lane, bike lane and verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 124 of 150

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure)

Show more

Start date: 1 February 2019

End date: 30 June 2019

Duration: 6:30am – 2:30pm

Reason: Lane closure on approach to and including roundabout

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 123 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 110 of 136

Streets affected: Marine Parade (parking lane/bay closure with hold and release for 2 minutes maximum) between Ocean Street and Taylor Street

Show more

Start date: 15 February 2019

End date: 30 June 2019

Duration 1: 6:30am – 6pm (Hold and Release)

Duration 2: 12am - 11:59pm (car park)

Reason: To support the turning and entering of extra long vehicles into Quota Park for works activities

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 98 of 99

Streets affected: River Terrace (verge/footpath, full road closure with local access only) between Enderley Avenue and End of road

Show more

Start date: 27 February 2019

End date: 5 June 2019

Duration: 12am – 11:59pm

Reason: Construction of emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 96 of 120

Streets affected: Marine Parade (half road, partial verge/footpath closure with hold and release for 2 minutes maximum) between Burrows Street and Taylor Street

Show more

Start date: 1 March 2019

End date: 28 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate delivery vehicles and concrete pours

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 93 of 93

Streets affected: Old Burleigh Road (verge/footpath closure) between Fern Street and Wharf Road

Show more

Start date: 4 March 2019

End date: 4 June 2019

Duration: 12am – 11:59pm

Reason: For the placement of site sheds

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 93 of 93

Streets affected: Wharf Road (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 4 March 2019

End date: 4 June 2019

Duration: 6:30am – 10pm

Reason: To facilitate roadworks, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 91 of 93

Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street

Show more

Start date: 6 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries and ingress and egress of vehicles; also to facilitate large concrete pours

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 90 of 92

Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 7 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 90 of 123

Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 March 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 88 of 92

Streets affected: Gold Coast Highway (footpath closure) between Connor Street and West Street

Show more

Start date: 9 March 2019

End date: 8 June 2019

Duration: 12am – 11:59pm

Reason: Occupation of footpath for location of overhead gantry

south

Road closures

Planned - Temporary Road Closure - Southport

Day 86 of 93

Streets affected: 216 Queen Street (verge/footpath closure with hold and release for 2 minutes maximum) between Mal Burke Street and Ward Street

Show more

Start date: 11 March 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: Construction activities for the demolition of an existing dwelling plus the site establishment for building a new 4 storey unit development

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 82 of 108

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure on approach to and including roundabout)

Show more

Start date: 15 March 2019

End date: 30 June 2019

Duration: 6:30am – 5:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Robina

Day 80 of 175

CBUS Super Stadium - Events - NRL Season

Show more

Cheltenham Drive (Westbound) - CLOSED - local access only.

Robina Station Road - CLOSED - buses only.

Stadium Drive - CLOSED - pedestrians only.

Game Dates:

17 March 2019   /   12 April 2019   /   21 April 2019   /   18 May 2019   /   14 June 2019

29 June 2019   /   21 July 2019   /   27 July 2019   /   16 August 2019   /   7 September 2019

Duration: 7am – 11:30pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 78 of 93

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 19 March 2019

End date: 19 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 76 of 92

Streets affected: Twenty Forth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N

 

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: Midnight 11:59pm

Reason: Continuous partial verge/footpath closure for pedestrian safety

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 76 of 92

Streets affected: Cannes Avenue between Gold Coast Highway and Genoa Street; Genoa Street between Gold Coast Highway and Cannes Avenue (verge/footpath, partial lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 76 of 92

Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace North and Gold Coast Highway

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement of construction related vehicles

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 69 of 96

Streets affected: Frigo Court (metered parking / loading zone) between Karp Court and Crombie Avenue

 

Show more

Start date: 28 March 2019

End date: 1 July 2019

Duration: Midnight  11.59pm

Reason: Storage of building equipment (3 parking bays to be fenced off with temporary fencing)

north

Road closures

Planned - Temporary Road Closure - Miami

Day 65 of 91

Streets affected: Nobby Parade (full road closure local traffic access only) between Albion Avenue and Nundah Avenue

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert crossing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 65 of 91

Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site

north

Road closures

Planned - Temporary Road Closure - Miami

Day 65 of 91

Streets affected: Gold Coast Highway outside Miami High School (verge / footpath closure with hold and release for 2 minutes maximum) between Chairlift Avenue and Santa Monica Road

 

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am 3:30pm

Reason: Construction of a car park within Miami High School

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 62 of 92

Streets affected: Old Burleigh Road (half road, lane closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street

 

Show more

Start date: 4 April 2019

End date: 4 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate movement of construction vehicles

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 61 of 62

Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Date 1: 5 April 2019 to 18 April 2019

Date 2: 29 April 2019 to 5 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 58 of 61

Streets affected: Captain Cook Drive (lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Kendor Street and Demand Avenue

Show more

Start date: 8 April 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm (shoulder, verge/footpath closure)

Duration 2: 9am - 2:30pm (half road with hold and release)

Duration 3: 12am - 11:59pm (lane, verge/footpath closure with contraflow)

Reason: Works associated with a development including: bulk earthworks, civil works, roadworks and landscaping

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 58 of 91

Streets affected: Rutledge Street (parking bays closure) between Musgrave Street and Cul de sac

Show more

Start date: 8 April 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 54 of 62

Streets affected: Foxwell Road (partial verge/footpath closure with hold and release intermittent for 2 minutes maximum) between Oakey Creek Road and Shipper Drive

Show more

Start date: 12 April 2019

End date: 12 June 2019

Duration 1: 9am – 6:30pm (Hold and Release for Westbound Carriageway only)

Duration 2: 6:30am - 6:30pm (Partial Verge/Footpath closure)

Reason: Construction of Coomera State High School

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 52 of 92

Streets affected: Jefferson Lane (verge/footpath closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 14 April 2019

End date: 14 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 52 of 59

Streets affected: Arcadia Drive (half road closure with hold and release for 2 minutes maximum) between Himalaya Street and Canberra Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 52 of 76

Streets affected: Mervyn Thomas Drive (shoulder, verge/footpath closure) between Broadwater Avenue and Halcyon Way

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 52 of 76

Streets affected: Pendraat Parade (shoulder, verge/footpath closure) between Sickle Avenue and Pendraat Parade cul de sac

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 52 of 59

Streets affected: Jabiru Avenue (half road closure with hold and release for 2 minutes maximum) between Avocet Avenue and Fantail Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for stormwater relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 52 of 76

Streets affected: Halcyon Way (shoulder, verge/footpath, parking lane/bay closure) between Mervyn Thomas Drive and Crescent Avenue

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 52 of 59

Streets affected: Kalimna Drive (half road closure with hold and release for 2 minutes maximum) between Moana Park Avenue and End of road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 52 of 59

Streets affected: Allambi Avenue (half road closure with hold and release for 2 minutes maximum) between Naranga Avenue and Ilkinia Avenue

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 52 of 76

Streets affected: Marina Quays Boulevarde (shoulder, verge/footpath, parking lane/bay closure) between Sickle Avenue and Waters Close

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 52 of 59

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Kikori Crescent and Howard Street

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 52 of 59

Streets affected: Savoy Drive (half road closure with hold and release for 2 minutes maximum) between Allambi Avenue and Boongala Road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 51 of 92

Streets affected: Pearson Road (verge/footpath closure) between Kiralea Court and Darlington Drive

Show more

Start date: 15 April 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate implementation of heavy vehicle warning signs for construction site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 49 of 91

Streets affected: Elizabeth Avenue (verge/footpath closure) between Surf Parade and Old Burleigh Road

Show more

Start date: 17 April 2019

End date: 16 July 2019

Duration: 12am – 11:59pm

Reason: For the placement of an overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 48 of 62

Streets affected: Jefferson Lane (half road closure with hold and release for 2 minutes maximum) between Third Avenue and Laceys Lane

Show more

Start date: 18 April 2019

End date: 18 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 46 of 92

Streets affected: Surfers Paradise Boulevard (occasional hold and release for 2 minutes maximum of traffic and pedestrians) between Staghorn Avenue and Palm Avenue

 

Show more

Start date: 20 April 2019

End date: 20 July 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction vehicles to safely reverse from site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 43 of 91

Streets affected: Elizabeth Avenue (parking bay closure) between Old Burleigh Road and Surf Parade

Show more

Start date: 23 April 2019

End date: 22 July 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 42 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 24 April 2019

End date: 24 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

Day 42 of 53

Streets affected: Markeri Street between Caulfield Street and Greenwich Court and Greenwich Court between Markeri Street and cul-de-sac (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum)

 

 

Show more

Start date: 24 April 2019

End date: 15 June 2019

Duration: 9:00am 14:00pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Highland Park

Day 40 of 81

Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a boulder retaining wall

north

Road closures

Planned - Temporary Road Closure - Lower Beechmont

Day 40 of 81

Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a timber retaining wall

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 37 of 43

Streets affected: Cavill Avenue (partial footpath) between Orchid Avenue and The Esplanade

 

Show more

Start date: 29 April 2019

End date:  10 June 2019

Duration: Continuous

Reason: Installation of scaffolding to complete external works associated with the redevelopment of the Surfers Paradise Beer Garden

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 36 of 92

Streets affected: Gold Coast Highway (verge closure) between Thrower Drive and Hawaii Avenue

Show more

Start date: 30 April 2019

End date: 30 July 2019

Duration: 12am – 11:59pm

Reason: Occupation of verge for construction activities ensuring the footpath remains open at all times

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 35 of 84

Streets affected: Kerkin Road North (full road closure with detour and hold and release for 2 minutes maximum) between Yawalpah Road and Gainsborough Drive

 

Show more

Start date: 1 May 2019

End date: 23 July 2019

Duration: Midnight  11:59pm

Reason: Construction of a new roundabout and road widening

north

Road closures

Planned - Temporary Road Closure - Jacobs Well

Day 35 of 61

Streets affected: Helmore Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Harbour Boulevard and Garagul Street

 

Show more

Start date: 1 May 2019

End date: 30 June 2019

Duration: 6:30am 6:00pm

Reason: Road widening, pavement surfacing and line marking

north

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 34 of 58

Streets affected: Boundary Street (half road closure with hold and release for 2 minutes maximum) between Hayter Street and Jewel Street

 

Show more

Start date: 1 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm (traffic controllers onsite) and 5.00pm - 7.00am (portable traffic signals onsite)

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 34 of 124

Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street

 

Show more

Start date: 2 May 2019

End date: 2 September 2019

Duration: Midnight 11.59pm

Reason: Associated construction activity for Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 34 of 58

Streets affected: Karloo Street between Mawarra Street and Burra Street (half road closure with hold and release for 2 minutes maximum) and Mawarra Street between Stanhill Drive and Thomas Drive (partial lane, parking bays, verge/footpath)

 

Show more

Start date: 2 May 2019

End date: 28 June 2019

Duration: Midnight 11.59pm

Reason: Street scaping project to the Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 33 of 59

Streets affected: Pacific Parade (verge/footpath closure) between Johnston Street and Archer Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: Continuous

Reason: Footpath closure for occupation of site office and construction materials

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 33 of 59

Streets affected: Pacific Parade (half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 31 of 62

Streets affected: Albatross Avenue (bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Seashell Avenue and Heron Avenue

 

Show more

Start date: 5 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Daily closures to facilitate deliveries to site

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 29 of 32

Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade

 

Show more

Start date: 7 May 2019

End date: 7 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 29 of 61

Streets affected: Markeri Street, Australia Avenue, Queensland Avenue, Gold Coast Highway, Jubilee Avenue (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 7 May 2019

End date: 6 July 2019

Duration: 6:30am 6:30pm

Reason: NBN / telecommunication installation

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 28 of 41

Streets affected: Old Coach Road (lane, bike lane, shoulder closure) between Low Drive and Marsh Street

Show more

Start date: 7 May 2019

End date: 17 June 2019

Duration: 7pm – 5am

Reason: Undertake Falling Weight Deflectometer (FWD) and Ground Penetration Radar (GPR) Testing under rolling traffic control conditions

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 28 of 93

Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate site sheds and material storage for development site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 28 of 31

Streets affected: Fourth Avenue (full road closure local traffic access only) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone in designated parking bays

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 28 of 31

Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 28 of 31

Streets affected: Eady Avenue (partial lane, verge/footpath closure) between T E Peters Drive and No Through Road

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate trenching works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 28 of 93

Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Construction Works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 28 of 93

Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 28 of 93

Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Detour for one way of traffic to facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 27 of 32

Streets affected: Marina Quays Boulevard (shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Crescent Avenue and Mervyn Thomas Drive

 

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am 6:00pm

Reason: Sewer main works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 27 of 92

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate vehicle movement in and out of construction site

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 27 of 32

Streets affected: Peninsular Drive (verge/footpath closure) between Holborow Close and Watson Esplanade

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am – 6pm

Reason: Facilitate relocation of overhead power cables beneath the ground

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 27 of 92

Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street

Show more

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate material and equipment deliveries plus various construction activities

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 26 of 62

Streets affected: Baker Avenue (verge/footpath closure) between Frank Street and Proud Street

Show more

Start date: 10 May 2019

End date: 10 July 2019

Duration: 12am – 11:59pm

Reason: To facilitate new development site

north

Road closures

Planned - Temporary Road Closure - Robina

Day 25 of 31

Streets affected: Scottsdale Drive between Christine Avenue and Laurel Oak Drive; Laurel Oak Drive between Scottsdale Drive and Mountain Ash Circuit (parking lane/bay closure with hold and release for 2 minutes maximum)

Show more

Start date: 11 May 2019

End date: 10 June 2019

Duration: 6:30am – 6:30pm

Reason: To assist large construction vehicles in and out of development site

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 23 of 60

Streets affected: Gold Coast Highway (loading zone closure) between Connor Street and West Street

Show more

Start date: 13 May 2019

End date: 11 July 2019

Duration: 6:30am – 6:30pm

Reason: The Loading Zone will be used by pedestrians to bypass a footpath closure

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 23 of 66

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) between Nineteenth Avenue and Fifteenth Avenue

Start date: 13 May 2019

End date: 17 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries of building materials / scaffolding to the construction site

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 21 of 32

Streets affected: Old Pacific Highway (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Fig Tree Court and Leo Graham Way

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 9:00am 2:30pm

Reason: Closure to facilitate water main crossing requiring trenching

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 20 of 31

Streets affected: Birmingham Road (lane, bike lane and verge/footpath closure) between Emanual College Drive and Nielsens Road

 

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Pavement investigation services

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 20 of 93

Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road

 

 

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: Midnight 11:59pm

Reason: Continuous footpath closure to facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 20 of 93

Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: 6:30am – 6:30pm

Reason: Full road closure at end of road to facilitate construction activities when required for safety

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 19 of 61

Streets affected: Helensvale Road (verge/footpath, partial lane closure) between Hannaford Place and Siganto Drive

Show more

Also affected: Woodside Place, Grey Gum Street, Shepparton Road, Michigan Drive, Parkside Drive, John Dalley Drive

Start date: 17 May 2019

End date: 16 July 2019

Duration: 6:30am – 6:30pm

Reason: NBN Works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 19 of 32

Streets affected: Stanmore Road (lane, bike lane verge/footpath closure with hold and release for 2 minutes maximum) between Paterson Road and Quarry Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 19 of 32

Streets affected: Enkleman Street (lane, bike lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanmore Road and Taperoo Court

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 19 of 32

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 9:00am 2:30pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 18 of 31

Streets affected: Fourth Avenue (verge/footpath closure) between Third Avenue and Fifth Avenue

 

 

Show more

Start date: 18 May 2019

End date: 17 June 2019

Duration: Midnight 11.59pm

Reason: To facilitate a safe work place for the construction site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 16 of 20

Streets affected: Alec Avenue between Peter Parade and Hillcrest Parade; Kiers Road between Karbunya Street and Kallay Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 20 May 2019

End date: 8 June 2019

Duration: 6:30am – 5:30pm

Reason: Kerb and channelling on all four corners of Alec Avenue and Kiers Road intersection

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 16 of 40

Streets affected: Railway Parade (lane, bike lane, shoulder, verge/footpath, with hold and release for 2 minutes maximum) between Nerang-Broadbeach Road and Grenfell Street

Show more

Start date: 20 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm

Reason: Water main replacement program

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 15 of 18

Streets affected: Sandy Creek Road (half road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Start date: 20 May 2019

End date: 7 June 2019

Duration: 6:30pm 6:00am

Reason: Road profiling and asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 15 of 31

Streets affected: Quarry Road (rolling blockade) between Rossmanns Road and Stapylton Jacobs Well Road

 

Show more

Start date: 20 May 2019

End date: 20 June 2019

Duration: 7:00pm 5:00am

Reason: To facilitate falling weight deflectometer and ground penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 15 of 46

Streets affected: Bondi Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and end of road

 

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 15 of 46

Streets affected: Bondi Avenue (parking lane/bays closure) between Gold Coast Highway and End of road

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 15 of 92

Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway

Show more

Start date: 21 May 2019

End date: 20 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Miami

Day 15 of 32

Streets affected: Avalon Parade (parking lane closure) between Pacific Avenue and Paradise Avenue

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate sewer connection to existing manhole

south

Road closures

Planned - Temporary Road Closure - Tugan

Day 15 of 32

Streets affected: Singh Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Wyberba Street and end of street

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: Connect communications to existing pole

south

Road closures

Planned - Temporary Road Closure - Kingsholme

Day 15 of 15

Streets affected: Upper Ormeau Road (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Thompson Road and Landsdowne Drive

 

Show more

Start date: 21 May 2019

End date: 4 June 2019

Duration: 6:30am 6:30pm (half road closure with hold and release)

Duration:  Midnight - 11:59pm (verge/footpath closure)

Reason: Driveway construction works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 13 of 28

Streets affected: Mattocks Road (rolling lane closure) between Treeview Drive North and Bushtree Court

 

Show more

Start date: 22 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: Undertake falling weight deflectometer and ground penetration radar testing

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 13 of 16

Streets affected: Shipper Drive (shoulder, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Ford Road and End of road

Show more

Start date: 23 May 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm - Shoulder and verge/footpath closure

