Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

October 2019

Jump to today
1 Oct - Tuesday
Water and sewerage

Unplanned - Water interruption - Nerang

9.40am - 1.40pm

Streets affected: St Petersburgh Place, Colrene Drive between Klein Court and The Avenue

Cause: Repair water main

W/O: 20541079

Notif: 1000607527

central

Water and sewerage

Unplanned - Water Interruption - Palm Beach

9.00pm - 11.30pm

Streets affected: Mallawa Drive

Cause: Repair water main

W/O: 20541364

Notif: 1000607843

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 323 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 307 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 242 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 125 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 123 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Southport

Day 119 of 123

Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue

 

Show more

Start date: 5 June 2019

End date: 5 October 2019

Duration: Midnight 11:59pm

Reason: Lateral shift of traffic for protection of culvert asset

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 89 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 82 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 76 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 69 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 62 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 58 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 51 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 51 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 51 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 51 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 51 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 51 of 54

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Admiralty Drive and Tedder Avenue - Northern Bridge

 

Show more

Start date: 12 August 2019

End date: 4 October 2019

Duration: 9:00am 3.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 51 of 54

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Admiralty Drive and Tedder Avenue - Northern Bridge

 

Show more

Start date: 12 August 2019

End date: 4 October 2019

Duration: 9:00am 3.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 47 of 50

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Ferney Avenue and Admiralty Drive - Southern Bridge

 

Show more

Start date: 16 August 2019

End date: 4 October 2019

Duration: 9:00am 2.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 44 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 44 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 40 of 41

Streets affected: Somerset Drive (lane closure) between:

1. Gemvale Road and Leviathan Drive

2. Jerema Drive and Clover Hill Drive

 

Show more

Start date: 23 August 2019

End date: 2 October 2019

Duration: 9am - 2pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 40 of 41

Streets affected: Gemvale Road (lane closure) between Jerema Drive and Alvey Court

Show more

Start date: 23 August 2019

End date: 2 October 2019

Duration: 9am - 2pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure - Arundel

Day 37 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 36 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 36 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 36 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 36 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 35 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 30 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 29 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 29 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 29 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 29 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 24 of 31

Streets affected: Old Burleigh Road (lane closure) between Wharf Road and Fern Street

Show more

Start date: 8 September 2019

End date: 8 October 2019

Duration: 6.30am - 6.30pm

Reason: Movement of construction vehicles and materials to site.

central

Road closures

Planned - Temporary Road Closure - Robina

Day 23 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 23 of 26

Streets affected: Surf Parade (lane closure) between Victoria Avenue and Charles Avenue

Show more

Start date: 9 September 2019

End date: 4 October 2019

2 weeks between dates                  

Duration: 9am - 4pm (Mon-Fri) and 7pm - 6am (Mon-Wed)

Reason: Installation of palms and landscaping to centre median

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 19 of 20

Streets affected: McLaren Road (lane closure with hold and release for 2 minutes maximum) between Alexander Drive and Fillmore Street

Show more

Start date: 12 September 2019

End date: 2 October 2019

Duration: 7pm – 5am

Reason: Profiling followed by sealing and asphalt

north

Road closures

Planned - Temporary Road Closure - Gaven

Day 16 of 16

Streets affected: Arjuna Way (full road closure with detours and local access) between Banyula Drive and Castle Hill Drive

Show more

Also affected: Sommadatta Court (full road closure with detours and local access) between Arjuna Way and End of road

Also affected: Banyula Drive (bike lane, shoulder closure with hold and release for 2 minutes maximum) between Arjuna Way and Castle Hill Drive

Also affected: Castle Hill Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Nakula Street and Banyula Drive

Start date: 16 September 2019

End date: 1 October 2019

Duration: 6am – 6pm

Reason: Road sealing and asphalt works

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 16 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure - Nerang

Day 15 of 15

Streets affected: McLaren Road (lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Winchester Drive / Oakdale Avenue

Show more

Also affected: Yarrimbah Drive (lane, bike lane, half road closure with hold and release for 2 minutes maximum) between McLaren Road and Yarrowee Drive

Also affected: Yarrimbah Drive (lane, bike lane, half road closure with hold and release for 2 minutes maximum) between McLaren Road and Dugandan Street

Start date: 16 September 2019

End date: 1 October 2019

Duration: 6pm – 6am

Reason: Road profiling and asphalt works

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 15 of 17

Streets affected: Markeri Street (lane closure with hold and release for 2 minutes maximum) between Sunshine Boulevarde and Rio Vista Boulevarde

Show more

Start date: 16 September 2019

End date: 3 October 2019

Duration: 7pm – 5am

Reason: Profiling followed by sealing and asphalt

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 15 of 17

Streets affected: Markeri Street (lane closure with hold and release for 2 minutes maximum) between Sunshine Boulevarde and Rio Vista Boulevarde