Duration 2: 9am - 2:30pm - Half road closure with hold and release

Reason: Installation of temporary dredge delivery pipe

north

Road closures

Planned - Temporary Road Closure - Molendinar

Day 12 of 17

Streets affected: Olsen Avenue (shoulder, verge/footpath closure) between Crestwood Drive and Smith Street

 

Show more

Start date: 23 May 2019

End date: 9June 2019

Duration: 800pm 5:00am

Reason: Removal and replacement of crossover

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 11 of 26

Streets affected: Christine Avenue (Rolling lane closure) between Bridgewater Drive and Varsity College car park

 

Show more

Start date: 24 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: To undertake falling weight deflectometer and ground testing penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 11 of 30

Streets affected: Cavill Avenue (partial lane closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevarde and Ferny Avenue

Show more

Start date: 24 May 2019

End date: 23 June 2019

Duration: 8pm – 5am

Reason: Falling weight deflectometer and ground penetrating radar investigations

north

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 11 of 32

Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive

Show more

Start date: 25 May 2019

End date: 25 June 2019

Duration: 6:30am – 6:30pm

Reason: Large deliveries, concrete pours, trucks and construction vehicles entering and exiting the site

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 9 of 12

Streets affected: Somerset Drive (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Jarema Drive and Bonogin Road

Show more

Also affected: Somerset Drive between Gemvale Road and Swanton Drive; Gemvale Road between Jarema Drive and Alvey Court

Start date: 26 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closures - Surfers Paradise

Day 9 of 93

Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 27 May 2019

End date: 27 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate road works, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Pacific Pines

Day 9 of 15

Streets affected: Midway Terrace (half road closure with hold and release for 2 minutes maximum) between Hillary Circuit and Santa Isobel Boulevard

 

 

 

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 6:30am 6:30pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 9 of 32

Streets affected: Cassia Street between Bayview Street and Joseph Street; Joseph Street between Poinsettia Avenue and Howard Street (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works, including inspections, cleaning and reline installations

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 9 of 33

Streets affected: Finnegan Way (verge/footpath, parking lane/bay closure) between Ritz Drive and Chromata Lane

Show more

Start date: 27 May 2019

End date: 28 June 2019

Duration: 7am – 2pm

Reason: Installation of a weathproof shelter over the footpath between the Coomera Rivers State School boundary and the 'Stop Drop and Go' parking/drop off lane

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 9 of 15

Streets affected: White Street (lane, partial lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Price Street and Nerang Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 9 of 15

Streets affected: Brighton Parade (bike lane, half road closure with hold and release for 2 minutes maximum) between Como Crescent and Como Crescent

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 9 of 12

Streets affected: Surf Parade (verge/footpath closure with hold and release for 2 minutes maximum) between Victoria Avenue and Queensland Avenue

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7am – 5pm

Reason: Removing coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 9 of 13

Streets affected: Jefferson Lane (full road closure with local access for residents with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Dates: 27 - 31 May 2019; 3 - 8 June 2019

Duration: 7am – 5pm

Reason: Concrete pours for paths, stairs and crossovers including landscaping supplies

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 9 of 32

Streets affected: Marina Quays Boulevarde (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Waters Close and Crescent Avenue

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 7am – 5pm

Reason: Gas main extension

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 9 of 17

Streets affected: Reserve Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Rose Valley Drive and Greenleaf Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9am – 2:30pm

Reason: Modify existing guardrail

north

Road closures

Planned - Temporary Road Closure - Robina

Day 9 of 17

Streets affected: Cottesloe Drive (parking lane closure) between Grenaside Court and Pyrmont Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9:30am – 3pm

Reason: Removal of two existing guardrails

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 8 of 11

Streets affected: Highland Way (bike lane, half road closure with hold and release for 2 minutes maximum) between Skyridge Drive and Rose Valley Drive

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 8 of 14

Streets affected: Griffith Street (half road closure with hold and release for 2 minutes maximum) between Warner Street and Dixon Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 11:59pm (Sun - Thu only) – 5am (Mon - Fri only)

Reason: Replacement of street light on a centre traffic island

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 8 of 15

Streets affected: Banyula Drive between Evers Street and Coolibah Road; Matilda Road between End of road and Banyula Drive (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 28 May 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: To repair and replace broken guardrail

north

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 8

Streets affected: Bay Street (half road closure with hold and release for 2 minutes maximum) between High Street and Rawlins Street

Show more

Start date: 28 May 2019

End date: 4 June 2019

Duration: 6:30am – 6:30pm

Reason: Placement of crane to facilitate pre-cast concrete installation

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 8 of 32

Streets affected: Sunshine Boulevarde (lane, verge/footpath closure) between Surfers Avenue and Gretel Drive

Show more

Start date: 28 May 2019

End date: 28 June 2019

Duration: 9am – 1pm

Reason: To facilitate safe ingress and egress of construction vehicles

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 7 of 64

Streets affected: Markeri Street (lane closure) between Sunshine Boulevarde and Avanti Street

Show more

Start date: 29 May 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 7 of 32

Streets affected: Bienvenue Drive (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Clives Circuit and Itong Place

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 6:30am – 1pm

Reason: Excavate and remove existing water meter; install new meter and concrete lid

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 7 of 32

Streets affected: Peachey Road (lane, shoulder, verge/footpath closure with hold and release for 2 minutes maximum) between Caswell Court and Oppermann Drive

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 7am – 7pm

Reason: Installation of drainage line from flow meter to gully

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 7 of 73

Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road

Show more

Start date: 29 May 2019

End date: 9 August 2019

Duration: 7am – 5pm

Reason: New recycled water investigation - potholing stage

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 6 of 13

Streets affected: Gilston Road (lane closure) between Winderadeen Court and New Street

Show more

Start date: 29 May 2019

End date: 11 Jun 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 9

Streets affected: Queen Street between Mal Burke Street and Ward Street; Mal Burke Street between Queen Street and Pohlman Street (full road closure with detour)

Show more

Start date: 29 May 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: To facilitate sewer connection under road way for new development

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 5 of 10

Streets affected: Philippine Parade (lane, verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 31 May 2019

End date: 9 June 2019

Duration: 12am – 11:59pm

Reason: Building a manhole for sewer connection

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 5 of 57

Streets affected: Eggersdorf Road (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Arthur Way and Stewart's Road

Show more

Start date: 31 May 2019

End date: 26 July 2019

Duration: 12am – 11:59pm

Reason: Road duplication/upgrading of Eggersdorf Road - Phase 3

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 5 of 32

Streets affected: Nelson Avenue (shoulder, verge/footpath closure) between Pool Street and Sheehan Drive

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 5 of 32

Streets affected: Oxley Drive (shoulder, verge/footpath closure) between Crescent Avenue and Sunbird Place

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 15

Streets affected: McLaren Road (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Castagno Avenue and Fillmore Street

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration 1: 9:30am – 2:30pm (Mon - Fri)

Duration 2: 6:30am - 6:30pm (Saturdays)

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 5 of 15

Streets affected: Reserve Road between Lawson Drive and Coldcrest Drive; Old Coach Road between Reserve Road and Baileys Mountain Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9am – 2:30pm

Reason: Install coloured surfacing at roundabout and approaches

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 4 of 14

Streets affected: Benowa Road between St Kevins Avenue and Allchurch Street; Mediterranean Drive between Mary Ann Street and Benowa Road (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9pm – 6am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 4 of 61

Streets affected: Salzburg Road (full road closure with detours) between Barry Street and Yawalpah Road

Show more

Also affected: Yawalpah Road (verge/footpath closure with hold and release for 2 minutes maximum) between Attenborough Boulevarde and Old Pacific Motorway

Start date: 1 June 2019

End date: 31 July 2019

Duration 1: 12am – 11:59pm

Duration 2: 9am - 2:30pm (Yawalpah Road)

Reason: Stage 2 (1 June - 12 July 2019)   and   Stage 3 (13 July - 31 July 2019) works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 4 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 4 of 8

Streets affected: Bayview Street (bike lane, shoulder closure with hold and release for 2 minutes maximum) between Simbai Street and Lae Drive

Show more

Start date: 1 June 2019

End date: 8 June 2019

Duration 1: 6:30am – 6:30pm (Saturdays)

Duration 2: 9:30am - 2:30pm 

Reason: To facilitate overhead works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 4 of 92

Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street

Show more

Start date: 1 June 2019

End date: 31 August 2019

Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Bonogin

Day 4 of 30

Streets affected: Bonogin Road (verge/footpath, half road, parking lane/bay, bike lane, shoulder closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Canopy Drive

Show more

Also affected: Hardys Road (slip lane, shoulder closure) between Bonogin Road and Glenmore Drive

Also affected: Carrington Road (verge/footpath, shoulder closure) between Bonogin Road and Tahilia Court

Start date: 1 June 2019

End date: 30 June 2019

Duration: 7am – 5pm

Reason: Water main renewal works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 4 of 6

Streets affected: Ferny Avenue (lane, partial lane, shoulder, metered parking/loading zone, full road closure with hold and release for 2 minutes maximum) between Beach Road and Gold Coast Highway

Show more

Start date: 1 June 2019

End date: 6 June 2019

Duration: 6pm – 6am

Reason: Road rehabilitation mill and fill

north

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 31

Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone, half road closure) between Bay Street and Windmill Street

Show more

Start date: 2 June 2019

End date: 2 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction deliveries only when required

north

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 6

Streets affected: Wilson Street between Jimmieson Avenue and Musgrave Avenue; Neville Avenue between Chuter Avenue and Musgrave Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 2 June 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: Water and Waste sewer relining

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 2 of 12

Streets affected: Executive Drive (half road closure with hold and release for 2 minutes maximum) between Burleigh Connection Road and Bermuda Street

Show more

Also affected: Classic Way between Executive Drive and Bermuda Street

Start date: 3 June 2019

End date: 14 June 2019

Duration: 5am – 6:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure - Elanora

Day 2 of 43

Streets affected: Nineteenth Avenue (half road, parking lane/bay, bike lane closure with hold and release for 2 minutes maximum) between Angelica Street and Saffron Street

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6am – 6pm

Reason: Profiling, sealing and asphalt works

south

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 2 of 43

Streets affected: Lae Drive between Oxley Drive and Bayview Street; Moralla Avenue between Sports Drive and Folkstone Place (parking lane/bay, bike lane, lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: Remedial works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 2 of 5

Streets affected: Gold Coast Highway (parking bay closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone - 4x parking bays (#8107 to #8110)

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 2 of 59

Streets affected: Gold Coast Highway (verge/footpath closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: To install signs and complete works

south

Road closures

Planned - Temporary Road Closure - Miami

Day 2 of 24

Streets affected: Santa Monica Road between Chairlift Avenue East and Riviera Road; Paradise Avenue between Pacific Avenue and Bardon Avenue (verge/footpath, parking lane/bay closure)

Show more

Start date: 3 June 2019

End date: 26 June 2019

Duration: 6:30am – 6:30pm

Reason: Installation of CoGC conduit and fibre optic cable for the Digital City Expansion Project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 2 of 15

Streets affected: Main Beach Parade between Beulah Lane and MacArthur Parade; John Kemp Street between Pacific Street and Main Beach Parade (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 17 June 2019

Duration: 7am – 5pm

Reason: Install coloured works

north

Mosquito spraying

Planned - Pest Animal Trapping - Pimpama River Conservation Area

Day 2 of 12

Areas affected: Pimpama River Conservation Area

Pest animal trapping will be carried out within Pimpama River Conservation Area from 7.00am Monday 3rd June 2019 to 11.59pm Friday 14th June 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 5

Streets affected: Falconer Street (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Nerang Street and Ward Street

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 7am – 2pm

Reason: To facilitate water main road crossing cut dig and reinstate

north

Road closures

Planned - Temporary Road Closure - Tallebudgera Valley

Day 2 of 19

Streets affected: Tallebudgera Creek Road (half road closure with hold and release for 2 minutes maximum) between Mount Cougal Road and Len Dickfos Road

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 4pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 2 of 19

Streets affected: Currumbin Creek Road (half road closure with hold and release for 2 minutes maximum) between Braewood Road and Kianga Court

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 3pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 2 of 19

Streets affected: Nerang Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Short Street and Ferry Street

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9am – 2pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 2 of 5

Streets affected: Nielsens Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Birmingham Road and Hickey Way

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9am – 2:30pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 2 of 5

Streets affected: Crusader Way (lane, partial lane, shoulder and verge/footpath) between Weedons Road and Saxon Court

 

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9:30am 2:30pm

Reason: Loop cutting repairs

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 2 of 19

Streets affected: Rifle Range Road (half road closure with hold and release for 2 minutes maximum) between Waverley Drive and Hotham Creek Road

 

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am 2:30pm

Reason: Installation of a floodway sign

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 2 of 19

Streets affected: Old Coach Road (shoulder closure at roundabout) between Kingsmore Boulevarde and Pacific Motorway off-ramp

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Robina

Day 2 of 19

Streets affected: Robina Town Centre Drive (lane closure) between Investigator Drive and Highfield Drive

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 2 of 15

Streets affected: Nielsens Road (lane, bike lane, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Coelia Court and Hickey Way

Show more

Also affected: Murev Way, Pappas Way, Alzino Place and Greenbank Circuit

Start date: 3 June 2019

End date: 17 June 2019

Duration: 6pm – 6am

Reason: Road profiling, sealing and asphalt works

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 2 of 13

Streets affected: Albatross Avenue (verge/footpath, full road closure with detour) between Lavarack Road and Chairlift Avenue East

 

Show more

Start date: 3 June 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 2 of 28

Streets affected: Markeri Street (lane, bike lane, shoulder, verge/footpath, parking lane/bay closure) between Sunshine Boulevarde and Intrepid Drive

Show more

Start date: 3 June 2019

End date: 30 June 2019

Duration: 7pm – 5am

Reason: Road pavement investigation and testing

south

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 2 of 4

Streets affected: Anembo Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 3 June 2019

End date: 6 June 2019

Duration: 10pm (Sun - Wed)  / 11pm (Thu - Fri) – 6am

Reason: Relining a sewer pipeline

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 1 of 93

Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)

Show more

Start date: 4 June 2019

End date: 4 September 2019

Duration: 12am – 11:59pm

Reason: To facilitate placement of overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 1 of 16

Streets affected: First Avenue (full road closure) between Beach Parade and Old Burleigh Road

Show more

Date 1: 4 June 2019

Date 2: 19 June 2019

Duration: 7:30am – 4pm

Reason: Energex works

south

Water and sewerage

Planned - Water interruption - Luscombe and Yatala

9.00am - 3.00pm

Streets affected: Harts Road, Stanmore Road, Luscombe and Stanmore Road Yatala

Cause: Replacing hydrants

Ispot/Pathway: 73503315

W/O: 60005356

Notif: 1000573903

north

Water and sewerage

Planned - Water interruption - Mermaid Beach

Day 1 of 2

Streets affected: Gold Coast Highway, Surf Parade, Alexandra Avenue, Mermaid Avenue

Cause: Maintenance work on water main

Ispot/Pathway:

W/O: 60006021

Notif: 1000522973

Show more

Start time and date: 10.00pm, 4  June  2019

End time and date: 3.00am, 5 Julne 2019

south

 
5 Jun - Wednesday
Water and sewerage

Unplanned - Water interruption - Mermaid Beach

7.00am - 10.00am

Streets affected: Streets in the Mermaid Beach and Gold Coast Highway

Cause: Loss of water and low pressure - Gold Coast Water crews in the area investigating problem

W/O: 60006021

Notif: 1000522973

south

Water and sewerage

Unplanned - Water interruption - Mermaid Beach

10.00am - 11.30am

Streets affected: Seashell Avenue between Seagull Avenue and Albatross Avenue

Cause: Water hydrant will be discharging into gutter, to flush water main after shutdown

W/O: 60006021

Notif: 1000522973

south

Water and sewerage

Unplanned - Water Interruption - Burleigh Heads

11.00am - 2.00pm

Streets affected: Skyline Terrace between Tanjenong Place and West Burleigh Road

Cause: Repair water main

W/O: 20516148

Notif: 1000577867

south

Water and sewerage

Unplanned - Water interruption - Robina

2.35pm - 3.35pm

Streets affected: Lancewood Circuit, Eugenia Circuit

Cause: Repair water main

W/O: 20514447

Notif: 1000575940

south

Water and sewerage

Unplanned - Water Interruption - Reedy Creek

10.50pm - 11.50pm

Streets affected: Bridgman Drive, Ridgevista Court, Heulan Court

Cause: Water main repairs

W/O: 20514241

Notif: 1000575710

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 205 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 189 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 143 of 200

Streets affected: Old Coach Road between Phaeton Street and Days Road; Days Road between Coomera Grand Drive and Old Coach Road (verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 12am – 11:59pm

Reason: Intersection Upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 143 of 200

Streets affected: Old Coach Road between Days Road and Coomera Grand Drive; also between Phaeton Street and Days Road (partial lane, bike lane and verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 125 of 150

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure)

Show more

Start date: 1 February 2019

End date: 30 June 2019

Duration: 6:30am – 2:30pm

Reason: Lane closure on approach to and including roundabout

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 124 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 111 of 136

Streets affected: Marine Parade (parking lane/bay closure with hold and release for 2 minutes maximum) between Ocean Street and Taylor Street

Show more

Start date: 15 February 2019

End date: 30 June 2019

Duration 1: 6:30am – 6pm (Hold and Release)

Duration 2: 12am - 11:59pm (car park)

Reason: To support the turning and entering of extra long vehicles into Quota Park for works activities

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 99 of 99

Streets affected: River Terrace (verge/footpath, full road closure with local access only) between Enderley Avenue and End of road

Show more

Start date: 27 February 2019

End date: 5 June 2019

Duration: 12am – 11:59pm

Reason: Construction of emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 97 of 120

Streets affected: Marine Parade (half road, partial verge/footpath closure with hold and release for 2 minutes maximum) between Burrows Street and Taylor Street

Show more

Start date: 1 March 2019

End date: 28 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate delivery vehicles and concrete pours

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 92 of 93

Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street

Show more

Start date: 6 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries and ingress and egress of vehicles; also to facilitate large concrete pours

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 91 of 92

Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 7 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 91 of 123

Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 March 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 89 of 92

Streets affected: Gold Coast Highway (footpath closure) between Connor Street and West Street

Show more

Start date: 9 March 2019

End date: 8 June 2019

Duration: 12am – 11:59pm

Reason: Occupation of footpath for location of overhead gantry

south

Road closures

Planned - Temporary Road Closure - Southport

Day 87 of 93

Streets affected: 216 Queen Street (verge/footpath closure with hold and release for 2 minutes maximum) between Mal Burke Street and Ward Street

Show more

Start date: 11 March 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: Construction activities for the demolition of an existing dwelling plus the site establishment for building a new 4 storey unit development

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 83 of 108

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure on approach to and including roundabout)

Show more

Start date: 15 March 2019

End date: 30 June 2019

Duration: 6:30am – 5:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Robina

Day 81 of 175

CBUS Super Stadium - Events - NRL Season

Show more

Cheltenham Drive (Westbound) - CLOSED - local access only.