Show more

Start date: 16 September 2019

End date: 3 October 2019

Duration: 7pm – 5am

Reason: Profiling followed by sealing and asphalt

south

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 15 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Tallai

Day 14 of 16

Streets affected: The Panorama (half road closure with hold and release for 2 minutes maximum) between Utopia Court and Coorumbene Court

Show more

Start date: 18 September 2019

End date: 3 October 2019

Duration: 6.30am - 6pm

Reason: Sealing work for 3 days over period

hinterland

Road closures

Planned - Temporary Road Closure Oxenford

Day 13 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 14

Streets affected: Oban Lane (full road closure local traffic access only) between Gibbs Street and Queen Street

Show more

Start date: 19 September 2019

End date: 3 October 2019

Duration: 7pm - 5pm

Reason: Installation of DN63 poly short service within the verge

central

Road closures

Planned - Temporary Road Closure Palm Beach

Day 12 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 11 of 16

Streets affected: Somerset Drive (lane closure) between Gemvale Drive and Leviathan Drive

Show more

Start date: 21 September 2019

End date: 6 October 2019

Duration: 7am - 5pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 9 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 9 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 9 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 9 of 13

Streets affected: Somerset Drive (half road closure with hold and release for 2 minutes maximum) between Swanton Drive and Gemvale Road

Show more

Start date: 23 September 2019

End date: 5 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

hinterland

Road closures

Planned - Temporary Road Closure - Tugun

Day 9 of 12

Streets affected: Golden Four Drive (lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Short Street and Mills Street

Show more

Start date: 23 September 2019

End date: 4 October 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 9 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure Carrara

Day 8 of 15

Streets affected: Nielsens Road (lane closure) between Birmingham Road and Nerang-Broadbeach Road

Show more

Start date: 23 September 2019

End date: 8 October 2019

Duration: 6pm - 6am

(3 shifts over period)

Reason: Road profiling and asphalt works

central

Road closures

Planned - Temporary Road Closure - Pimpama

Day 8 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 7 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 7 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Merrimac

Day 6 of 9

Streets affected: Bourton Road (half road closure with hold and release for 2 minutes maximum) between Gooding Drive and Willunga Place

Show more

Start date: 23 September 2019

End date: 4 October 2019 (1 x shift only)

Duration: 7am - 6pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 5 of 8

Streets affected: Boulton Drive (half road closure with hold and release for 2 minutes maximum) between Nerang Broadbeach Road and Railway Station carpark

Show more

Start date: 27 September 2019

End date: 4 October 2019

Duration: 7.30am - 3pm

Reason: Pavement testing

hinterland

Road closures

Planned - Temporary Road Closure Bundall

Day 2 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 2 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 2 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 2 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 2 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 2 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Chevron Island

Day 2 of 8

Streets affected: Mawarra Street (half road closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 30 September 2019

End date: 7 October 2019

Duration: 6.30am - 5pm

Reason: To facilitate installation of new street lights, cabling and testing

central

Road closures

Planned - Temporary Road Closure Stapylton

Day 2 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 2 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Coomera

Day 2 of 5

Streets affected: Amity Road (half road closure with hold and release for 2 minutes maximum) between Gillian Drive and Edwardson Drive / O'Rilly Drive

Show more

Start date: 30 September 2019

End date: 4 October 2019

Duration: 7am - 5pm (school holidays)

Reason: Install coloured surfacing works (1 day only over period)                

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 2 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 2 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 8

Streets affected: Robina Parkway (half road closure with hold and release for 2 minutes maximum) between Markeri Street and Boowaggan Road

 

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 8

Streets affected: Markeri Street (half road closure with hold and release for 2 minutes maximum) between Robina Parkway and Caulfield Street

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 1 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 1 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 1 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 1 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 1 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 1 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Mosquito spraying

Planned - Possible Mosquito Larviciding Aerial Treatment – Coombabah, Coomera Waters, Pimpama, Jacobs Well, Rocky Point, Helensvale, Arundel, Hope Island, Oyster Cove, Coombabah Lake & The Bay Islands

Day 1 of 2

Areas affected: Coombabah, Coomera Waters, Pimpama, Jacobs Well, Rocky Point, Helensvale, Arundel, Hope Island, Oyster Cove, Coombabah Lake & The Bay Islands