Robina Station Road - CLOSED - buses only.

Stadium Drive - CLOSED - pedestrians only.

Game Dates:

17 March 2019   /   12 April 2019   /   21 April 2019   /   18 May 2019   /   14 June 2019

29 June 2019   /   21 July 2019   /   27 July 2019   /   16 August 2019   /   7 September 2019

Duration: 7am – 11:30pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 79 of 93

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 19 March 2019

End date: 19 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 77 of 92

Streets affected: Twenty Forth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N

 

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: Midnight 11:59pm

Reason: Continuous partial verge/footpath closure for pedestrian safety

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 77 of 92

Streets affected: Cannes Avenue between Gold Coast Highway and Genoa Street; Genoa Street between Gold Coast Highway and Cannes Avenue (verge/footpath, partial lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 77 of 92

Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace North and Gold Coast Highway

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement of construction related vehicles

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 70 of 96

Streets affected: Frigo Court (metered parking / loading zone) between Karp Court and Crombie Avenue

 

Show more

Start date: 28 March 2019

End date: 1 July 2019

Duration: Midnight  11.59pm

Reason: Storage of building equipment (3 parking bays to be fenced off with temporary fencing)

north

Road closures

Planned - Temporary Road Closure - Miami

Day 66 of 91

Streets affected: Nobby Parade (full road closure local traffic access only) between Albion Avenue and Nundah Avenue

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert crossing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 66 of 91

Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site

north

Road closures

Planned - Temporary Road Closure - Miami

Day 66 of 91

Streets affected: Gold Coast Highway outside Miami High School (verge / footpath closure with hold and release for 2 minutes maximum) between Chairlift Avenue and Santa Monica Road

 

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am 3:30pm

Reason: Construction of a car park within Miami High School

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 63 of 92

Streets affected: Old Burleigh Road (half road, lane closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street

 

Show more

Start date: 4 April 2019

End date: 4 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate movement of construction vehicles

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 62 of 62

Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Date 1: 5 April 2019 to 18 April 2019

Date 2: 29 April 2019 to 5 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material

south

Road closures

Planned - Temporary Road Closure - Arundel

Day 59 of 61

Streets affected: Captain Cook Drive (lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Kendor Street and Demand Avenue

Show more

Start date: 8 April 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm (shoulder, verge/footpath closure)

Duration 2: 9am - 2:30pm (half road with hold and release)

Duration 3: 12am - 11:59pm (lane, verge/footpath closure with contraflow)

Reason: Works associated with a development including: bulk earthworks, civil works, roadworks and landscaping

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 59 of 91

Streets affected: Rutledge Street (parking bays closure) between Musgrave Street and Cul de sac

Show more

Start date: 8 April 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 55 of 62

Streets affected: Foxwell Road (partial verge/footpath closure with hold and release intermittent for 2 minutes maximum) between Oakey Creek Road and Shipper Drive

Show more

Start date: 12 April 2019

End date: 12 June 2019

Duration 1: 9am – 6:30pm (Hold and Release for Westbound Carriageway only)

Duration 2: 6:30am - 6:30pm (Partial Verge/Footpath closure)

Reason: Construction of Coomera State High School

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 53 of 92

Streets affected: Jefferson Lane (verge/footpath closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 14 April 2019

End date: 14 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 53 of 59

Streets affected: Arcadia Drive (half road closure with hold and release for 2 minutes maximum) between Himalaya Street and Canberra Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 53 of 76

Streets affected: Mervyn Thomas Drive (shoulder, verge/footpath closure) between Broadwater Avenue and Halcyon Way

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 53 of 76

Streets affected: Pendraat Parade (shoulder, verge/footpath closure) between Sickle Avenue and Pendraat Parade cul de sac

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 53 of 59

Streets affected: Jabiru Avenue (half road closure with hold and release for 2 minutes maximum) between Avocet Avenue and Fantail Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for stormwater relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 53 of 76

Streets affected: Halcyon Way (shoulder, verge/footpath, parking lane/bay closure) between Mervyn Thomas Drive and Crescent Avenue

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 53 of 59

Streets affected: Kalimna Drive (half road closure with hold and release for 2 minutes maximum) between Moana Park Avenue and End of road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 53 of 59

Streets affected: Allambi Avenue (half road closure with hold and release for 2 minutes maximum) between Naranga Avenue and Ilkinia Avenue

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 53 of 76

Streets affected: Marina Quays Boulevarde (shoulder, verge/footpath, parking lane/bay closure) between Sickle Avenue and Waters Close

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 53 of 59

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Kikori Crescent and Howard Street

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 53 of 59

Streets affected: Savoy Drive (half road closure with hold and release for 2 minutes maximum) between Allambi Avenue and Boongala Road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 52 of 92

Streets affected: Pearson Road (verge/footpath closure) between Kiralea Court and Darlington Drive

Show more

Start date: 15 April 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate implementation of heavy vehicle warning signs for construction site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 50 of 91

Streets affected: Elizabeth Avenue (verge/footpath closure) between Surf Parade and Old Burleigh Road

Show more

Start date: 17 April 2019

End date: 16 July 2019

Duration: 12am – 11:59pm

Reason: For the placement of an overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 49 of 62

Streets affected: Jefferson Lane (half road closure with hold and release for 2 minutes maximum) between Third Avenue and Laceys Lane

Show more

Start date: 18 April 2019

End date: 18 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 47 of 92

Streets affected: Surfers Paradise Boulevard (occasional hold and release for 2 minutes maximum of traffic and pedestrians) between Staghorn Avenue and Palm Avenue

 

Show more

Start date: 20 April 2019

End date: 20 July 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction vehicles to safely reverse from site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 44 of 91

Streets affected: Elizabeth Avenue (parking bay closure) between Old Burleigh Road and Surf Parade

Show more

Start date: 23 April 2019

End date: 22 July 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 43 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 24 April 2019

End date: 24 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

Day 43 of 53

Streets affected: Markeri Street between Caulfield Street and Greenwich Court and Greenwich Court between Markeri Street and cul-de-sac (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum)

 

 

Show more

Start date: 24 April 2019

End date: 15 June 2019

Duration: 9:00am 14:00pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Highland Park

Day 41 of 81

Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a boulder retaining wall

north

Road closures

Planned - Temporary Road Closure - Lower Beechmont

Day 41 of 81

Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a timber retaining wall

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 38 of 43

Streets affected: Cavill Avenue (partial footpath) between Orchid Avenue and The Esplanade

 

Show more

Start date: 29 April 2019

End date:  10 June 2019

Duration: Continuous

Reason: Installation of scaffolding to complete external works associated with the redevelopment of the Surfers Paradise Beer Garden

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 37 of 92

Streets affected: Gold Coast Highway (verge closure) between Thrower Drive and Hawaii Avenue

Show more

Start date: 30 April 2019

End date: 30 July 2019

Duration: 12am – 11:59pm

Reason: Occupation of verge for construction activities ensuring the footpath remains open at all times

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 36 of 84

Streets affected: Kerkin Road North (full road closure with detour and hold and release for 2 minutes maximum) between Yawalpah Road and Gainsborough Drive

 

Show more

Start date: 1 May 2019

End date: 23 July 2019

Duration: Midnight  11:59pm

Reason: Construction of a new roundabout and road widening

north

Road closures

Planned - Temporary Road Closure - Jacobs Well

Day 36 of 61

Streets affected: Helmore Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Harbour Boulevard and Garagul Street

 

Show more

Start date: 1 May 2019

End date: 30 June 2019

Duration: 6:30am 6:00pm

Reason: Road widening, pavement surfacing and line marking

north

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 35 of 58

Streets affected: Boundary Street (half road closure with hold and release for 2 minutes maximum) between Hayter Street and Jewel Street

 

Show more

Start date: 1 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm (traffic controllers onsite) and 5.00pm - 7.00am (portable traffic signals onsite)

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 35 of 124

Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street

 

Show more

Start date: 2 May 2019

End date: 2 September 2019

Duration: Midnight 11.59pm

Reason: Associated construction activity for Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 35 of 58

Streets affected: Karloo Street between Mawarra Street and Burra Street (half road closure with hold and release for 2 minutes maximum) and Mawarra Street between Stanhill Drive and Thomas Drive (partial lane, parking bays, verge/footpath)

 

Show more

Start date: 2 May 2019

End date: 28 June 2019

Duration: Midnight 11.59pm

Reason: Street scaping project to the Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 34 of 59

Streets affected: Pacific Parade (verge/footpath closure) between Johnston Street and Archer Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: Continuous

Reason: Footpath closure for occupation of site office and construction materials

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 34 of 59

Streets affected: Pacific Parade (half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 32 of 62

Streets affected: Albatross Avenue (bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Seashell Avenue and Heron Avenue

 

Show more

Start date: 5 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Daily closures to facilitate deliveries to site

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 30 of 32

Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade

 

Show more

Start date: 7 May 2019

End date: 7 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 30 of 61

Streets affected: Markeri Street, Australia Avenue, Queensland Avenue, Gold Coast Highway, Jubilee Avenue (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 7 May 2019

End date: 6 July 2019

Duration: 6:30am 6:30pm

Reason: NBN / telecommunication installation

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 29 of 41

Streets affected: Old Coach Road (lane, bike lane, shoulder closure) between Low Drive and Marsh Street

Show more

Start date: 7 May 2019

End date: 17 June 2019

Duration: 7pm – 5am

Reason: Undertake Falling Weight Deflectometer (FWD) and Ground Penetration Radar (GPR) Testing under rolling traffic control conditions

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 29 of 93

Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate site sheds and material storage for development site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 29 of 31

Streets affected: Fourth Avenue (full road closure local traffic access only) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone in designated parking bays

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 29 of 31

Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 29 of 31

Streets affected: Eady Avenue (partial lane, verge/footpath closure) between T E Peters Drive and No Through Road

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate trenching works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 29 of 93

Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Construction Works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 29 of 93

Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 29 of 93

Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Detour for one way of traffic to facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 28 of 32

Streets affected: Marina Quays Boulevard (shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Crescent Avenue and Mervyn Thomas Drive

 

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am 6:00pm

Reason: Sewer main works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 28 of 92

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate vehicle movement in and out of construction site

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 28 of 32

Streets affected: Peninsular Drive (verge/footpath closure) between Holborow Close and Watson Esplanade

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am – 6pm

Reason: Facilitate relocation of overhead power cables beneath the ground

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 28 of 92

Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street

Show more

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate material and equipment deliveries plus various construction activities

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 27 of 62

Streets affected: Baker Avenue (verge/footpath closure) between Frank Street and Proud Street

Show more

Start date: 10 May 2019

End date: 10 July 2019

Duration: 12am – 11:59pm

Reason: To facilitate new development site

north

Road closures

Planned - Temporary Road Closure - Robina

Day 26 of 31

Streets affected: Scottsdale Drive between Christine Avenue and Laurel Oak Drive; Laurel Oak Drive between Scottsdale Drive and Mountain Ash Circuit (parking lane/bay closure with hold and release for 2 minutes maximum)

Show more

Start date: 11 May 2019

End date: 10 June 2019

Duration: 6:30am – 6:30pm

Reason: To assist large construction vehicles in and out of development site

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 24 of 60

Streets affected: Gold Coast Highway (loading zone closure) between Connor Street and West Street

Show more

Start date: 13 May 2019

End date: 11 July 2019

Duration: 6:30am – 6:30pm

Reason: The Loading Zone will be used by pedestrians to bypass a footpath closure

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 24 of 66

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) between Nineteenth Avenue and Fifteenth Avenue

Start date: 13 May 2019

End date: 17 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries of building materials / scaffolding to the construction site

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 22 of 32

Streets affected: Old Pacific Highway (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Fig Tree Court and Leo Graham Way

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 9:00am 2:30pm

Reason: Closure to facilitate water main crossing requiring trenching

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 21 of 31

Streets affected: Birmingham Road (lane, bike lane and verge/footpath closure) between Emanual College Drive and Nielsens Road

 

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Pavement investigation services

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 21 of 93

Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road

 

 

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: Midnight 11:59pm

Reason: Continuous footpath closure to facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 21 of 93

Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: 6:30am – 6:30pm

Reason: Full road closure at end of road to facilitate construction activities when required for safety

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 20 of 61

Streets affected: Helensvale Road (verge/footpath, partial lane closure) between Hannaford Place and Siganto Drive

Show more

Also affected: Woodside Place, Grey Gum Street, Shepparton Road, Michigan Drive, Parkside Drive, John Dalley Drive

Start date: 17 May 2019

End date: 16 July 2019

Duration: 6:30am – 6:30pm

Reason: NBN Works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 20 of 32

Streets affected: Stanmore Road (lane, bike lane verge/footpath closure with hold and release for 2 minutes maximum) between Paterson Road and Quarry Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 20 of 32

Streets affected: Enkleman Street (lane, bike lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanmore Road and Taperoo Court

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 20 of 32

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 9:00am 2:30pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 19 of 31

Streets affected: Fourth Avenue (verge/footpath closure) between Third Avenue and Fifth Avenue

 

 

Show more

Start date: 18 May 2019

End date: 17 June 2019

Duration: Midnight 11.59pm

Reason: To facilitate a safe work place for the construction site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 17 of 20

Streets affected: Alec Avenue between Peter Parade and Hillcrest Parade; Kiers Road between Karbunya Street and Kallay Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 20 May 2019

End date: 8 June 2019

Duration: 6:30am – 5:30pm

Reason: Kerb and channelling on all four corners of Alec Avenue and Kiers Road intersection

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 17 of 40

Streets affected: Railway Parade (lane, bike lane, shoulder, verge/footpath, with hold and release for 2 minutes maximum) between Nerang-Broadbeach Road and Grenfell Street

Show more

Start date: 20 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm

Reason: Water main replacement program

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 16 of 18

Streets affected: Sandy Creek Road (half road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Start date: 20 May 2019

End date: 7 June 2019

Duration: 6:30pm 6:00am

Reason: Road profiling and asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 16 of 31

Streets affected: Quarry Road (rolling blockade) between Rossmanns Road and Stapylton Jacobs Well Road

 

Show more

Start date: 20 May 2019

End date: 20 June 2019

Duration: 7:00pm 5:00am

Reason: To facilitate falling weight deflectometer and ground penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 16 of 46

Streets affected: Bondi Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and end of road

 

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 16 of 46

Streets affected: Bondi Avenue (parking lane/bays closure) between Gold Coast Highway and End of road

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 16 of 92

Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway

Show more

Start date: 21 May 2019

End date: 20 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Miami

Day 16 of 32

Streets affected: Avalon Parade (parking lane closure) between Pacific Avenue and Paradise Avenue

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate sewer connection to existing manhole

south

Road closures

Planned - Temporary Road Closure - Tugan

Day 16 of 32

Streets affected: Singh Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Wyberba Street and end of street

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: Connect communications to existing pole

south

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 14 of 28

Streets affected: Mattocks Road (rolling lane closure) between Treeview Drive North and Bushtree Court

 

Show more

Start date: 22 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: Undertake falling weight deflectometer and ground penetration radar testing

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 14 of 16

Streets affected: Shipper Drive (shoulder, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Ford Road and End of road

Show more

Start date: 23 May 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm - Shoulder and verge/footpath closure

Duration 2: 9am - 2:30pm - Half road closure with hold and release

Reason: Installation of temporary dredge delivery pipe

north

Road closures

Planned - Temporary Road Closure - Molendinar

Day 13 of 17

Streets affected: Olsen Avenue (shoulder, verge/footpath closure) between Crestwood Drive and Smith Street

 

Show more

Start date: 23 May 2019

End date: 9June 2019

Duration: 800pm 5:00am

Reason: Removal and replacement of crossover

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 12 of 26

Streets affected: Christine Avenue (Rolling lane closure) between Bridgewater Drive and Varsity College car park

 

Show more

Start date: 24 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: To undertake falling weight deflectometer and ground testing penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 12 of 30

Streets affected: Cavill Avenue (partial lane closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevarde and Ferny Avenue

Show more

Start date: 24 May 2019

End date: 23 June 2019

Duration: 8pm – 5am

Reason: Falling weight deflectometer and ground penetrating radar investigations

north

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 12 of 32

Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive

Show more

Start date: 25 May 2019

End date: 25 June 2019

Duration: 6:30am – 6:30pm

Reason: Large deliveries, concrete pours, trucks and construction vehicles entering and exiting the site

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 10 of 12

Streets affected: Somerset Drive (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Jarema Drive and Bonogin Road

Show more

Also affected: Somerset Drive between Gemvale Road and Swanton Drive; Gemvale Road between Jarema Drive and Alvey Court

Start date: 26 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closures - Surfers Paradise

Day 10 of 93

Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 27 May 2019

End date: 27 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate road works, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Pacific Pines

Day 10 of 15

Streets affected: Midway Terrace (half road closure with hold and release for 2 minutes maximum) between Hillary Circuit and Santa Isobel Boulevard

 

 

 

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 6:30am 6:30pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 10 of 32

Streets affected: Cassia Street between Bayview Street and Joseph Street; Joseph Street between Poinsettia Avenue and Howard Street (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works, including inspections, cleaning and reline installations

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 10 of 33

Streets affected: Finnegan Way (verge/footpath, parking lane/bay closure) between Ritz Drive and Chromata Lane