A possible Mosquito larviciding aerial treatment will be undertaken in these areas on Tuesday 1st October 2019 and Wednesday 2nd October 2019 between 7am and 5.30pm for control of mosquito larvae (weather permitting)

all regions

Water and sewerage

Planned - Water Interruption - Palm Beach

9.00am - 2.00pm

Streets affected: Thrower Drive

Cause: Fire hydrant replacement

W/O: 60006796

Notif: 1000603622

south

Water and sewerage

Planned - Water Interruption - Merrimac

9.00am - 2.45pm

Streets affected: Bourton Road, Bourton Place, Crelga Court

Cause: Replacement of water main

W/O: 60006626

Notif: 1000573523

Ispot/Pathway: 74548760

south

 
2 Oct - Wednesday
Water and sewerage

Unplanned - Water Interruption - Oxenford

8.35am - 9.35am

Streets affected: Artists Avenue

Cause: Repair water leak

W/O: 20539779

Notif: 1000606084

north

Water and sewerage

Unplanned - Water Interruption - Worongary

9.35am - 12.35pm

Streets affected: Walker Drive

Cause: Repair water main

W/O: 20536112

Notif: 1000601789

south

Water and sewerage

Unplanned - Water Interruption - Southport

10.20am - 12.20pm

Streets affected: Chester Terrace

Cause: Repair water leak

W/O: 60007045

Notif: 1000601665

central

Water and sewerage

Unplanned - Water Interruption - Southport

10.50am - 11.35am

Streets affected: Wildash Street

Cause: Repair water leak

W/O: 60007137

Notif: 1000607306

central

Water and sewerage

Unplanned - Water Interruption - Southport

11.25am - 12.25pm

Streets affected: Shirley Street between Alicia Street and Anne Street, and corner of Alicia Street and Shirley Street

Cause: Repair water leak

W/O: 20540550

Notif: 1000606959

central

Water and sewerage

Unplanned - Water interruption - Currumbin Waters

2.25pm - 3.25pm

Streets affected: Wilkinson Crescent

Cause: Repair water leak

W/O: 20540711

Notif: 1000607207

south

Water and sewerage

Unplanned - Water Interruption - Gilston

4.15pm - 5.15pm

Streets affected: Peter Mills Drive, Sittella Lane, Bellbird Place

Cause: Repair water service

W/O: 20541619

Notif: 1000608135

central

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 324 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 308 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 243 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 126 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 124 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Southport

Day 120 of 123

Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue

 

Show more

Start date: 5 June 2019

End date: 5 October 2019

Duration: Midnight 11:59pm

Reason: Lateral shift of traffic for protection of culvert asset

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 90 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 83 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 77 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 70 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 63 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 59 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 52 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 52 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 52 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 52 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 52 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 52 of 54

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Admiralty Drive and Tedder Avenue - Northern Bridge

 

Show more

Start date: 12 August 2019

End date: 4 October 2019

Duration: 9:00am 3.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 52 of 54

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Admiralty Drive and Tedder Avenue - Northern Bridge

 

Show more

Start date: 12 August 2019

End date: 4 October 2019

Duration: 9:00am 3.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 48 of 50

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Ferney Avenue and Admiralty Drive - Southern Bridge

 

Show more

Start date: 16 August 2019

End date: 4 October 2019

Duration: 9:00am 2.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 45 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 45 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 41 of 41

Streets affected: Somerset Drive (lane closure) between:

1. Gemvale Road and Leviathan Drive

2. Jerema Drive and Clover Hill Drive

 

Show more

Start date: 23 August 2019

End date: 2 October 2019

Duration: 9am - 2pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 41 of 41

Streets affected: Gemvale Road (lane closure) between Jerema Drive and Alvey Court

Show more

Start date: 23 August 2019

End date: 2 October 2019

Duration: 9am - 2pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure - Arundel

Day 38 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 37 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 37 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 37 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 37 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 36 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 31 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 30 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 30 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 30 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 30 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 25 of 31

Streets affected: Old Burleigh Road (lane closure) between Wharf Road and Fern Street

Show more

Start date: 8 September 2019

End date: 8 October 2019

Duration: 6.30am - 6.30pm

Reason: Movement of construction vehicles and materials to site.

central

Road closures

Planned - Temporary Road Closure - Robina

Day 24 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 24 of 26

Streets affected: Surf Parade (lane closure) between Victoria Avenue and Charles Avenue

Show more

Start date: 9 September 2019

End date: 4 October 2019

2 weeks between dates                  

Duration: 9am - 4pm (Mon-Fri) and 7pm - 6am (Mon-Wed)

Reason: Installation of palms and landscaping to centre median

south

Road closures

Planned - Temporary Road Closure - Nerang

Day 20 of 20

Streets affected: McLaren Road (lane closure with hold and release for 2 minutes maximum) between Alexander Drive and Fillmore Street

Show more

Start date: 12 September 2019

End date: 2 October 2019

Duration: 7pm – 5am

Reason: Profiling followed by sealing and asphalt

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 17 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 16 of 17

Streets affected: Markeri Street (lane closure with hold and release for 2 minutes maximum) between Sunshine Boulevarde and Rio Vista Boulevarde

Show more

Start date: 16 September 2019

End date: 3 October 2019

Duration: 7pm – 5am

Reason: Profiling followed by sealing and asphalt

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 16 of 17

Streets affected: Markeri Street (lane closure with hold and release for 2 minutes maximum) between Sunshine Boulevarde and Rio Vista Boulevarde

Show more

Start date: 16 September 2019

End date: 3 October 2019

Duration: 7pm – 5am

Reason: Profiling followed by sealing and asphalt

south

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 16 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Tallai

Day 15 of 16

Streets affected: The Panorama (half road closure with hold and release for 2 minutes maximum) between Utopia Court and Coorumbene Court

Show more

Start date: 18 September 2019

End date: 3 October 2019

Duration: 6.30am - 6pm

Reason: Sealing work for 3 days over period

hinterland

Road closures

Planned - Temporary Road Closure Oxenford

Day 14 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Southport

Day 13 of 14

Streets affected: Oban Lane (full road closure local traffic access only) between Gibbs Street and Queen Street

Show more

Start date: 19 September 2019

End date: 3 October 2019

Duration: 7pm - 5pm

Reason: Installation of DN63 poly short service within the verge

central

Road closures

Planned - Temporary Road Closure Palm Beach

Day 13 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 12 of 16

Streets affected: Somerset Drive (lane closure) between Gemvale Drive and Leviathan Drive

Show more

Start date: 21 September 2019

End date: 6 October 2019

Duration: 7am - 5pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 10 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 10 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 10 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 10 of 13

Streets affected: Somerset Drive (half road closure with hold and release for 2 minutes maximum) between Swanton Drive and Gemvale Road

Show more

Start date: 23 September 2019

End date: 5 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

hinterland

Road closures

Planned - Temporary Road Closure - Tugun

Day 10 of 12

Streets affected: Golden Four Drive (lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Short Street and Mills Street

Show more

Start date: 23 September 2019

End date: 4 October 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 10 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure Carrara

Day 9 of 15

Streets affected: Nielsens Road (lane closure) between Birmingham Road and Nerang-Broadbeach Road

Show more

Start date: 23 September 2019

End date: 8 October 2019

Duration: 6pm - 6am

(3 shifts over period)

Reason: Road profiling and asphalt works

central

Road closures

Planned - Temporary Road Closure - Pimpama

Day 9 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 8 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 8 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Merrimac

Day 7 of 9

Streets affected: Bourton Road (half road closure with hold and release for 2 minutes maximum) between Gooding Drive and Willunga Place

Show more

Start date: 23 September 2019

End date: 4 October 2019 (1 x shift only)

Duration: 7am - 6pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 6 of 8

Streets affected: Boulton Drive (half road closure with hold and release for 2 minutes maximum) between Nerang Broadbeach Road and Railway Station carpark

Show more

Start date: 27 September 2019

End date: 4 October 2019

Duration: 7.30am - 3pm

Reason: Pavement testing

hinterland

Road closures

Planned - Temporary Road Closure Bundall

Day 3 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 3 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 3 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 3 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 3 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 3 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Chevron Island

Day 3 of 8

Streets affected: Mawarra Street (half road closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 30 September 2019

End date: 7 October 2019

Duration: 6.30am - 5pm

Reason: To facilitate installation of new street lights, cabling and testing

central

Road closures

Planned - Temporary Road Closure Stapylton

Day 3 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 3 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Coomera

Day 3 of 5

Streets affected: Amity Road (half road closure with hold and release for 2 minutes maximum) between Gillian Drive and Edwardson Drive / O'Rilly Drive

Show more

Start date: 30 September 2019

End date: 4 October 2019

Duration: 7am - 5pm (school holidays)

Reason: Install coloured surfacing works (1 day only over period)                

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 3 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 3 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 8

Streets affected: Robina Parkway (half road closure with hold and release for 2 minutes maximum) between Markeri Street and Boowaggan Road

 

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 8

Streets affected: Markeri Street (half road closure with hold and release for 2 minutes maximum) between Robina Parkway and Caulfield Street

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 2 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 2 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Mosquito spraying

Planned - Possible Mosquito Larviciding Aerial Treatment – Coombabah, Coomera Waters, Pimpama, Jacobs Well, Rocky Point, Helensvale, Arundel, Hope Island, Oyster Cove, Coombabah Lake & The Bay Islands

Day 2 of 2

Areas affected: Coombabah, Coomera Waters, Pimpama, Jacobs Well, Rocky Point, Helensvale, Arundel, Hope Island, Oyster Cove, Coombabah Lake & The Bay Islands