Show more

Start date: 27 May 2019

End date: 28 June 2019

Duration: 7am – 2pm

Reason: Installation of a weathproof shelter over the footpath between the Coomera Rivers State School boundary and the 'Stop Drop and Go' parking/drop off lane

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 10 of 15

Streets affected: White Street (lane, partial lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Price Street and Nerang Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 10 of 15

Streets affected: Brighton Parade (bike lane, half road closure with hold and release for 2 minutes maximum) between Como Crescent and Como Crescent

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 10 of 12

Streets affected: Surf Parade (verge/footpath closure with hold and release for 2 minutes maximum) between Victoria Avenue and Queensland Avenue

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7am – 5pm

Reason: Removing coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 10 of 13

Streets affected: Jefferson Lane (full road closure with local access for residents with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Dates: 27 - 31 May 2019; 3 - 8 June 2019

Duration: 7am – 5pm

Reason: Concrete pours for paths, stairs and crossovers including landscaping supplies

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 10 of 32

Streets affected: Marina Quays Boulevarde (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Waters Close and Crescent Avenue

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 7am – 5pm

Reason: Gas main extension

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 10 of 17

Streets affected: Reserve Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Rose Valley Drive and Greenleaf Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9am – 2:30pm

Reason: Modify existing guardrail

north

Road closures

Planned - Temporary Road Closure - Robina

Day 10 of 17

Streets affected: Cottesloe Drive (parking lane closure) between Grenaside Court and Pyrmont Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9:30am – 3pm

Reason: Removal of two existing guardrails

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 9 of 11

Streets affected: Highland Way (bike lane, half road closure with hold and release for 2 minutes maximum) between Skyridge Drive and Rose Valley Drive

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 9 of 14

Streets affected: Griffith Street (half road closure with hold and release for 2 minutes maximum) between Warner Street and Dixon Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 11:59pm (Sun - Thu only) – 5am (Mon - Fri only)

Reason: Replacement of street light on a centre traffic island

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 9 of 15

Streets affected: Banyula Drive between Evers Street and Coolibah Road; Matilda Road between End of road and Banyula Drive (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 28 May 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: To repair and replace broken guardrail

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 9 of 32

Streets affected: Sunshine Boulevarde (lane, verge/footpath closure) between Surfers Avenue and Gretel Drive

Show more

Start date: 28 May 2019

End date: 28 June 2019

Duration: 9am – 1pm

Reason: To facilitate safe ingress and egress of construction vehicles

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 8 of 64

Streets affected: Markeri Street (lane closure) between Sunshine Boulevarde and Avanti Street

Show more

Start date: 29 May 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 8 of 32

Streets affected: Bienvenue Drive (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Clives Circuit and Itong Place

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 6:30am – 1pm

Reason: Excavate and remove existing water meter; install new meter and concrete lid

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 8 of 32

Streets affected: Peachey Road (lane, shoulder, verge/footpath closure with hold and release for 2 minutes maximum) between Caswell Court and Oppermann Drive

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 7am – 7pm

Reason: Installation of drainage line from flow meter to gully

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 8 of 73

Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road

Show more

Start date: 29 May 2019

End date: 9 August 2019

Duration: 7am – 5pm

Reason: New recycled water investigation - potholing stage

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 7 of 13

Streets affected: Gilston Road (lane closure) between Winderadeen Court and New Street

Show more

Start date: 29 May 2019

End date: 11 Jun 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 7 of 9

Streets affected: Queen Street between Mal Burke Street and Ward Street; Mal Burke Street between Queen Street and Pohlman Street (full road closure with detour)

Show more

Start date: 29 May 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: To facilitate sewer connection under road way for new development

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 7 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 6 of 10

Streets affected: Philippine Parade (lane, verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 31 May 2019

End date: 9 June 2019

Duration: 12am – 11:59pm

Reason: Building a manhole for sewer connection

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 6 of 57

Streets affected: Eggersdorf Road (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Arthur Way and Stewart's Road

Show more

Start date: 31 May 2019

End date: 26 July 2019

Duration: 12am – 11:59pm

Reason: Road duplication/upgrading of Eggersdorf Road - Phase 3

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 6 of 32

Streets affected: Nelson Avenue (shoulder, verge/footpath closure) between Pool Street and Sheehan Drive

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 6 of 32

Streets affected: Oxley Drive (shoulder, verge/footpath closure) between Crescent Avenue and Sunbird Place

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 6 of 15

Streets affected: McLaren Road (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Castagno Avenue and Fillmore Street

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration 1: 9:30am – 2:30pm (Mon - Fri)

Duration 2: 6:30am - 6:30pm (Saturdays)

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 6 of 15

Streets affected: Reserve Road between Lawson Drive and Coldcrest Drive; Old Coach Road between Reserve Road and Baileys Mountain Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9am – 2:30pm

Reason: Install coloured surfacing at roundabout and approaches

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 5 of 14

Streets affected: Benowa Road between St Kevins Avenue and Allchurch Street; Mediterranean Drive between Mary Ann Street and Benowa Road (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9pm – 6am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 5 of 61

Streets affected: Salzburg Road (full road closure with detours) between Barry Street and Yawalpah Road

Show more

Also affected: Yawalpah Road (verge/footpath closure with hold and release for 2 minutes maximum) between Attenborough Boulevarde and Old Pacific Motorway

Start date: 1 June 2019

End date: 31 July 2019

Duration 1: 12am – 11:59pm

Duration 2: 9am - 2:30pm (Yawalpah Road)

Reason: Stage 2 (1 June - 12 July 2019)   and   Stage 3 (13 July - 31 July 2019) works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 5 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 5 of 8

Streets affected: Bayview Street (bike lane, shoulder closure with hold and release for 2 minutes maximum) between Simbai Street and Lae Drive

Show more

Start date: 1 June 2019

End date: 8 June 2019

Duration 1: 6:30am – 6:30pm (Saturdays)

Duration 2: 9:30am - 2:30pm 

Reason: To facilitate overhead works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 5 of 92

Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street

Show more

Start date: 1 June 2019

End date: 31 August 2019

Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Bonogin

Day 5 of 30

Streets affected: Bonogin Road (verge/footpath, half road, parking lane/bay, bike lane, shoulder closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Canopy Drive

Show more

Also affected: Hardys Road (slip lane, shoulder closure) between Bonogin Road and Glenmore Drive

Also affected: Carrington Road (verge/footpath, shoulder closure) between Bonogin Road and Tahilia Court

Start date: 1 June 2019

End date: 30 June 2019

Duration: 7am – 5pm

Reason: Water main renewal works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 5 of 6

Streets affected: Ferny Avenue (lane, partial lane, shoulder, metered parking/loading zone, full road closure with hold and release for 2 minutes maximum) between Beach Road and Gold Coast Highway

Show more

Start date: 1 June 2019

End date: 6 June 2019

Duration: 6pm – 6am

Reason: Road rehabilitation mill and fill

north

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 31

Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone, half road closure) between Bay Street and Windmill Street

Show more

Start date: 2 June 2019

End date: 2 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction deliveries only when required

north

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 6

Streets affected: Wilson Street between Jimmieson Avenue and Musgrave Avenue; Neville Avenue between Chuter Avenue and Musgrave Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 2 June 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: Water and Waste sewer relining

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 3 of 12

Streets affected: Executive Drive (half road closure with hold and release for 2 minutes maximum) between Burleigh Connection Road and Bermuda Street

Show more

Also affected: Classic Way between Executive Drive and Bermuda Street

Start date: 3 June 2019

End date: 14 June 2019

Duration: 5am – 6:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure - Elanora

Day 3 of 43

Streets affected: Nineteenth Avenue (half road, parking lane/bay, bike lane closure with hold and release for 2 minutes maximum) between Angelica Street and Saffron Street

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6am – 6pm

Reason: Profiling, sealing and asphalt works

south

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 3 of 43

Streets affected: Lae Drive between Oxley Drive and Bayview Street; Moralla Avenue between Sports Drive and Folkstone Place (parking lane/bay, bike lane, lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: Remedial works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 3 of 5

Streets affected: Gold Coast Highway (parking bay closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone - 4x parking bays (#8107 to #8110)

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 3 of 59

Streets affected: Gold Coast Highway (verge/footpath closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: To install signs and complete works

south

Road closures

Planned - Temporary Road Closure - Miami

Day 3 of 24

Streets affected: Santa Monica Road between Chairlift Avenue East and Riviera Road; Paradise Avenue between Pacific Avenue and Bardon Avenue (verge/footpath, parking lane/bay closure)

Show more

Start date: 3 June 2019

End date: 26 June 2019

Duration: 6:30am – 6:30pm

Reason: Installation of CoGC conduit and fibre optic cable for the Digital City Expansion Project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 3 of 15

Streets affected: Main Beach Parade between Beulah Lane and MacArthur Parade; John Kemp Street between Pacific Street and Main Beach Parade (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 17 June 2019

Duration: 7am – 5pm

Reason: Install coloured works

north

Mosquito spraying

Planned - Pest Animal Trapping - Pimpama River Conservation Area

Day 3 of 12

Areas affected: Pimpama River Conservation Area

Pest animal trapping will be carried out within Pimpama River Conservation Area from 7.00am Monday 3rd June 2019 to 11.59pm Friday 14th June 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Southport

Day 3 of 5

Streets affected: Falconer Street (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Nerang Street and Ward Street

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 7am – 2pm

Reason: To facilitate water main road crossing cut dig and reinstate

north

Road closures

Planned - Temporary Road Closure - Tallebudgera Valley

Day 3 of 19

Streets affected: Tallebudgera Creek Road (half road closure with hold and release for 2 minutes maximum) between Mount Cougal Road and Len Dickfos Road

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 4pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 3 of 19

Streets affected: Currumbin Creek Road (half road closure with hold and release for 2 minutes maximum) between Braewood Road and Kianga Court

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 3pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 3 of 19

Streets affected: Nerang Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Short Street and Ferry Street

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9am – 2pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 3 of 5

Streets affected: Nielsens Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Birmingham Road and Hickey Way

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9am – 2:30pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 3 of 5

Streets affected: Crusader Way (lane, partial lane, shoulder and verge/footpath) between Weedons Road and Saxon Court

 

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9:30am 2:30pm

Reason: Loop cutting repairs

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 3 of 19

Streets affected: Rifle Range Road (half road closure with hold and release for 2 minutes maximum) between Waverley Drive and Hotham Creek Road

 

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am 2:30pm

Reason: Installation of a floodway sign

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 3 of 19

Streets affected: Old Coach Road (shoulder closure at roundabout) between Kingsmore Boulevarde and Pacific Motorway off-ramp

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Robina

Day 3 of 19

Streets affected: Robina Town Centre Drive (lane closure) between Investigator Drive and Highfield Drive

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 3 of 15

Streets affected: Nielsens Road (lane, bike lane, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Coelia Court and Hickey Way

Show more

Also affected: Murev Way, Pappas Way, Alzino Place and Greenbank Circuit

Start date: 3 June 2019

End date: 17 June 2019

Duration: 6pm – 6am

Reason: Road profiling, sealing and asphalt works

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 3 of 13

Streets affected: Albatross Avenue (verge/footpath, full road closure with detour) between Lavarack Road and Chairlift Avenue East

 

Show more

Start date: 3 June 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 3 of 28

Streets affected: Markeri Street (lane, bike lane, shoulder, verge/footpath, parking lane/bay closure) between Sunshine Boulevarde and Intrepid Drive

Show more

Start date: 3 June 2019

End date: 30 June 2019

Duration: 7pm – 5am

Reason: Road pavement investigation and testing

south

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 3 of 4

Streets affected: Anembo Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 3 June 2019

End date: 6 June 2019

Duration: 10pm (Sun - Wed)  / 11pm (Thu - Fri) – 6am

Reason: Relining a sewer pipeline

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 2 of 93

Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)

Show more

Start date: 4 June 2019

End date: 4 September 2019

Duration: 12am – 11:59pm

Reason: To facilitate placement of overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 2 of 16

Streets affected: First Avenue (full road closure) between Beach Parade and Old Burleigh Road

Show more

Date 1: 4 June 2019

Date 2: 19 June 2019

Duration: 7:30am – 4pm

Reason: Energex works

south

Water and sewerage

Planned - Water interruption - Mermaid Beach

Day 2 of 2

Streets affected: Gold Coast Highway, Surf Parade, Alexandra Avenue, Mermaid Avenue

Cause: Maintenance work on water main

Ispot/Pathway:

W/O: 60006021

Notif: 1000522973

Show more

Start time and date: 10.00pm, 4  June  2019

End time and date: 3.00am, 5 Julne 2019

south

Road closures

Planned - Temporary Road Closure - Southport

Day 1 of 123

Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue

 

Show more

Start date: 5 June 2019

End date: 5 October 2019

Duration: Midnight 11:59pm

Reason: Lateral shift of traffic for protection of culvert asset

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 1 of 8

Streets affected: Hargraves Road (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Reindeer Street and Bambi Close with Roe Street, Fawn Street and Fallow Street also affected

 

Show more

Start date: 5 June 2019

End date: 12 June 2019

Duration: 6:30am 3:30pm

Reason: Placement of pram ramps and island ramp through traffic island

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 20

Streets affected: Cavill Avenue (part footpath closure) on the corner of Cavill Avenue and Orchid Avenue

 

Show more

Start date: 5 June 2019

End date: 24 June 2019

Duration: 7:00am 6:30pm

Reason: Removal of existing shopfront and fitout of new retail store

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 1 of 31

Streets affected: Cunningham Drive North (bike lane, shoulder, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum) between Dixon Drive and William Boulevard

 

Show more

Start date: 5 June 2019

End date: 5 July 2019

Duration: 7:00am 5:00pm (verge/footpath closures)

Duration: 9.00am - 2.30pm (bike lane, shoulder, parking lane bays)

Reason: Extension of gas main

north

Water and sewerage

Planned - Water interruption - Ormeau

9.00am - 2.00pm

Streets affected: Renford Court, Phipps Place, Vaughan Drive,

Cause: Replacing hydrants

Ispot/Pathway: 73503315

W/O: 60005356

Notif: 1000573905

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 1 of 3

Streets affected: Benowa Road (bike lane and half road closure with hold and release for 2 minutes maximum) between St Kevins Avenue and Allchurch Street

Show more

Start date: 5 June 2019

End date: 7 June 2019

Duration: 9:00am 2:30pm

Reason: Borehole works

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 1 of 26

Streets affected: Christine Avenue (lane, verge/footpath, parking lane/bay closure) between South Bay Drive and Regensberg Close

Show more

Start date: 5 June 2019

End date: 30 June 2019

Duration: 9:30am – 2:30pm

Reason: Remove and reconstruct the pedestrian ramps and various lengths of footpath on each of the four corners of the intersection

south

Water and sewerage

Planned - Water interruption - Benowa

10.00am - 2.00pm

Streets affected: Kincardine Drive, White Heather Court, Roderick Court, Edinburgh Road

Cause: Replacing hydrants

Ispot/Pathway: 73533970

W/O: 30063150

Notif: 1000574908

central

Water and sewerage

Planned - Water interruption - Benowa

10.00am - 2.00pm

Streets affected: Edinburgh Road, Charolais Crescent, Rebholz Drive, Chantilly Close, Cheval Court

Cause: Replacements of hydrants

Ispot/Pathway: 73533964

W/O: 30063146

Notif: 1000574888

central

Water and sewerage

Planned - Water Interruption - Burleigh Heads

Day 1 of 2

Streets affected: Ocean Street, Park Avenue, Gold Coast Highway

Cause: Maintenance work on water main

Ispot/Pathway:

W/O: 60006556

Notif: 1000568543

Show more

Start time and date: 10.00pm, 5  June  2019

End time and date: 3.00am,  6  June  2019

south

 
6 Jun - Thursday
Water and sewerage

Unplanned - Water Interruption - Surfers Paradise

9.20am - 11.20am

Streets affected: Stanhill Drive, Anembo Street

Cause: Repair water main

W/O: 20516366

Notif: 1000578128

central

Water and sewerage

Unplanned - Water Interruption - Carrara

12.30pm - 1.30pm

Streets affected: Dawnann Court

Cause: Repair water leak

W/O: 20515961

Notif: 1000578226

central

Water and sewerage

Unplanned - Water Interruption - Currumbin Waters

Day 1 of 2

Streets affected: Bienvenue Drive

Cause: Repair water main

W/O: 20516629

Notif: 1000578412

Show more

Start time and date: 9.45pm, 6 June 2019

End time and date: 12.45am, 7 June 2019

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 206 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 190 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 144 of 200

Streets affected: Old Coach Road between Phaeton Street and Days Road; Days Road between Coomera Grand Drive and Old Coach Road (verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 12am – 11:59pm

Reason: Intersection Upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 144 of 200

Streets affected: Old Coach Road between Days Road and Coomera Grand Drive; also between Phaeton Street and Days Road (partial lane, bike lane and verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 126 of 150

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure)

Show more

Start date: 1 February 2019

End date: 30 June 2019

Duration: 6:30am – 2:30pm

Reason: Lane closure on approach to and including roundabout

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 125 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 112 of 136

Streets affected: Marine Parade (parking lane/bay closure with hold and release for 2 minutes maximum) between Ocean Street and Taylor Street

Show more

Start date: 15 February 2019

End date: 30 June 2019

Duration 1: 6:30am – 6pm (Hold and Release)

Duration 2: 12am - 11:59pm (car park)

Reason: To support the turning and entering of extra long vehicles into Quota Park for works activities

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 98 of 120

Streets affected: Marine Parade (half road, partial verge/footpath closure with hold and release for 2 minutes maximum) between Burrows Street and Taylor Street

Show more

Start date: 1 March 2019

End date: 28 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate delivery vehicles and concrete pours

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 93 of 93

Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street

Show more

Start date: 6 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate deliveries and ingress and egress of vehicles; also to facilitate large concrete pours

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 92 of 92

Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 7 March 2019

End date: 6 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 92 of 123

Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 March 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 90 of 92

Streets affected: Gold Coast Highway (footpath closure) between Connor Street and West Street

Show more

Start date: 9 March 2019

End date: 8 June 2019

Duration: 12am – 11:59pm

Reason: Occupation of footpath for location of overhead gantry

south

Road closures

Planned - Temporary Road Closure - Southport

Day 88 of 93

Streets affected: 216 Queen Street (verge/footpath closure with hold and release for 2 minutes maximum) between Mal Burke Street and Ward Street

Show more

Start date: 11 March 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: Construction activities for the demolition of an existing dwelling plus the site establishment for building a new 4 storey unit development

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 84 of 108

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure on approach to and including roundabout)

Show more

Start date: 15 March 2019

End date: 30 June 2019

Duration: 6:30am – 5:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Robina

Day 82 of 175

CBUS Super Stadium - Events - NRL Season

Show more

Cheltenham Drive (Westbound) - CLOSED - local access only.