A possible Mosquito larviciding aerial treatment will be undertaken in these areas on Tuesday 1st October 2019 and Wednesday 2nd October 2019 between 7am and 5.30pm for control of mosquito larvae (weather permitting)

all regions

Road closures

Planned - Temporary Road Closure Southport

1.00am - 5.00am

Streets affected: Scarborough Street (full road closure local traffic access only) between Nerang Street and Queen Street

Show more

Start date: 2 October 2019

End date: 2 October 2019

Duration: 1am - 5am

Reason: Hoisting of mobile crane to carry out air conditioning works on roof top of Shopping Centre

central

Water and sewerage

Planned - Water Interruption - Surfers Paradise

2.00am - 5.00am

Streets affected: Higman Street, Main Beach Parade, Ferny Avenue

Cause: Maintenance work on water main

W/O: 20538960

Notif: 1000606078

Ispot/Pathway: 74551466

central

Water and sewerage

Planned - Water interruption - Broadbeach

4.00am - 6.00am

Streets affected: Old Burleigh Road between First Avenue and Second Avenue

Cause: Maintenance work on water main

W/O: 20537488

Notif: 1000606233

Ispot/Pathway: 74563625

central

Water and sewerage

Planned - Water Interruption - Reedy Creek

9.00am - 2.00pm

Streets affected: Gemvale Road, Eden View Drive, Bridgman Drive

Cause: Fire hydrant replacement

W/O: 60006796

Notif: 1000603623

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

 
3 Oct - Thursday
Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 325 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 309 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 244 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 127 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 125 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Southport

Day 121 of 123

Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue

 

Show more

Start date: 5 June 2019

End date: 5 October 2019

Duration: Midnight 11:59pm

Reason: Lateral shift of traffic for protection of culvert asset

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 91 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 84 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 78 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 71 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 64 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 60 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 53 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 53 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 53 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 53 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 53 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 53 of 54

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Admiralty Drive and Tedder Avenue - Northern Bridge

 

Show more

Start date: 12 August 2019

End date: 4 October 2019

Duration: 9:00am 3.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 53 of 54

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Admiralty Drive and Tedder Avenue - Northern Bridge

 

Show more

Start date: 12 August 2019

End date: 4 October 2019

Duration: 9:00am 3.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 49 of 50

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Ferney Avenue and Admiralty Drive - Southern Bridge

 

Show more

Start date: 16 August 2019

End date: 4 October 2019

Duration: 9:00am 2.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 46 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 46 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 39 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 38 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 38 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 38 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 38 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 37 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 32 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 31 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 31 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 31 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 31 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 26 of 31

Streets affected: Old Burleigh Road (lane closure) between Wharf Road and Fern Street

Show more

Start date: 8 September 2019

End date: 8 October 2019

Duration: 6.30am - 6.30pm

Reason: Movement of construction vehicles and materials to site.

central

Road closures

Planned - Temporary Road Closure - Robina

Day 25 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 25 of 26

Streets affected: Surf Parade (lane closure) between Victoria Avenue and Charles Avenue

Show more

Start date: 9 September 2019

End date: 4 October 2019

2 weeks between dates                  

Duration: 9am - 4pm (Mon-Fri) and 7pm - 6am (Mon-Wed)

Reason: Installation of palms and landscaping to centre median

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 18 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 17 of 17

Streets affected: Markeri Street (lane closure with hold and release for 2 minutes maximum) between Sunshine Boulevarde and Rio Vista Boulevarde

Show more

Start date: 16 September 2019

End date: 3 October 2019

Duration: 7pm – 5am

Reason: Profiling followed by sealing and asphalt

south

Road closures

Planned - Temporary Road Closure - Mermaid Waters

Day 17 of 17

Streets affected: Markeri Street (lane closure with hold and release for 2 minutes maximum) between Sunshine Boulevarde and Rio Vista Boulevarde

Show more

Start date: 16 September 2019

End date: 3 October 2019

Duration: 7pm – 5am

Reason: Profiling followed by sealing and asphalt

south

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 17 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Tallai

Day 16 of 16

Streets affected: The Panorama (half road closure with hold and release for 2 minutes maximum) between Utopia Court and Coorumbene Court

Show more

Start date: 18 September 2019

End date: 3 October 2019

Duration: 6.30am - 6pm

Reason: Sealing work for 3 days over period

hinterland

Road closures

Planned - Temporary Road Closure Oxenford

Day 15 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Southport

Day 14 of 14

Streets affected: Oban Lane (full road closure local traffic access only) between Gibbs Street and Queen Street

Show more

Start date: 19 September 2019

End date: 3 October 2019

Duration: 7pm - 5pm

Reason: Installation of DN63 poly short service within the verge

central

Road closures

Planned - Temporary Road Closure Palm Beach

Day 14 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 13 of 16

Streets affected: Somerset Drive (lane closure) between Gemvale Drive and Leviathan Drive

Show more

Start date: 21 September 2019

End date: 6 October 2019

Duration: 7am - 5pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 11 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 11 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 11 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 11 of 13

Streets affected: Somerset Drive (half road closure with hold and release for 2 minutes maximum) between Swanton Drive and Gemvale Road

Show more

Start date: 23 September 2019

End date: 5 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

hinterland

Road closures

Planned - Temporary Road Closure - Tugun

Day 11 of 12

Streets affected: Golden Four Drive (lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Short Street and Mills Street

Show more

Start date: 23 September 2019

End date: 4 October 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 11 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure Carrara

Day 10 of 15

Streets affected: Nielsens Road (lane closure) between Birmingham Road and Nerang-Broadbeach Road

Show more

Start date: 23 September 2019

End date: 8 October 2019

Duration: 6pm - 6am

(3 shifts over period)

Reason: Road profiling and asphalt works

central

Road closures

Planned - Temporary Road Closure - Pimpama

Day 10 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 9 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 9 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Merrimac

Day 8 of 9

Streets affected: Bourton Road (half road closure with hold and release for 2 minutes maximum) between Gooding Drive and Willunga Place

Show more

Start date: 23 September 2019

End date: 4 October 2019 (1 x shift only)

Duration: 7am - 6pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 7 of 8

Streets affected: Boulton Drive (half road closure with hold and release for 2 minutes maximum) between Nerang Broadbeach Road and Railway Station carpark

Show more

Start date: 27 September 2019

End date: 4 October 2019

Duration: 7.30am - 3pm

Reason: Pavement testing

hinterland

Road closures

Planned - Temporary Road Closure Bundall

Day 4 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 4 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 4 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 4 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 4 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 4 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Chevron Island

Day 4 of 8

Streets affected: Mawarra Street (half road closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 30 September 2019

End date: 7 October 2019

Duration: 6.30am - 5pm

Reason: To facilitate installation of new street lights, cabling and testing

central

Road closures

Planned - Temporary Road Closure Stapylton

Day 4 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 4 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Coomera

Day 4 of 5

Streets affected: Amity Road (half road closure with hold and release for 2 minutes maximum) between Gillian Drive and Edwardson Drive / O'Rilly Drive

Show more

Start date: 30 September 2019

End date: 4 October 2019

Duration: 7am - 5pm (school holidays)

Reason: Install coloured surfacing works (1 day only over period)                

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 4 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 4 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 8

Streets affected: Robina Parkway (half road closure with hold and release for 2 minutes maximum) between Markeri Street and Boowaggan Road

 

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 8

Streets affected: Markeri Street (half road closure with hold and release for 2 minutes maximum) between Robina Parkway and Caulfield Street

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 3 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 3 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Coomera Waters, Coombabah, Pine Ridge, Paradise Waters & McIntosh Island

4.00am - 6.00am

Areas affected: Coomera Waters, Coombabah, Pine Ridge, Paradise Waters & McIntosh Island

Mosquito/biting midge spraying will be undertaken in these areas on Thursday 3rd October 2019 from 4am to 6am for control of mosquitos and biting midges (weather permitting). 

all regions

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 1 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Water and sewerage

Planned - Water Interruption - Reedy Creek

9.00am - 2.00pm

Streets affected: Bridgman Drive, Heulan Court, Royston Crescent

Cause: Fire hydrant replacement

W/O: 60006796

Notif: 1000603624

south

Water and sewerage

Planned - Water Interruption - Elanora

9.00am - 4.51pm

Streets affected: Sequoia Close, K P McGrath Drive, Ellioh Court, Park Court and Bindoon Close

Cause: Water main works in this area

W/O: 52011905

Notif: 1000607108

Ispot/Pathway: 74580419

south

Water and sewerage

Planned - Water interruption - Coolangatta

9.00am - 11.00am

Streets affected: Haig Street, Winston Street

Cause: Work on water main

W/O: 52011906

Notif: 1000607415

Ispot/Pathway: WWS2019/71

south

 
4 Oct - Friday
Water and sewerage

Unplanned - Water notification - Robina

11.00am - 12.00pm

Streets Affected : Retreat Planc, Stillwater Drive.