Robina Station Road - CLOSED - buses only.

Stadium Drive - CLOSED - pedestrians only.

Game Dates:

17 March 2019   /   12 April 2019   /   21 April 2019   /   18 May 2019   /   14 June 2019

29 June 2019   /   21 July 2019   /   27 July 2019   /   16 August 2019   /   7 September 2019

Duration: 7am – 11:30pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 80 of 93

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 19 March 2019

End date: 19 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 78 of 92

Streets affected: Twenty Forth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N

 

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: Midnight 11:59pm

Reason: Continuous partial verge/footpath closure for pedestrian safety

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 78 of 92

Streets affected: Cannes Avenue between Gold Coast Highway and Genoa Street; Genoa Street between Gold Coast Highway and Cannes Avenue (verge/footpath, partial lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 78 of 92

Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace North and Gold Coast Highway

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement of construction related vehicles

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 71 of 96

Streets affected: Frigo Court (metered parking / loading zone) between Karp Court and Crombie Avenue

 

Show more

Start date: 28 March 2019

End date: 1 July 2019

Duration: Midnight  11.59pm

Reason: Storage of building equipment (3 parking bays to be fenced off with temporary fencing)

north

Road closures

Planned - Temporary Road Closure - Miami

Day 67 of 91

Streets affected: Nobby Parade (full road closure local traffic access only) between Albion Avenue and Nundah Avenue

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert crossing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 67 of 91

Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site

north

Road closures

Planned - Temporary Road Closure - Miami

Day 67 of 91

Streets affected: Gold Coast Highway outside Miami High School (verge / footpath closure with hold and release for 2 minutes maximum) between Chairlift Avenue and Santa Monica Road

 

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am 3:30pm

Reason: Construction of a car park within Miami High School

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 64 of 92

Streets affected: Old Burleigh Road (half road, lane closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street

 

Show more

Start date: 4 April 2019

End date: 4 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate movement of construction vehicles

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 60 of 61

Streets affected: Captain Cook Drive (lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Kendor Street and Demand Avenue

Show more

Start date: 8 April 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm (shoulder, verge/footpath closure)

Duration 2: 9am - 2:30pm (half road with hold and release)

Duration 3: 12am - 11:59pm (lane, verge/footpath closure with contraflow)

Reason: Works associated with a development including: bulk earthworks, civil works, roadworks and landscaping

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 60 of 91

Streets affected: Rutledge Street (parking bays closure) between Musgrave Street and Cul de sac

Show more

Start date: 8 April 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 56 of 62

Streets affected: Foxwell Road (partial verge/footpath closure with hold and release intermittent for 2 minutes maximum) between Oakey Creek Road and Shipper Drive

Show more

Start date: 12 April 2019

End date: 12 June 2019

Duration 1: 9am – 6:30pm (Hold and Release for Westbound Carriageway only)

Duration 2: 6:30am - 6:30pm (Partial Verge/Footpath closure)

Reason: Construction of Coomera State High School

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 54 of 92

Streets affected: Jefferson Lane (verge/footpath closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 14 April 2019

End date: 14 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 54 of 59

Streets affected: Arcadia Drive (half road closure with hold and release for 2 minutes maximum) between Himalaya Street and Canberra Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 54 of 76

Streets affected: Mervyn Thomas Drive (shoulder, verge/footpath closure) between Broadwater Avenue and Halcyon Way

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 54 of 76

Streets affected: Pendraat Parade (shoulder, verge/footpath closure) between Sickle Avenue and Pendraat Parade cul de sac

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 54 of 59

Streets affected: Jabiru Avenue (half road closure with hold and release for 2 minutes maximum) between Avocet Avenue and Fantail Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for stormwater relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 54 of 76

Streets affected: Halcyon Way (shoulder, verge/footpath, parking lane/bay closure) between Mervyn Thomas Drive and Crescent Avenue

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 54 of 59

Streets affected: Kalimna Drive (half road closure with hold and release for 2 minutes maximum) between Moana Park Avenue and End of road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 54 of 59

Streets affected: Allambi Avenue (half road closure with hold and release for 2 minutes maximum) between Naranga Avenue and Ilkinia Avenue

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 54 of 76

Streets affected: Marina Quays Boulevarde (shoulder, verge/footpath, parking lane/bay closure) between Sickle Avenue and Waters Close

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 54 of 59

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Kikori Crescent and Howard Street

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 54 of 59

Streets affected: Savoy Drive (half road closure with hold and release for 2 minutes maximum) between Allambi Avenue and Boongala Road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 53 of 92

Streets affected: Pearson Road (verge/footpath closure) between Kiralea Court and Darlington Drive

Show more

Start date: 15 April 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate implementation of heavy vehicle warning signs for construction site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 51 of 91

Streets affected: Elizabeth Avenue (verge/footpath closure) between Surf Parade and Old Burleigh Road

Show more

Start date: 17 April 2019

End date: 16 July 2019

Duration: 12am – 11:59pm

Reason: For the placement of an overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 50 of 62

Streets affected: Jefferson Lane (half road closure with hold and release for 2 minutes maximum) between Third Avenue and Laceys Lane

Show more

Start date: 18 April 2019

End date: 18 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 48 of 92

Streets affected: Surfers Paradise Boulevard (occasional hold and release for 2 minutes maximum of traffic and pedestrians) between Staghorn Avenue and Palm Avenue

 

Show more

Start date: 20 April 2019

End date: 20 July 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction vehicles to safely reverse from site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 45 of 91

Streets affected: Elizabeth Avenue (parking bay closure) between Old Burleigh Road and Surf Parade

Show more

Start date: 23 April 2019

End date: 22 July 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 44 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 24 April 2019

End date: 24 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

Day 44 of 53

Streets affected: Markeri Street between Caulfield Street and Greenwich Court and Greenwich Court between Markeri Street and cul-de-sac (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum)

 

 

Show more

Start date: 24 April 2019

End date: 15 June 2019

Duration: 9:00am 14:00pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Highland Park

Day 42 of 81

Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a boulder retaining wall

north

Road closures

Planned - Temporary Road Closure - Lower Beechmont

Day 42 of 81

Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a timber retaining wall

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 39 of 43

Streets affected: Cavill Avenue (partial footpath) between Orchid Avenue and The Esplanade

 

Show more

Start date: 29 April 2019

End date:  10 June 2019

Duration: Continuous

Reason: Installation of scaffolding to complete external works associated with the redevelopment of the Surfers Paradise Beer Garden

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 38 of 92

Streets affected: Gold Coast Highway (verge closure) between Thrower Drive and Hawaii Avenue

Show more

Start date: 30 April 2019

End date: 30 July 2019

Duration: 12am – 11:59pm

Reason: Occupation of verge for construction activities ensuring the footpath remains open at all times

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 37 of 84

Streets affected: Kerkin Road North (full road closure with detour and hold and release for 2 minutes maximum) between Yawalpah Road and Gainsborough Drive

 

Show more

Start date: 1 May 2019

End date: 23 July 2019

Duration: Midnight  11:59pm

Reason: Construction of a new roundabout and road widening

north

Road closures

Planned - Temporary Road Closure - Jacobs Well

Day 37 of 61

Streets affected: Helmore Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Harbour Boulevard and Garagul Street

 

Show more

Start date: 1 May 2019

End date: 30 June 2019

Duration: 6:30am 6:00pm

Reason: Road widening, pavement surfacing and line marking

north

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 36 of 58

Streets affected: Boundary Street (half road closure with hold and release for 2 minutes maximum) between Hayter Street and Jewel Street

 

Show more

Start date: 1 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm (traffic controllers onsite) and 5.00pm - 7.00am (portable traffic signals onsite)

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 36 of 124

Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street

 

Show more

Start date: 2 May 2019

End date: 2 September 2019

Duration: Midnight 11.59pm

Reason: Associated construction activity for Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 36 of 58

Streets affected: Karloo Street between Mawarra Street and Burra Street (half road closure with hold and release for 2 minutes maximum) and Mawarra Street between Stanhill Drive and Thomas Drive (partial lane, parking bays, verge/footpath)

 

Show more

Start date: 2 May 2019

End date: 28 June 2019

Duration: Midnight 11.59pm

Reason: Street scaping project to the Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 35 of 59

Streets affected: Pacific Parade (verge/footpath closure) between Johnston Street and Archer Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: Continuous

Reason: Footpath closure for occupation of site office and construction materials

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 35 of 59

Streets affected: Pacific Parade (half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 33 of 62

Streets affected: Albatross Avenue (bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Seashell Avenue and Heron Avenue

 

Show more

Start date: 5 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Daily closures to facilitate deliveries to site

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 31 of 32

Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade

 

Show more

Start date: 7 May 2019

End date: 7 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 31 of 61

Streets affected: Markeri Street, Australia Avenue, Queensland Avenue, Gold Coast Highway, Jubilee Avenue (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 7 May 2019

End date: 6 July 2019

Duration: 6:30am 6:30pm

Reason: NBN / telecommunication installation

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 30 of 41

Streets affected: Old Coach Road (lane, bike lane, shoulder closure) between Low Drive and Marsh Street

Show more

Start date: 7 May 2019

End date: 17 June 2019

Duration: 7pm – 5am

Reason: Undertake Falling Weight Deflectometer (FWD) and Ground Penetration Radar (GPR) Testing under rolling traffic control conditions

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 30 of 93

Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate site sheds and material storage for development site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 30 of 31

Streets affected: Fourth Avenue (full road closure local traffic access only) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone in designated parking bays

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 30 of 31

Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 30 of 31

Streets affected: Eady Avenue (partial lane, verge/footpath closure) between T E Peters Drive and No Through Road

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate trenching works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 30 of 93

Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Construction Works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 30 of 93

Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 30 of 93

Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Detour for one way of traffic to facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 29 of 32

Streets affected: Marina Quays Boulevard (shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Crescent Avenue and Mervyn Thomas Drive

 

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am 6:00pm

Reason: Sewer main works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 29 of 92

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate vehicle movement in and out of construction site

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 29 of 32

Streets affected: Peninsular Drive (verge/footpath closure) between Holborow Close and Watson Esplanade

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am – 6pm

Reason: Facilitate relocation of overhead power cables beneath the ground

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 29 of 92

Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street

Show more

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate material and equipment deliveries plus various construction activities

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 28 of 62

Streets affected: Baker Avenue (verge/footpath closure) between Frank Street and Proud Street

Show more

Start date: 10 May 2019

End date: 10 July 2019

Duration: 12am – 11:59pm

Reason: To facilitate new development site

north

Road closures

Planned - Temporary Road Closure - Robina

Day 27 of 31

Streets affected: Scottsdale Drive between Christine Avenue and Laurel Oak Drive; Laurel Oak Drive between Scottsdale Drive and Mountain Ash Circuit (parking lane/bay closure with hold and release for 2 minutes maximum)

Show more

Start date: 11 May 2019

End date: 10 June 2019

Duration: 6:30am – 6:30pm

Reason: To assist large construction vehicles in and out of development site

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 25 of 60

Streets affected: Gold Coast Highway (loading zone closure) between Connor Street and West Street

Show more

Start date: 13 May 2019

End date: 11 July 2019

Duration: 6:30am – 6:30pm

Reason: The Loading Zone will be used by pedestrians to bypass a footpath closure

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 25 of 66

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) between Nineteenth Avenue and Fifteenth Avenue

Start date: 13 May 2019

End date: 17 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries of building materials / scaffolding to the construction site

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 23 of 32

Streets affected: Old Pacific Highway (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Fig Tree Court and Leo Graham Way

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 9:00am 2:30pm

Reason: Closure to facilitate water main crossing requiring trenching

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 22 of 31

Streets affected: Birmingham Road (lane, bike lane and verge/footpath closure) between Emanual College Drive and Nielsens Road

 

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Pavement investigation services

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 22 of 93

Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road

 

 

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: Midnight 11:59pm

Reason: Continuous footpath closure to facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 22 of 93

Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: 6:30am – 6:30pm

Reason: Full road closure at end of road to facilitate construction activities when required for safety

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 21 of 61

Streets affected: Helensvale Road (verge/footpath, partial lane closure) between Hannaford Place and Siganto Drive

Show more

Also affected: Woodside Place, Grey Gum Street, Shepparton Road, Michigan Drive, Parkside Drive, John Dalley Drive

Start date: 17 May 2019

End date: 16 July 2019

Duration: 6:30am – 6:30pm

Reason: NBN Works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 21 of 32

Streets affected: Stanmore Road (lane, bike lane verge/footpath closure with hold and release for 2 minutes maximum) between Paterson Road and Quarry Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 21 of 32

Streets affected: Enkleman Street (lane, bike lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanmore Road and Taperoo Court

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 21 of 32

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 9:00am 2:30pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 20 of 31

Streets affected: Fourth Avenue (verge/footpath closure) between Third Avenue and Fifth Avenue

 

 

Show more

Start date: 18 May 2019

End date: 17 June 2019

Duration: Midnight 11.59pm

Reason: To facilitate a safe work place for the construction site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 18 of 20

Streets affected: Alec Avenue between Peter Parade and Hillcrest Parade; Kiers Road between Karbunya Street and Kallay Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 20 May 2019

End date: 8 June 2019

Duration: 6:30am – 5:30pm

Reason: Kerb and channelling on all four corners of Alec Avenue and Kiers Road intersection

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 18 of 40

Streets affected: Railway Parade (lane, bike lane, shoulder, verge/footpath, with hold and release for 2 minutes maximum) between Nerang-Broadbeach Road and Grenfell Street

Show more

Start date: 20 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm

Reason: Water main replacement program

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 17 of 18

Streets affected: Sandy Creek Road (half road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Start date: 20 May 2019

End date: 7 June 2019

Duration: 6:30pm 6:00am

Reason: Road profiling and asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 17 of 31

Streets affected: Quarry Road (rolling blockade) between Rossmanns Road and Stapylton Jacobs Well Road

 

Show more

Start date: 20 May 2019

End date: 20 June 2019

Duration: 7:00pm 5:00am

Reason: To facilitate falling weight deflectometer and ground penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 17 of 46

Streets affected: Bondi Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and end of road

 

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 17 of 46

Streets affected: Bondi Avenue (parking lane/bays closure) between Gold Coast Highway and End of road

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 17 of 92

Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway

Show more

Start date: 21 May 2019

End date: 20 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Miami

Day 17 of 32

Streets affected: Avalon Parade (parking lane closure) between Pacific Avenue and Paradise Avenue

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate sewer connection to existing manhole

south

Road closures

Planned - Temporary Road Closure - Tugan

Day 17 of 32

Streets affected: Singh Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Wyberba Street and end of street

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: Connect communications to existing pole

south

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 15 of 28

Streets affected: Mattocks Road (rolling lane closure) between Treeview Drive North and Bushtree Court

 

Show more

Start date: 22 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: Undertake falling weight deflectometer and ground penetration radar testing

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 15 of 16

Streets affected: Shipper Drive (shoulder, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Ford Road and End of road

Show more

Start date: 23 May 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm - Shoulder and verge/footpath closure

Duration 2: 9am - 2:30pm - Half road closure with hold and release

Reason: Installation of temporary dredge delivery pipe

north

Road closures

Planned - Temporary Road Closure - Molendinar

Day 14 of 17

Streets affected: Olsen Avenue (shoulder, verge/footpath closure) between Crestwood Drive and Smith Street

 

Show more

Start date: 23 May 2019

End date: 9June 2019

Duration: 800pm 5:00am

Reason: Removal and replacement of crossover

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 13 of 26

Streets affected: Christine Avenue (Rolling lane closure) between Bridgewater Drive and Varsity College car park

 

Show more

Start date: 24 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: To undertake falling weight deflectometer and ground testing penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 30

Streets affected: Cavill Avenue (partial lane closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevarde and Ferny Avenue

Show more

Start date: 24 May 2019

End date: 23 June 2019

Duration: 8pm – 5am

Reason: Falling weight deflectometer and ground penetrating radar investigations

north

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 13 of 32

Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive

Show more

Start date: 25 May 2019

End date: 25 June 2019

Duration: 6:30am – 6:30pm

Reason: Large deliveries, concrete pours, trucks and construction vehicles entering and exiting the site

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 11 of 12

Streets affected: Somerset Drive (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Jarema Drive and Bonogin Road

Show more

Also affected: Somerset Drive between Gemvale Road and Swanton Drive; Gemvale Road between Jarema Drive and Alvey Court

Start date: 26 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closures - Surfers Paradise

Day 11 of 93

Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 27 May 2019

End date: 27 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate road works, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Pacific Pines

Day 11 of 15

Streets affected: Midway Terrace (half road closure with hold and release for 2 minutes maximum) between Hillary Circuit and Santa Isobel Boulevard

 

 

 

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 6:30am 6:30pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 11 of 32

Streets affected: Cassia Street between Bayview Street and Joseph Street; Joseph Street between Poinsettia Avenue and Howard Street (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works, including inspections, cleaning and reline installations

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 11 of 33

Streets affected: Finnegan Way (verge/footpath, parking lane/bay closure) between Ritz Drive and Chromata Lane

Show more

Start date: 27 May 2019

End date: 28 June 2019

Duration: 7am – 2pm

Reason: Installation of a weathproof shelter over the footpath between the Coomera Rivers State School boundary and the 'Stop Drop and Go' parking/drop off lane

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 11 of 15

Streets affected: White Street (lane, partial lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Price Street and Nerang Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 11 of 15

Streets affected: Brighton Parade (bike lane, half road closure with hold and release for 2 minutes maximum) between Como Crescent and Como Crescent