 

Causes : Repair Water Service

 

W/O : 20542047

 

Notify : 1000608580

south

Water and sewerage

Unplanned - Water notification - Palm Beach

11.20am - 1.20pm

Streets Affected : Iluka Street

 

Causes : Main Repair

 

W/O : 20539053

 

Notify : 1000605342

south

Water and sewerage

Unplanned - Water notification - Currumbin

1.45pm - 2.45pm

Streets Affected : Chippendale Crescent

 

Causes : Leak Repair

 

W/O : 20541473

 

Notify : 1000607920

south

Water and sewerage

Unplanned - Water Interruption - Nerang

3.30pm - 4.00pm

Streets affected: Cameron Close

Cause: Water Leak

W/O: 20541771

Notif: 1000608279

central

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 326 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 310 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 245 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 128 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 126 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Southport

Day 122 of 123

Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue

 

Show more

Start date: 5 June 2019

End date: 5 October 2019

Duration: Midnight 11:59pm

Reason: Lateral shift of traffic for protection of culvert asset

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 92 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 85 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 79 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 72 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 65 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 61 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 54 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 54 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 54 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 54 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 54 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 54 of 54

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Admiralty Drive and Tedder Avenue - Northern Bridge

 

Show more

Start date: 12 August 2019

End date: 4 October 2019

Duration: 9:00am 3.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 54 of 54

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Admiralty Drive and Tedder Avenue - Northern Bridge

 

Show more

Start date: 12 August 2019

End date: 4 October 2019

Duration: 9:00am 3.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 50 of 50

Streets affected: Gold Coast Highway (bike lane, lane closure with hold and release for 2 minutes maximum) between Ferney Avenue and Admiralty Drive - Southern Bridge

 

Show more

Start date: 16 August 2019

End date: 4 October 2019

Duration: 9:00am 2.30pm

Reason: Undertake bridge maintenance works

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 47 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 47 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 40 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 39 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 39 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 39 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 39 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 38 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 33 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 32 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 32 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 32 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 32 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 27 of 31

Streets affected: Old Burleigh Road (lane closure) between Wharf Road and Fern Street

Show more

Start date: 8 September 2019

End date: 8 October 2019

Duration: 6.30am - 6.30pm

Reason: Movement of construction vehicles and materials to site.

central

Road closures

Planned - Temporary Road Closure - Robina

Day 26 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 26 of 26

Streets affected: Surf Parade (lane closure) between Victoria Avenue and Charles Avenue

Show more

Start date: 9 September 2019

End date: 4 October 2019

2 weeks between dates                  

Duration: 9am - 4pm (Mon-Fri) and 7pm - 6am (Mon-Wed)

Reason: Installation of palms and landscaping to centre median

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 19 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 18 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 16 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 15 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 14 of 16

Streets affected: Somerset Drive (lane closure) between Gemvale Drive and Leviathan Drive

Show more

Start date: 21 September 2019

End date: 6 October 2019

Duration: 7am - 5pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 12 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 12 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 12 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 12 of 13

Streets affected: Somerset Drive (half road closure with hold and release for 2 minutes maximum) between Swanton Drive and Gemvale Road

Show more

Start date: 23 September 2019

End date: 5 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

hinterland

Road closures

Planned - Temporary Road Closure - Tugun

Day 12 of 12

Streets affected: Golden Four Drive (lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Short Street and Mills Street

Show more

Start date: 23 September 2019

End date: 4 October 2019

Duration: 7am – 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 12 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure Carrara

Day 11 of 15

Streets affected: Nielsens Road (lane closure) between Birmingham Road and Nerang-Broadbeach Road

Show more

Start date: 23 September 2019

End date: 8 October 2019

Duration: 6pm - 6am

(3 shifts over period)

Reason: Road profiling and asphalt works

central

Road closures

Planned - Temporary Road Closure - Pimpama

Day 11 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 10 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 10 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Merrimac

Day 9 of 9

Streets affected: Bourton Road (half road closure with hold and release for 2 minutes maximum) between Gooding Drive and Willunga Place

Show more

Start date: 23 September 2019

End date: 4 October 2019 (1 x shift only)

Duration: 7am - 6pm

Reason: Pavement investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 8 of 8

Streets affected: Boulton Drive (half road closure with hold and release for 2 minutes maximum) between Nerang Broadbeach Road and Railway Station carpark

Show more

Start date: 27 September 2019

End date: 4 October 2019

Duration: 7.30am - 3pm

Reason: Pavement testing

hinterland

Road closures

Planned - Temporary Road Closure Bundall

Day 5 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 5 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 5 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 5 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 5 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 5 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Chevron Island

Day 5 of 8

Streets affected: Mawarra Street (half road closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 30 September 2019

End date: 7 October 2019

Duration: 6.30am - 5pm

Reason: To facilitate installation of new street lights, cabling and testing

central

Road closures

Planned - Temporary Road Closure Stapylton

Day 5 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 5 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Coomera

Day 5 of 5

Streets affected: Amity Road (half road closure with hold and release for 2 minutes maximum) between Gillian Drive and Edwardson Drive / O'Rilly Drive