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 11 of 12

Streets affected: Surf Parade (verge/footpath closure with hold and release for 2 minutes maximum) between Victoria Avenue and Queensland Avenue

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7am – 5pm

Reason: Removing coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 11 of 13

Streets affected: Jefferson Lane (full road closure with local access for residents with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Dates: 27 - 31 May 2019; 3 - 8 June 2019

Duration: 7am – 5pm

Reason: Concrete pours for paths, stairs and crossovers including landscaping supplies

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 11 of 32

Streets affected: Marina Quays Boulevarde (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Waters Close and Crescent Avenue

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 7am – 5pm

Reason: Gas main extension

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 11 of 17

Streets affected: Reserve Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Rose Valley Drive and Greenleaf Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9am – 2:30pm

Reason: Modify existing guardrail

north

Road closures

Planned - Temporary Road Closure - Robina

Day 11 of 17

Streets affected: Cottesloe Drive (parking lane closure) between Grenaside Court and Pyrmont Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9:30am – 3pm

Reason: Removal of two existing guardrails

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 10 of 11

Streets affected: Highland Way (bike lane, half road closure with hold and release for 2 minutes maximum) between Skyridge Drive and Rose Valley Drive

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 10 of 14

Streets affected: Griffith Street (half road closure with hold and release for 2 minutes maximum) between Warner Street and Dixon Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 11:59pm (Sun - Thu only) – 5am (Mon - Fri only)

Reason: Replacement of street light on a centre traffic island

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 10 of 15

Streets affected: Banyula Drive between Evers Street and Coolibah Road; Matilda Road between End of road and Banyula Drive (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 28 May 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: To repair and replace broken guardrail

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 10 of 32

Streets affected: Sunshine Boulevarde (lane, verge/footpath closure) between Surfers Avenue and Gretel Drive

Show more

Start date: 28 May 2019

End date: 28 June 2019

Duration: 9am – 1pm

Reason: To facilitate safe ingress and egress of construction vehicles

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 9 of 64

Streets affected: Markeri Street (lane closure) between Sunshine Boulevarde and Avanti Street

Show more

Start date: 29 May 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 9 of 32

Streets affected: Bienvenue Drive (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Clives Circuit and Itong Place

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 6:30am – 1pm

Reason: Excavate and remove existing water meter; install new meter and concrete lid

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 9 of 32

Streets affected: Peachey Road (lane, shoulder, verge/footpath closure with hold and release for 2 minutes maximum) between Caswell Court and Oppermann Drive

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 7am – 7pm

Reason: Installation of drainage line from flow meter to gully

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 9 of 73

Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road

Show more

Start date: 29 May 2019

End date: 9 August 2019

Duration: 7am – 5pm

Reason: New recycled water investigation - potholing stage

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 8 of 13

Streets affected: Gilston Road (lane closure) between Winderadeen Court and New Street

Show more

Start date: 29 May 2019

End date: 11 Jun 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 8 of 9

Streets affected: Queen Street between Mal Burke Street and Ward Street; Mal Burke Street between Queen Street and Pohlman Street (full road closure with detour)

Show more

Start date: 29 May 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: To facilitate sewer connection under road way for new development

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 8 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 7 of 10

Streets affected: Philippine Parade (lane, verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 31 May 2019

End date: 9 June 2019

Duration: 12am – 11:59pm

Reason: Building a manhole for sewer connection

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 7 of 57

Streets affected: Eggersdorf Road (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Arthur Way and Stewart's Road

Show more

Start date: 31 May 2019

End date: 26 July 2019

Duration: 12am – 11:59pm

Reason: Road duplication/upgrading of Eggersdorf Road - Phase 3

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 7 of 32

Streets affected: Nelson Avenue (shoulder, verge/footpath closure) between Pool Street and Sheehan Drive

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 7 of 32

Streets affected: Oxley Drive (shoulder, verge/footpath closure) between Crescent Avenue and Sunbird Place

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 7 of 15

Streets affected: McLaren Road (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Castagno Avenue and Fillmore Street

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration 1: 9:30am – 2:30pm (Mon - Fri)

Duration 2: 6:30am - 6:30pm (Saturdays)

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 7 of 15

Streets affected: Reserve Road between Lawson Drive and Coldcrest Drive; Old Coach Road between Reserve Road and Baileys Mountain Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9am – 2:30pm

Reason: Install coloured surfacing at roundabout and approaches

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 6 of 14

Streets affected: Benowa Road between St Kevins Avenue and Allchurch Street; Mediterranean Drive between Mary Ann Street and Benowa Road (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9pm – 6am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 6 of 61

Streets affected: Salzburg Road (full road closure with detours) between Barry Street and Yawalpah Road

Show more

Also affected: Yawalpah Road (verge/footpath closure with hold and release for 2 minutes maximum) between Attenborough Boulevarde and Old Pacific Motorway

Start date: 1 June 2019

End date: 31 July 2019

Duration 1: 12am – 11:59pm

Duration 2: 9am - 2:30pm (Yawalpah Road)

Reason: Stage 2 (1 June - 12 July 2019)   and   Stage 3 (13 July - 31 July 2019) works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 6 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 6 of 8

Streets affected: Bayview Street (bike lane, shoulder closure with hold and release for 2 minutes maximum) between Simbai Street and Lae Drive

Show more

Start date: 1 June 2019

End date: 8 June 2019

Duration 1: 6:30am – 6:30pm (Saturdays)

Duration 2: 9:30am - 2:30pm 

Reason: To facilitate overhead works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 6 of 92

Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street

Show more

Start date: 1 June 2019

End date: 31 August 2019

Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Bonogin

Day 6 of 30

Streets affected: Bonogin Road (verge/footpath, half road, parking lane/bay, bike lane, shoulder closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Canopy Drive

Show more

Also affected: Hardys Road (slip lane, shoulder closure) between Bonogin Road and Glenmore Drive

Also affected: Carrington Road (verge/footpath, shoulder closure) between Bonogin Road and Tahilia Court

Start date: 1 June 2019

End date: 30 June 2019

Duration: 7am – 5pm

Reason: Water main renewal works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 6 of 6

Streets affected: Ferny Avenue (lane, partial lane, shoulder, metered parking/loading zone, full road closure with hold and release for 2 minutes maximum) between Beach Road and Gold Coast Highway

Show more

Start date: 1 June 2019

End date: 6 June 2019

Duration: 6pm – 6am

Reason: Road rehabilitation mill and fill

north

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 31

Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone, half road closure) between Bay Street and Windmill Street

Show more

Start date: 2 June 2019

End date: 2 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction deliveries only when required

north

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 6

Streets affected: Wilson Street between Jimmieson Avenue and Musgrave Avenue; Neville Avenue between Chuter Avenue and Musgrave Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 2 June 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: Water and Waste sewer relining

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 4 of 12

Streets affected: Executive Drive (half road closure with hold and release for 2 minutes maximum) between Burleigh Connection Road and Bermuda Street

Show more

Also affected: Classic Way between Executive Drive and Bermuda Street

Start date: 3 June 2019

End date: 14 June 2019

Duration: 5am – 6:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure - Elanora

Day 4 of 43

Streets affected: Nineteenth Avenue (half road, parking lane/bay, bike lane closure with hold and release for 2 minutes maximum) between Angelica Street and Saffron Street

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6am – 6pm

Reason: Profiling, sealing and asphalt works

south

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 4 of 43

Streets affected: Lae Drive between Oxley Drive and Bayview Street; Moralla Avenue between Sports Drive and Folkstone Place (parking lane/bay, bike lane, lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: Remedial works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 4 of 5

Streets affected: Gold Coast Highway (parking bay closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone - 4x parking bays (#8107 to #8110)

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 4 of 59

Streets affected: Gold Coast Highway (verge/footpath closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: To install signs and complete works

south

Road closures

Planned - Temporary Road Closure - Miami

Day 4 of 24

Streets affected: Santa Monica Road between Chairlift Avenue East and Riviera Road; Paradise Avenue between Pacific Avenue and Bardon Avenue (verge/footpath, parking lane/bay closure)

Show more

Start date: 3 June 2019

End date: 26 June 2019

Duration: 6:30am – 6:30pm

Reason: Installation of CoGC conduit and fibre optic cable for the Digital City Expansion Project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 4 of 15

Streets affected: Main Beach Parade between Beulah Lane and MacArthur Parade; John Kemp Street between Pacific Street and Main Beach Parade (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 17 June 2019

Duration: 7am – 5pm

Reason: Install coloured works

north

Mosquito spraying

Planned - Pest Animal Trapping - Pimpama River Conservation Area

Day 4 of 12

Areas affected: Pimpama River Conservation Area

Pest animal trapping will be carried out within Pimpama River Conservation Area from 7.00am Monday 3rd June 2019 to 11.59pm Friday 14th June 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Southport

Day 4 of 5

Streets affected: Falconer Street (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Nerang Street and Ward Street

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 7am – 2pm

Reason: To facilitate water main road crossing cut dig and reinstate

north

Road closures

Planned - Temporary Road Closure - Tallebudgera Valley

Day 4 of 19

Streets affected: Tallebudgera Creek Road (half road closure with hold and release for 2 minutes maximum) between Mount Cougal Road and Len Dickfos Road

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 4pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 4 of 19

Streets affected: Currumbin Creek Road (half road closure with hold and release for 2 minutes maximum) between Braewood Road and Kianga Court

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 3pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 19

Streets affected: Nerang Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Short Street and Ferry Street

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9am – 2pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 4 of 5

Streets affected: Nielsens Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Birmingham Road and Hickey Way

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9am – 2:30pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 4 of 5

Streets affected: Crusader Way (lane, partial lane, shoulder and verge/footpath) between Weedons Road and Saxon Court

 

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9:30am 2:30pm

Reason: Loop cutting repairs

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 4 of 19

Streets affected: Rifle Range Road (half road closure with hold and release for 2 minutes maximum) between Waverley Drive and Hotham Creek Road

 

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am 2:30pm

Reason: Installation of a floodway sign

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 4 of 19

Streets affected: Old Coach Road (shoulder closure at roundabout) between Kingsmore Boulevarde and Pacific Motorway off-ramp

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Robina

Day 4 of 19

Streets affected: Robina Town Centre Drive (lane closure) between Investigator Drive and Highfield Drive

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 4 of 15

Streets affected: Nielsens Road (lane, bike lane, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Coelia Court and Hickey Way

Show more

Also affected: Murev Way, Pappas Way, Alzino Place and Greenbank Circuit

Start date: 3 June 2019

End date: 17 June 2019

Duration: 6pm – 6am

Reason: Road profiling, sealing and asphalt works

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 4 of 13

Streets affected: Albatross Avenue (verge/footpath, full road closure with detour) between Lavarack Road and Chairlift Avenue East

 

Show more

Start date: 3 June 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 4 of 28

Streets affected: Markeri Street (lane, bike lane, shoulder, verge/footpath, parking lane/bay closure) between Sunshine Boulevarde and Intrepid Drive

Show more

Start date: 3 June 2019

End date: 30 June 2019

Duration: 7pm – 5am

Reason: Road pavement investigation and testing

south

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 4 of 4

Streets affected: Anembo Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 3 June 2019

End date: 6 June 2019

Duration: 10pm (Sun - Wed)  / 11pm (Thu - Fri) – 6am

Reason: Relining a sewer pipeline

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 3 of 93

Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)

Show more

Start date: 4 June 2019

End date: 4 September 2019

Duration: 12am – 11:59pm

Reason: To facilitate placement of overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 3 of 16

Streets affected: First Avenue (full road closure) between Beach Parade and Old Burleigh Road

Show more

Date 1: 4 June 2019

Date 2: 19 June 2019

Duration: 7:30am – 4pm

Reason: Energex works

south

Road closures

Planned - Temporary Road Closure - Southport

Day 2 of 123

Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue

 

Show more

Start date: 5 June 2019

End date: 5 October 2019

Duration: Midnight 11:59pm

Reason: Lateral shift of traffic for protection of culvert asset

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 2 of 8

Streets affected: Hargraves Road (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Reindeer Street and Bambi Close with Roe Street, Fawn Street and Fallow Street also affected

 

Show more

Start date: 5 June 2019

End date: 12 June 2019

Duration: 6:30am 3:30pm

Reason: Placement of pram ramps and island ramp through traffic island

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 2 of 20

Streets affected: Cavill Avenue (part footpath closure) on the corner of Cavill Avenue and Orchid Avenue

 

Show more

Start date: 5 June 2019

End date: 24 June 2019

Duration: 7:00am 6:30pm

Reason: Removal of existing shopfront and fitout of new retail store

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 2 of 31

Streets affected: Cunningham Drive North (bike lane, shoulder, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum) between Dixon Drive and William Boulevard

 

Show more

Start date: 5 June 2019

End date: 5 July 2019

Duration: 7:00am 5:00pm (verge/footpath closures)

Duration: 9.00am - 2.30pm (bike lane, shoulder, parking lane bays)

Reason: Extension of gas main

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 2 of 3

Streets affected: Benowa Road (bike lane and half road closure with hold and release for 2 minutes maximum) between St Kevins Avenue and Allchurch Street

Show more

Start date: 5 June 2019

End date: 7 June 2019

Duration: 9:00am 2:30pm

Reason: Borehole works

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 2 of 26

Streets affected: Christine Avenue (lane, verge/footpath, parking lane/bay closure) between South Bay Drive and Regensberg Close

Show more

Start date: 5 June 2019

End date: 30 June 2019

Duration: 9:30am – 2:30pm

Reason: Remove and reconstruct the pedestrian ramps and various lengths of footpath on each of the four corners of the intersection

south

Water and sewerage

Planned - Water Interruption - Burleigh Heads

Day 2 of 2

Streets affected: Ocean Street, Park Avenue, Gold Coast Highway

Cause: Maintenance work on water main

Ispot/Pathway:

W/O: 60006556

Notif: 1000568543

Show more

Start time and date: 10.00pm, 5  June  2019

End time and date: 3.00am,  6  June  2019

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 1 of 56

Streets affected: River Terrace (full road, verge/footpath closure) between Enderley Avenue and End of road

Show more

Start date: 6 June 2019

End date: 31 July 2019

Duration: 12am – 11:59pm

Reason: Construction of emergency storage on DN750 sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 1 of 93

Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 6 June 2019

End date: 6 September 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 1 of 15

Streets affected: Sickle Avenue (verge/footpath, bike lane, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Trinity Crescent and Harbour Rise

Show more

Start date: 7 June 2019

End date: 20 June 2019

Duration: 6:30am 6:00pm

Reason: Exposing, removing and replacing water meter and installing a concrete pit

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 1 of 62

Streets affected: Marina Quays Boulevard between Sickle Avenue and Mervyn Thomas Drive (hold and release for 2 minutes maximum) and Mervyn Thomas Drive between Marina Quays Boulevard and Broadwater Avenue (half road closure with hold and release for 2 minutes maximum) 

 

Show more

Start date: 6 June 2019

End date: 6 August 2019

Duration: 6:30am 6:30pm

Reason: Rectification and maintenance works for development

north

Water and sewerage

Planned - Water interruption - Ormeau

9.00am - 2.00pm

Streets affected: Doherty Court

Cause: Replacing hydrants

Ispot/Pathway: 73503315

W/O: 60005356

Notif: 1000573911

north

Water and sewerage

Planned - Water Interruption - Pimpama

9.00am - 2.00pm

Streets affected: Richmond Street, Hipwood Street

Cause: Work  on watermain

W/O: 52011033

Notif: 1000574371

north

Water and sewerage

Planned - Water Interruption - Mudgeeraba

9.00am - 2.00pm

Streets affected: Equinox Court

Cause: Repair water main

W/O: 20509653

Notif: 1000570738

south

Water and sewerage

Planned - Water interruption - Robina

9.00am - 2.00pm

Streets affected: Scottsdale Drive between Heights Drive and Energy Circuit, western side of Scottsdale Drive

Cause: New water connections

W/O: 52011040

Notif: 1000577197

south

Water and sewerage

Planned - Water Interruption - Oxenford

9.00am - 2.00pm

Streets affected: Old Pacific Highway between Michigan Drive and Leo Graham Way

Cause: New connection to water main

W/O: 52011041

Notif: 1000577203

north

Water and sewerage

Planned - Water Interruption - Burleigh Heads

Day 1 of 2

Streets affected: The Esplanade, Gold Coast Highway

Cause: Maintenance work on  water main

Ispot/Pathway:

W/O: 60006555

Notif: 1000568534

Show more

Start time and date: 10.00pm,  6 June  2019

End time and date: 3.00am, 7 June  2019

south

 
7 Jun - Friday
Water and sewerage

Unplanned - Water Interruption - Currumbin Waters

Day 2 of 2

Streets affected: Bienvenue Drive

Cause: Repair water main

W/O: 20516629

Notif: 1000578412

Show more

Start time and date: 9.45pm, 6 June 2019

End time and date: 12.45am, 7 June 2019

south

Water and sewerage

Unplanned - Water Interruption -Stapylton

1.20am - 2.20am

Streets affected: Quinns Hill Road East

Cause: Repair fire hydrant

W/O. 20515392

north

Water and sewerage

Unplanned - Water Interruption - Maudsland

2.00pm - 3.30pm

Streets affected: Roberts Drive, Streeton Place, Malouf Place, James Place, Lowe Court, McGuire Court

Cause: Repair water main

W/O: 20516779

Notif: 1000578580

central

Water and sewerage

Unplanned - Water Interruption - Broadbeach Waters

9.30pm - 11.30pm

Streets affected: Boongala Road

Cause: Repair water service

W/O: 20516873

Notif: 1000578734

central

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 207 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 191 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 145 of 200

Streets affected: Old Coach Road between Phaeton Street and Days Road; Days Road between Coomera Grand Drive and Old Coach Road (verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 12am – 11:59pm

Reason: Intersection Upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 145 of 200

Streets affected: Old Coach Road between Days Road and Coomera Grand Drive; also between Phaeton Street and Days Road (partial lane, bike lane and verge/footpath closure)

Show more

Start date: 14 January 2019

End date: 1 August 2019

Duration: 6:30am – 6:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 127 of 150

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure)

Show more

Start date: 1 February 2019

End date: 30 June 2019

Duration: 6:30am – 2:30pm

Reason: Lane closure on approach to and including roundabout

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 126 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 113 of 136

Streets affected: Marine Parade (parking lane/bay closure with hold and release for 2 minutes maximum) between Ocean Street and Taylor Street

Show more

Start date: 15 February 2019

End date: 30 June 2019

Duration 1: 6:30am – 6pm (Hold and Release)

Duration 2: 12am - 11:59pm (car park)

Reason: To support the turning and entering of extra long vehicles into Quota Park for works activities

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 99 of 120

Streets affected: Marine Parade (half road, partial verge/footpath closure with hold and release for 2 minutes maximum) between Burrows Street and Taylor Street

Show more

Start date: 1 March 2019

End date: 28 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate delivery vehicles and concrete pours

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 93 of 123

Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 7 March 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe work environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 91 of 92

Streets affected: Gold Coast Highway (footpath closure) between Connor Street and West Street

Show more

Start date: 9 March 2019

End date: 8 June 2019

Duration: 12am – 11:59pm

Reason: Occupation of footpath for location of overhead gantry

south

Road closures

Planned - Temporary Road Closure - Southport

Day 89 of 93

Streets affected: 216 Queen Street (verge/footpath closure with hold and release for 2 minutes maximum) between Mal Burke Street and Ward Street

Show more

Start date: 11 March 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: Construction activities for the demolition of an existing dwelling plus the site establishment for building a new 4 storey unit development

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 85 of 108

Streets affected: Days Road between Prewett Street and Old Coach Road; Old Coach Road between Coomera Grand Drive/Commercial Street and Days Road (lane closure on approach to and including roundabout)

Show more

Start date: 15 March 2019

End date: 30 June 2019

Duration: 6:30am – 5:30pm

Reason: Intersection upgrade of Old Coach Road and Days Road

north

Road closures

Planned - Temporary Road Closure - Robina

Day 83 of 175

CBUS Super Stadium - Events - NRL Season

Show more

Cheltenham Drive (Westbound) - CLOSED - local access only.

Robina Station Road - CLOSED - buses only.

Stadium Drive - CLOSED - pedestrians only.

Game Dates:

17 March 2019   /   12 April 2019   /   21 April 2019   /   18 May 2019   /   14 June 2019

29 June 2019   /   21 July 2019   /   27 July 2019   /   16 August 2019   /   7 September 2019

Duration: 7am – 11:30pm

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 81 of 93

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 19 March 2019

End date: 19 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 79 of 92

Streets affected: Twenty Forth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N

 

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: Midnight 11:59pm

Reason: Continuous partial verge/footpath closure for pedestrian safety

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 79 of 92

Streets affected: Cannes Avenue between Gold Coast Highway and Genoa Street; Genoa Street between Gold Coast Highway and Cannes Avenue (verge/footpath, partial lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 79 of 92

Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace North and Gold Coast Highway

Show more

Start date: 21 March 2019

End date: 20 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement of construction related vehicles

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 72 of 96

Streets affected: Frigo Court (metered parking / loading zone) between Karp Court and Crombie Avenue

 

Show more

Start date: 28 March 2019

End date: 1 July 2019

Duration: Midnight  11.59pm

Reason: Storage of building equipment (3 parking bays to be fenced off with temporary fencing)

north

Road closures

Planned - Temporary Road Closure - Miami

Day 68 of 91

Streets affected: Nobby Parade (full road closure local traffic access only) between Albion Avenue and Nundah Avenue

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert crossing

south

Road closures

Planned - Temporary Road Closure - Southport

Day 68 of 91

Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site

north

Road closures

Planned - Temporary Road Closure - Miami

Day 68 of 91

Streets affected: Gold Coast Highway outside Miami High School (verge / footpath closure with hold and release for 2 minutes maximum) between Chairlift Avenue and Santa Monica Road

 

Show more

Start date: 1 April 2019

End date: 30 June 2019

Duration: 6:30am 3:30pm

Reason: Construction of a car park within Miami High School

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 65 of 92

Streets affected: Old Burleigh Road (half road, lane closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street

 

Show more

Start date: 4 April 2019

End date: 4 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate movement of construction vehicles

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 61 of 61

Streets affected: Captain Cook Drive (lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Kendor Street and Demand Avenue

Show more

Start date: 8 April 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm (shoulder, verge/footpath closure)

Duration 2: 9am - 2:30pm (half road with hold and release)

Duration 3: 12am - 11:59pm (lane, verge/footpath closure with contraflow)

Reason: Works associated with a development including: bulk earthworks, civil works, roadworks and landscaping

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 61 of 91

Streets affected: Rutledge Street (parking bays closure) between Musgrave Street and Cul de sac

Show more

Start date: 8 April 2019

End date: 7 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 57 of 62

Streets affected: Foxwell Road (partial verge/footpath closure with hold and release intermittent for 2 minutes maximum) between Oakey Creek Road and Shipper Drive

Show more

Start date: 12 April 2019

End date: 12 June 2019

Duration 1: 9am – 6:30pm (Hold and Release for Westbound Carriageway only)

Duration 2: 6:30am - 6:30pm (Partial Verge/Footpath closure)

Reason: Construction of Coomera State High School

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 55 of 92

Streets affected: Jefferson Lane (verge/footpath closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 14 April 2019

End date: 14 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for development site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 55 of 59

Streets affected: Arcadia Drive (half road closure with hold and release for 2 minutes maximum) between Himalaya Street and Canberra Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 55 of 76

Streets affected: Mervyn Thomas Drive (shoulder, verge/footpath closure) between Broadwater Avenue and Halcyon Way

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 55 of 76

Streets affected: Pendraat Parade (shoulder, verge/footpath closure) between Sickle Avenue and Pendraat Parade cul de sac

Show more

Start date: 14 April 2019

End date: 28 June 2019

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 55 of 59

Streets affected: Jabiru Avenue (half road closure with hold and release for 2 minutes maximum) between Avocet Avenue and Fantail Court

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for stormwater relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 55 of 76

Streets affected: Halcyon Way (shoulder, verge/footpath, parking lane/bay closure) between Mervyn Thomas Drive and Crescent Avenue

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 55 of 59

Streets affected: Kalimna Drive (half road closure with hold and release for 2 minutes maximum) between Moana Park Avenue and End of road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 55 of 59

Streets affected: Allambi Avenue (half road closure with hold and release for 2 minutes maximum) between Naranga Avenue and Ilkinia Avenue

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 55 of 76

Streets affected: Marina Quays Boulevarde (shoulder, verge/footpath, parking lane/bay closure) between Sickle Avenue and Waters Close

Show more

Start date: 14 April 2019

End date: 28 June 2019

(1 week only between dates)

Duration: 6:30am – 4pm

Reason: To allow drilling rig set up for underground tunnel bore sewer works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 55 of 59

Streets affected: Bayview Street (half road closure with hold and release for 2 minutes maximum) between Kikori Crescent and Howard Street

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

north

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 55 of 59

Streets affected: Savoy Drive (half road closure with hold and release for 2 minutes maximum) between Allambi Avenue and Boongala Road

Show more

Start date: 14 April 2019

End date: 11 June 2019

(one week only between dates)

Duration: 6:30am – 6:30pm

Reason: To facilitate access to manhole for relining works

south

Road closures

Planned - Temporary Road Closure - Yatala

Day 54 of 92

Streets affected: Pearson Road (verge/footpath closure) between Kiralea Court and Darlington Drive

Show more

Start date: 15 April 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate implementation of heavy vehicle warning signs for construction site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 52 of 91

Streets affected: Elizabeth Avenue (verge/footpath closure) between Surf Parade and Old Burleigh Road

Show more

Start date: 17 April 2019

End date: 16 July 2019

Duration: 12am – 11:59pm

Reason: For the placement of an overhead pedestrian gantry

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 51 of 62

Streets affected: Jefferson Lane (half road closure with hold and release for 2 minutes maximum) between Third Avenue and Laceys Lane

Show more

Start date: 18 April 2019

End date: 18 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 49 of 92

Streets affected: Surfers Paradise Boulevard (occasional hold and release for 2 minutes maximum of traffic and pedestrians) between Staghorn Avenue and Palm Avenue

 

Show more

Start date: 20 April 2019

End date: 20 July 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction vehicles to safely reverse from site

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 46 of 91

Streets affected: Elizabeth Avenue (parking bay closure) between Old Burleigh Road and Surf Parade

Show more

Start date: 23 April 2019

End date: 22 July 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 45 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 24 April 2019

End date: 24 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Clear Island Waters

Day 45 of 53

Streets affected: Markeri Street between Caulfield Street and Greenwich Court and Greenwich Court between Markeri Street and cul-de-sac (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum)

 

 

Show more

Start date: 24 April 2019

End date: 15 June 2019

Duration: 9:00am 14:00pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Highland Park

Day 43 of 81

Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a boulder retaining wall

north

Road closures

Planned - Temporary Road Closure - Lower Beechmont

Day 43 of 81

Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

 

Show more

Start date: 26 April 2019

End date: 15 July 2019

Duration: Midnight 11:59pm

Reason: Reconstruction of a timber retaining wall

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 40 of 43

Streets affected: Cavill Avenue (partial footpath) between Orchid Avenue and The Esplanade

 

Show more

Start date: 29 April 2019

End date:  10 June 2019

Duration: Continuous

Reason: Installation of scaffolding to complete external works associated with the redevelopment of the Surfers Paradise Beer Garden

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 39 of 92

Streets affected: Gold Coast Highway (verge closure) between Thrower Drive and Hawaii Avenue

Show more

Start date: 30 April 2019

End date: 30 July 2019

Duration: 12am – 11:59pm

Reason: Occupation of verge for construction activities ensuring the footpath remains open at all times

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 38 of 84

Streets affected: Kerkin Road North (full road closure with detour and hold and release for 2 minutes maximum) between Yawalpah Road and Gainsborough Drive

 

Show more

Start date: 1 May 2019

End date: 23 July 2019

Duration: Midnight  11:59pm

Reason: Construction of a new roundabout and road widening

north

Road closures

Planned - Temporary Road Closure - Jacobs Well

Day 38 of 61

Streets affected: Helmore Road (shoulder, half road closure with hold and release for 2 minutes maximum) between Harbour Boulevard and Garagul Street

 

Show more

Start date: 1 May 2019

End date: 30 June 2019

Duration: 6:30am 6:00pm

Reason: Road widening, pavement surfacing and line marking

north

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 37 of 58

Streets affected: Boundary Street (half road closure with hold and release for 2 minutes maximum) between Hayter Street and Jewel Street

 

Show more

Start date: 1 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm (traffic controllers onsite) and 5.00pm - 7.00am (portable traffic signals onsite)

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 37 of 124

Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street

 

Show more

Start date: 2 May 2019

End date: 2 September 2019

Duration: Midnight 11.59pm

Reason: Associated construction activity for Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 37 of 58

Streets affected: Karloo Street between Mawarra Street and Burra Street (half road closure with hold and release for 2 minutes maximum) and Mawarra Street between Stanhill Drive and Thomas Drive (partial lane, parking bays, verge/footpath)

 

Show more

Start date: 2 May 2019

End date: 28 June 2019

Duration: Midnight 11.59pm

Reason: Street scaping project to the Green Bridge Project

north

Road closures

Planned - Temporary Road Closure - Bilinga

Day 36 of 59

Streets affected: Pacific Parade (verge/footpath closure) between Johnston Street and Archer Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: Continuous

Reason: Footpath closure for occupation of site office and construction materials

south

Road closures

Planned - Temporary Road Closure - Bilinga

Day 36 of 59

Streets affected: Pacific Parade (half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street

 

Show more

Start date: 3 May 2019

End date: 30 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 34 of 62

Streets affected: Albatross Avenue (bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Seashell Avenue and Heron Avenue

 

Show more

Start date: 5 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Daily closures to facilitate deliveries to site

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 32 of 32

Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade

 

Show more

Start date: 7 May 2019

End date: 7 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 32 of 61

Streets affected: Markeri Street, Australia Avenue, Queensland Avenue, Gold Coast Highway, Jubilee Avenue (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum)

 

Show more

Start date: 7 May 2019

End date: 6 July 2019

Duration: 6:30am 6:30pm

Reason: NBN / telecommunication installation

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 31 of 41

Streets affected: Old Coach Road (lane, bike lane, shoulder closure) between Low Drive and Marsh Street

Show more

Start date: 7 May 2019

End date: 17 June 2019

Duration: 7pm – 5am

Reason: Undertake Falling Weight Deflectometer (FWD) and Ground Penetration Radar (GPR) Testing under rolling traffic control conditions

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 31 of 93

Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate site sheds and material storage for development site

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 31 of 31

Streets affected: Fourth Avenue (full road closure local traffic access only) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone in designated parking bays

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 31 of 31

Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate a safe work environment for construction activities

south

Road closures

Planned - Temporary Road Closure - Broadbeach Waters

Day 31 of 31

Streets affected: Eady Avenue (partial lane, verge/footpath closure) between T E Peters Drive and No Through Road

Show more

Start date: 8 May 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate trenching works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 31 of 93

Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Construction Works

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 31 of 93

Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 31 of 93

Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street

Show more

Start date: 8 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: Detour for one way of traffic to facilitate concrete pours

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 30 of 32

Streets affected: Marina Quays Boulevard (shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Crescent Avenue and Mervyn Thomas Drive

 

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am 6:00pm

Reason: Sewer main works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 30 of 92

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate vehicle movement in and out of construction site

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 30 of 32

Streets affected: Peninsular Drive (verge/footpath closure) between Holborow Close and Watson Esplanade

Show more

Start date: 9 May 2019

End date: 9 June 2019

Duration: 6:30am – 6pm

Reason: Facilitate relocation of overhead power cables beneath the ground

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 30 of 92

Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street

Show more

Start date: 9 May 2019

End date: 8 August 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate material and equipment deliveries plus various construction activities

north

Road closures

Planned - Temporary Road Closure - Labrador

Day 29 of 62

Streets affected: Baker Avenue (verge/footpath closure) between Frank Street and Proud Street

Show more

Start date: 10 May 2019

End date: 10 July 2019

Duration: 12am – 11:59pm

Reason: To facilitate new development site

north

Road closures

Planned - Temporary Road Closure - Robina

Day 28 of 31

Streets affected: Scottsdale Drive between Christine Avenue and Laurel Oak Drive; Laurel Oak Drive between Scottsdale Drive and Mountain Ash Circuit (parking lane/bay closure with hold and release for 2 minutes maximum)

Show more

Start date: 11 May 2019

End date: 10 June 2019

Duration: 6:30am – 6:30pm

Reason: To assist large construction vehicles in and out of development site

south

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 26 of 60

Streets affected: Gold Coast Highway (loading zone closure) between Connor Street and West Street

Show more

Start date: 13 May 2019

End date: 11 July 2019

Duration: 6:30am – 6:30pm

Reason: The Loading Zone will be used by pedestrians to bypass a footpath closure

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 26 of 66

Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Also affected: Gold Coast Highway (parking lane/bay closure) between Nineteenth Avenue and Fifteenth Avenue

Start date: 13 May 2019

End date: 17 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate large deliveries of building materials / scaffolding to the construction site

south

Road closures

Planned - Temporary Road Closure - Oxenford

Day 24 of 32

Streets affected: Old Pacific Highway (bike lane, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Fig Tree Court and Leo Graham Way

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 9:00am 2:30pm

Reason: Closure to facilitate water main crossing requiring trenching

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 23 of 31

Streets affected: Birmingham Road (lane, bike lane and verge/footpath closure) between Emanual College Drive and Nielsens Road

 

 

Show more

Start date: 15 May 2019

End date: 15 June 2019

Duration: 6:00pm 6:00am

Reason: Pavement investigation services

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 23 of 93

Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road

 

 

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: Midnight 11:59pm

Reason: Continuous footpath closure to facilitate a safe working environment during construction activities

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 23 of 93

Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road

Show more

Start date: 16 May 2019

End date: 16 August 2019

Duration: 6:30am – 6:30pm

Reason: Full road closure at end of road to facilitate construction activities when required for safety

south

Road closures

Planned - Temporary Road Closure - Helensvale

Day 22 of 61

Streets affected: Helensvale Road (verge/footpath, partial lane closure) between Hannaford Place and Siganto Drive

Show more

Also affected: Woodside Place, Grey Gum Street, Shepparton Road, Michigan Drive, Parkside Drive, John Dalley Drive

Start date: 17 May 2019

End date: 16 July 2019

Duration: 6:30am – 6:30pm

Reason: NBN Works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 22 of 32

Streets affected: Stanmore Road (lane, bike lane verge/footpath closure with hold and release for 2 minutes maximum) between Paterson Road and Quarry Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 22 of 32

Streets affected: Enkleman Street (lane, bike lane, shoulder, verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanmore Road and Taperoo Court

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 6:30am 5:00pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 22 of 32

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

Show more

Start date: 17 May 2019

End date: 17 June 2019

Duration: 9:00am 2:30pm

Reason: Installation of guardrail and footpath

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 21 of 31

Streets affected: Fourth Avenue (verge/footpath closure) between Third Avenue and Fifth Avenue

 

 

Show more

Start date: 18 May 2019

End date: 17 June 2019

Duration: Midnight 11.59pm

Reason: To facilitate a safe work place for the construction site

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 19 of 20

Streets affected: Alec Avenue between Peter Parade and Hillcrest Parade; Kiers Road between Karbunya Street and Kallay Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 20 May 2019

End date: 8 June 2019

Duration: 6:30am – 5:30pm

Reason: Kerb and channelling on all four corners of Alec Avenue and Kiers Road intersection

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 19 of 40

Streets affected: Railway Parade (lane, bike lane, shoulder, verge/footpath, with hold and release for 2 minutes maximum) between Nerang-Broadbeach Road and Grenfell Street

Show more

Start date: 20 May 2019

End date: 28 June 2019

Duration: 7:00am 5:00pm

Reason: Water main replacement program

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 18 of 18

Streets affected: Sandy Creek Road (half road closure with hold and release for 2 minutes maximum) between Darlington Drive and Peachey Road

Show more

Start date: 20 May 2019

End date: 7 June 2019

Duration: 6:30pm 6:00am

Reason: Road profiling and asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Stapylton

Day 18 of 31

Streets affected: Quarry Road (rolling blockade) between Rossmanns Road and Stapylton Jacobs Well Road

 

Show more

Start date: 20 May 2019

End date: 20 June 2019

Duration: 7:00pm 5:00am

Reason: To facilitate falling weight deflectometer and ground penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 18 of 46

Streets affected: Bondi Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and end of road

 

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am 6:30pm

Reason: Facilitate construction activities

south

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 18 of 46

Streets affected: Bondi Avenue (parking lane/bays closure) between Gold Coast Highway and End of road

Show more

Start date: 21 May 2019

End date: 5 July 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 18 of 92

Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway

Show more

Start date: 21 May 2019

End date: 20 August 2019

Duration: 6:30am – 6:30pm

Reason: Works Zone

south

Road closures

Planned - Temporary Road Closure - Miami

Day 18 of 32

Streets affected: Avalon Parade (parking lane closure) between Pacific Avenue and Paradise Avenue

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: To facilitate sewer connection to existing manhole

south

Road closures

Planned - Temporary Road Closure - Tugan

Day 18 of 32

Streets affected: Singh Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Wyberba Street and end of street

Show more

Start date: 21 May 2019

End date: 21 June 2019

Duration: 6:30am 6:30pm

Reason: Connect communications to existing pole

south

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 16 of 28

Streets affected: Mattocks Road (rolling lane closure) between Treeview Drive North and Bushtree Court

 

Show more

Start date: 22 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: Undertake falling weight deflectometer and ground penetration radar testing

south

Road closures

Planned - Temporary Road Closure - Coomera

Day 16 of 16

Streets affected: Shipper Drive (shoulder, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Ford Road and End of road

Show more

Start date: 23 May 2019

End date: 7 June 2019

Duration 1: 6:30am – 6:30pm - Shoulder and verge/footpath closure

Duration 2: 9am - 2:30pm - Half road closure with hold and release

Reason: Installation of temporary dredge delivery pipe

north

Road closures

Planned - Temporary Road Closure - Molendinar

Day 15 of 17

Streets affected: Olsen Avenue (shoulder, verge/footpath closure) between Crestwood Drive and Smith Street

 

Show more

Start date: 23 May 2019

End date: 9June 2019

Duration: 800pm 5:00am

Reason: Removal and replacement of crossover

north

Road closures

Planned - Temporary Road Closure - Varsity Lakes

Day 14 of 26

Streets affected: Christine Avenue (Rolling lane closure) between Bridgewater Drive and Varsity College car park

 

Show more

Start date: 24 May 2019

End date: 19 June 2019

Duration: 7:00pm 5:00am

Reason: To undertake falling weight deflectometer and ground testing penetration radar testing

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 30

Streets affected: Cavill Avenue (partial lane closure with hold and release for 2 minutes maximum) between Surfers Paradise Boulevarde and Ferny Avenue

Show more

Start date: 24 May 2019

End date: 23 June 2019

Duration: 8pm – 5am

Reason: Falling weight deflectometer and ground penetrating radar investigations

north

Road closures

Planned - Temporary Road Closure - Chevron Island (Surfers Paradise)

Day 14 of 32

Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive

Show more

Start date: 25 May 2019

End date: 25 June 2019

Duration: 6:30am – 6:30pm

Reason: Large deliveries, concrete pours, trucks and construction vehicles entering and exiting the site

north

Road closures

Planned - Temporary Road Closure - Mudgeeraba

Day 12 of 12

Streets affected: Somerset Drive (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Jarema Drive and Bonogin Road

Show more

Also affected: Somerset Drive between Gemvale Road and Swanton Drive; Gemvale Road between Jarema Drive and Alvey Court

Start date: 26 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closures - Surfers Paradise

Day 12 of 93

Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road

Show more

Start date: 27 May 2019

End date: 27 August 2019

Duration: 12am – 11:59pm

Reason: To facilitate road works, concrete sub base and asphalt overlay

north

Road closures

Planned - Temporary Road Closure - Pacific Pines

Day 12 of 15

Streets affected: Midway Terrace (half road closure with hold and release for 2 minutes maximum) between Hillary Circuit and Santa Isobel Boulevard

 

 

 

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 6:30am 6:30pm

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 12 of 32

Streets affected: Cassia Street between Bayview Street and Joseph Street; Joseph Street between Poinsettia Avenue and Howard Street (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works, including inspections, cleaning and reline installations

north

Road closures

Planned - Temporary Road Closure - Coomera

Day 12 of 33

Streets affected: Finnegan Way (verge/footpath, parking lane/bay closure) between Ritz Drive and Chromata Lane

Show more

Start date: 27 May 2019

End date: 28 June 2019

Duration: 7am – 2pm

Reason: Installation of a weathproof shelter over the footpath between the Coomera Rivers State School boundary and the 'Stop Drop and Go' parking/drop off lane

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 12 of 15

Streets affected: White Street (lane, partial lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Price Street and Nerang Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 12 of 15

Streets affected: Brighton Parade (bike lane, half road closure with hold and release for 2 minutes maximum) between Como Crescent and Como Crescent

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Broadbeach

Day 12 of 12

Streets affected: Surf Parade (verge/footpath closure with hold and release for 2 minutes maximum) between Victoria Avenue and Queensland Avenue

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7am – 5pm

Reason: Removing coloured surfacing works

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 12 of 13

Streets affected: Jefferson Lane (full road closure with local access for residents with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Dates: 27 - 31 May 2019; 3 - 8 June 2019

Duration: 7am – 5pm

Reason: Concrete pours for paths, stairs and crossovers including landscaping supplies

south

Road closures

Planned - Temporary Road Closure - Hope Island

Day 12 of 32

Streets affected: Marina Quays Boulevarde (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Waters Close and Crescent Avenue

Show more

Start date: 27 May 2019

End date: 27 June 2019

Duration: 7am – 5pm

Reason: Gas main extension

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 12 of 17

Streets affected: Reserve Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Rose Valley Drive and Greenleaf Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9am – 2:30pm

Reason: Modify existing guardrail

north

Road closures

Planned - Temporary Road Closure - Robina

Day 12 of 17

Streets affected: Cottesloe Drive (parking lane closure) between Grenaside Court and Pyrmont Street

Show more

Start date: 27 May 2019

End date: 12 June 2019

Duration: 9:30am – 3pm

Reason: Removal of two existing guardrails

south

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 11 of 11

Streets affected: Highland Way (bike lane, half road closure with hold and release for 2 minutes maximum) between Skyridge Drive and Rose Valley Drive

Show more

Start date: 27 May 2019

End date: 7 June 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Coolangatta

Day 11 of 14

Streets affected: Griffith Street (half road closure with hold and release for 2 minutes maximum) between Warner Street and Dixon Street

Show more

Start date: 27 May 2019

End date: 10 June 2019

Duration: 11:59pm (Sun - Thu only) – 5am (Mon - Fri only)

Reason: Replacement of street light on a centre traffic island

south

Road closures

Planned - Temporary Road Closure - Gaven

Day 11 of 15

Streets affected: Banyula Drive between Evers Street and Coolibah Road; Matilda Road between End of road and Banyula Drive (half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 28 May 2019

End date: 11 June 2019

Duration: 6:30am – 6:30pm

Reason: To repair and replace broken guardrail

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 11 of 32

Streets affected: Sunshine Boulevarde (lane, verge/footpath closure) between Surfers Avenue and Gretel Drive

Show more

Start date: 28 May 2019

End date: 28 June 2019

Duration: 9am – 1pm

Reason: To facilitate safe ingress and egress of construction vehicles

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 10 of 64

Streets affected: Markeri Street (lane closure) between Sunshine Boulevarde and Avanti Street

Show more

Start date: 29 May 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: Manhole access for relining works

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 10 of 32

Streets affected: Bienvenue Drive (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Clives Circuit and Itong Place

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 6:30am – 1pm

Reason: Excavate and remove existing water meter; install new meter and concrete lid

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 10 of 32

Streets affected: Peachey Road (lane, shoulder, verge/footpath closure with hold and release for 2 minutes maximum) between Caswell Court and Oppermann Drive

Show more

Start date: 29 May 2019

End date: 29 June 2019

Duration: 7am – 7pm

Reason: Installation of drainage line from flow meter to gully

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 10 of 73

Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road

Show more

Start date: 29 May 2019

End date: 9 August 2019

Duration: 7am – 5pm

Reason: New recycled water investigation - potholing stage

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 9 of 13

Streets affected: Gilston Road (lane closure) between Winderadeen Court and New Street

Show more

Start date: 29 May 2019

End date: 11 Jun 2019

Duration: 7pm – 5am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 9 of 9

Streets affected: Queen Street between Mal Burke Street and Ward Street; Mal Burke Street between Queen Street and Pohlman Street (full road closure with detour)

Show more

Start date: 29 May 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: To facilitate sewer connection under road way for new development

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 8 of 10

Streets affected: Philippine Parade (lane, verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Seventh Avenue and Palm Beach Avenue

Show more

Start date: 31 May 2019

End date: 9 June 2019

Duration: 12am – 11:59pm

Reason: Building a manhole for sewer connection

south

Road closures

Planned - Temporary Road Closure - Ormeau

Day 8 of 57

Streets affected: Eggersdorf Road (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Arthur Way and Stewart's Road

Show more

Start date: 31 May 2019

End date: 26 July 2019

Duration: 12am – 11:59pm

Reason: Road duplication/upgrading of Eggersdorf Road - Phase 3

north

Road closures

Planned - Temporary Road Closure - Hope Island

Day 8 of 32

Streets affected: Nelson Avenue (shoulder, verge/footpath closure) between Pool Street and Sheehan Drive

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Paradise Point

Day 8 of 32

Streets affected: Oxley Drive (shoulder, verge/footpath closure) between Crescent Avenue and Sunbird Place

 

Show more

Start date: 31 May 2019

End date: 1 July 2019

Duration: 6:30am 6:00pm

Reason: NBN works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 8 of 15

Streets affected: McLaren Road (lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Castagno Avenue and Fillmore Street

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration 1: 9:30am – 2:30pm (Mon - Fri)

Duration 2: 6:30am - 6:30pm (Saturdays)

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 8 of 15

Streets affected: Reserve Road between Lawson Drive and Coldcrest Drive; Old Coach Road between Reserve Road and Baileys Mountain Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9am – 2:30pm

Reason: Install coloured surfacing at roundabout and approaches

north

Road closures

Planned - Temporary Road Closure - Benowa

Day 7 of 14

Streets affected: Benowa Road between St Kevins Avenue and Allchurch Street; Mediterranean Drive between Mary Ann Street and Benowa Road (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 31 May 2019

End date: 14 June 2019

Duration: 9pm – 6am

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 7 of 61

Streets affected: Salzburg Road (full road closure with detours) between Barry Street and Yawalpah Road

Show more

Also affected: Yawalpah Road (verge/footpath closure with hold and release for 2 minutes maximum) between Attenborough Boulevarde and Old Pacific Motorway

Start date: 1 June 2019

End date: 31 July 2019

Duration 1: 12am – 11:59pm

Duration 2: 9am - 2:30pm (Yawalpah Road)

Reason: Stage 2 (1 June - 12 July 2019)   and   Stage 3 (13 July - 31 July 2019) works

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 7 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 7 of 8

Streets affected: Bayview Street (bike lane, shoulder closure with hold and release for 2 minutes maximum) between Simbai Street and Lae Drive

Show more

Start date: 1 June 2019

End date: 8 June 2019

Duration 1: 6:30am – 6:30pm (Saturdays)

Duration 2: 9:30am - 2:30pm 

Reason: To facilitate overhead works

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 7 of 92

Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street

Show more

Start date: 1 June 2019

End date: 31 August 2019

Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)

Reason: To facilitate intersection upgrade

north

Road closures

Planned - Temporary Road Closure - Bonogin

Day 7 of 30

Streets affected: Bonogin Road (verge/footpath, half road, parking lane/bay, bike lane, shoulder closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Canopy Drive

Show more

Also affected: Hardys Road (slip lane, shoulder closure) between Bonogin Road and Glenmore Drive

Also affected: Carrington Road (verge/footpath, shoulder closure) between Bonogin Road and Tahilia Court

Start date: 1 June 2019

End date: 30 June 2019

Duration: 7am – 5pm

Reason: Water main renewal works

north

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 31

Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone, half road closure) between Bay Street and Windmill Street

Show more

Start date: 2 June 2019

End date: 2 July 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate construction deliveries only when required

north

Road closures

Planned - Temporary Road Closure - Southport

Day 6 of 6

Streets affected: Wilson Street between Jimmieson Avenue and Musgrave Avenue; Neville Avenue between Chuter Avenue and Musgrave Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 2 June 2019

End date: 7 June 2019

Duration: 8pm – 6am

Reason: Water and Waste sewer relining

north

Road closures

Planned - Temporary Road Closure - Burleigh Waters

Day 5 of 12

Streets affected: Executive Drive (half road closure with hold and release for 2 minutes maximum) between Burleigh Connection Road and Bermuda Street

Show more

Also affected: Classic Way between Executive Drive and Bermuda Street

Start date: 3 June 2019

End date: 14 June 2019

Duration: 5am – 6:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure - Elanora

Day 5 of 43

Streets affected: Nineteenth Avenue (half road, parking lane/bay, bike lane closure with hold and release for 2 minutes maximum) between Angelica Street and Saffron Street

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6am – 6pm

Reason: Profiling, sealing and asphalt works

south

Road closures

Planned - Temporary Road Closure - Runaway Bay

Day 5 of 43

Streets affected: Lae Drive between Oxley Drive and Bayview Street; Moralla Avenue between Sports Drive and Folkstone Place (parking lane/bay, bike lane, lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 15 July 2019

Duration: 6:30am – 6:30pm

Reason: Remedial works

north

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 5 of 5

Streets affected: Gold Coast Highway (parking bay closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 6:30am – 6:30pm

Reason: Work Zone - 4x parking bays (#8107 to #8110)

south

Road closures

Planned - Temporary Road Closure - Palm Beach

Day 5 of 59

Streets affected: Gold Coast Highway (verge/footpath closure) between Fourth Avenue and Fifth Avenue

Show more

Start date: 3 June 2019

End date: 31 July 2019

Duration: 6:30am – 6:30pm

Reason: To install signs and complete works

south

Road closures

Planned - Temporary Road Closure - Miami

Day 5 of 24

Streets affected: Santa Monica Road between Chairlift Avenue East and Riviera Road; Paradise Avenue between Pacific Avenue and Bardon Avenue (verge/footpath, parking lane/bay closure)

Show more

Start date: 3 June 2019

End date: 26 June 2019

Duration: 6:30am – 6:30pm

Reason: Installation of CoGC conduit and fibre optic cable for the Digital City Expansion Project

south

Road closures

Planned - Temporary Road Closure - Main Beach

Day 5 of 15

Streets affected: Main Beach Parade between Beulah Lane and MacArthur Parade; John Kemp Street between Pacific Street and Main Beach Parade (bike lane, half road closure with hold and release for 2 minutes maximum)

Show more

Start date: 3 June 2019

End date: 17 June 2019

Duration: 7am – 5pm

Reason: Install coloured works

north

Mosquito spraying

Planned - Pest Animal Trapping - Pimpama River Conservation Area

Day 5 of 12

Areas affected: Pimpama River Conservation Area

Pest animal trapping will be carried out within Pimpama River Conservation Area from 7.00am Monday 3rd June 2019 to 11.59pm Friday 14th June 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure - Southport

Day 5 of 5

Streets affected: Falconer Street (verge/footpath, full road closure with hold and release for 2 minutes maximum) between Nerang Street and Ward Street

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 7am – 2pm

Reason: To facilitate water main road crossing cut dig and reinstate

north

Road closures

Planned - Temporary Road Closure - Tallebudgera Valley

Day 5 of 19

Streets affected: Tallebudgera Creek Road (half road closure with hold and release for 2 minutes maximum) between Mount Cougal Road and Len Dickfos Road

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 4pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Currumbin Valley

Day 5 of 19

Streets affected: Currumbin Creek Road (half road closure with hold and release for 2 minutes maximum) between Braewood Road and Kianga Court

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 7am – 3pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 19

Streets affected: Nerang Street (half road, parking lane/bay closure with hold and release for 2 minutes maximum) between Short Street and Ferry Street

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9am – 2pm

Reason: Install coloured surfacing works

north

Road closures

Planned - Temporary Road Closure - Carrara

Day 5 of 5

Streets affected: Nielsens Road (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Birmingham Road and Hickey Way

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9am – 2:30pm

Reason: Tree works

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 5 of 5

Streets affected: Crusader Way (lane, partial lane, shoulder and verge/footpath) between Weedons Road and Saxon Court

 

Show more

Start date: 3 June 2019

End date: 7 June 2019

Duration: 9:30am 2:30pm

Reason: Loop cutting repairs

north

Road closures

Planned - Temporary Road Closure - Pimpama

Day 5 of 19

Streets affected: Rifle Range Road (half road closure with hold and release for 2 minutes maximum) between Waverley Drive and Hotham Creek Road

 

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am 2:30pm

Reason: Installation of a floodway sign

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 5 of 19

Streets affected: Old Coach Road (shoulder closure at roundabout) between Kingsmore Boulevarde and Pacific Motorway off-ramp

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Robina

Day 5 of 19

Streets affected: Robina Town Centre Drive (lane closure) between Investigator Drive and Highfield Drive

Show more

Start date: 3 June 2019

End date: 21 June 2019

Duration: 9:30am – 2pm

Reason: Stage 1: Install footings for floodway signs; Stage 2: Install floodway signs

south

Road closures

Planned - Temporary Road Closure - Carrara

Day 5 of 15

Streets affected: Nielsens Road (lane, bike lane, half road, verge/footpath closure with hold and release for 2 minutes maximum) between Coelia Court and Hickey Way

Show more

Also affected: Murev Way, Pappas Way, Alzino Place and Greenbank Circuit

Start date: 3 June 2019

End date: 17 June 2019

Duration: 6pm – 6am

Reason: Road profiling, sealing and asphalt works

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 5 of 13