Show more

Start date: 30 September 2019

End date: 4 October 2019

Duration: 7am - 5pm (school holidays)

Reason: Install coloured surfacing works (1 day only over period)                

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 5 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 5 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Robina

Day 4 of 8

Streets affected: Robina Parkway (half road closure with hold and release for 2 minutes maximum) between Markeri Street and Boowaggan Road

 

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Robina

Day 4 of 8

Streets affected: Markeri Street (half road closure with hold and release for 2 minutes maximum) between Robina Parkway and Caulfield Street

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 4 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 4 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 4 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 3 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 2 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Water and sewerage

Planned - Water Interruption - Tallebudgera

9.00am - 2.00pm

Streets affected: Sullivan Road, Heather Street, Daffodil Street, Larch Street, Elm Court, Fenton Drive, Tallebudgera Connection Road, Tallebudgera Creek Road

Cause: Fire hydrant replacement

W/O: 60006796

Notif: 1000603625

south

Water and sewerage

Planned - Water Interruption - Surfers Paradise

9.00am - 2.00pm

Streets affected: The Esplanade, Ocean Avenue

Cause: Work on water main in this area

W/O: 52011900

Notif: 1000606069

Ispot/Pathway: WWS/2019/355

central

Water and sewerage

Planned - Water interruption - Ormeau

9.00am - 2.00pm

Streets affected: Serptine Street

Cause: Maintenance work on water main

W/O: 20526948

Notif: 1000590450

Ispot/Pathway: 74590494

north

 
5 Oct - Saturday
Water and sewerage

Unplanned - Water Interruption - Southport

12.20pm - 2.20pm

Streets affected: High Street

Cause: Repair water service

W/O: 20542254

Notif: 1000608816

central

Water and sewerage

Unplanned - Water Interruption - Southport

Day 1 of 2

Streets affected: MaCarthur Parade

Cause: Water Leak

W/O: 20542280

Notif: 1000608849

central

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 327 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 311 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 246 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 129 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 127 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Southport

Day 123 of 123

Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue

 

Show more

Start date: 5 June 2019

End date: 5 October 2019

Duration: Midnight 11:59pm

Reason: Lateral shift of traffic for protection of culvert asset

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 93 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 86 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 80 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 73 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 66 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 62 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 55 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 55 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 55 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 55 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 55 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 48 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 48 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 41 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 40 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 40 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 40 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 40 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 39 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 34 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 33 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 33 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 33 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 33 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 28 of 31

Streets affected: Old Burleigh Road (lane closure) between Wharf Road and Fern Street

Show more

Start date: 8 September 2019

End date: 8 October 2019

Duration: 6.30am - 6.30pm

Reason: Movement of construction vehicles and materials to site.

central

Road closures

Planned - Temporary Road Closure - Robina

Day 27 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 20 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 19 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 17 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 16 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 15 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 15 of 16

Streets affected: Somerset Drive (lane closure) between Gemvale Drive and Leviathan Drive

Show more

Start date: 21 September 2019

End date: 6 October 2019

Duration: 7am - 5pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 13 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 13 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 13 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 13 of 13

Streets affected: Somerset Drive (half road closure with hold and release for 2 minutes maximum) between Swanton Drive and Gemvale Road

Show more

Start date: 23 September 2019

End date: 5 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

hinterland

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 13 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure Carrara

Day 12 of 15

Streets affected: Nielsens Road (lane closure) between Birmingham Road and Nerang-Broadbeach Road

Show more

Start date: 23 September 2019

End date: 8 October 2019

Duration: 6pm - 6am

(3 shifts over period)

Reason: Road profiling and asphalt works

central

Road closures

Planned - Temporary Road Closure - Pimpama

Day 12 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 11 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 11 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 6 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 6 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 6 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 6 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 6 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 6 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Chevron Island

Day 6 of 8

Streets affected: Mawarra Street (half road closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 30 September 2019

End date: 7 October 2019

Duration: 6.30am - 5pm

Reason: To facilitate installation of new street lights, cabling and testing

central

Road closures

Planned - Temporary Road Closure Stapylton

Day 6 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 6 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 6 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 6 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Robina

Day 5 of 8

Streets affected: Robina Parkway (half road closure with hold and release for 2 minutes maximum) between Markeri Street and Boowaggan Road

 

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Robina

Day 5 of 8

Streets affected: Markeri Street (half road closure with hold and release for 2 minutes maximum) between Robina Parkway and Caulfield Street

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 5 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 5 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 5 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 4 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 3 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

 
6 Oct - Sunday
Water and sewerage

Unplanned - Water Interruption - Southport

Day 2 of 2

Streets affected: MaCarthur Parade

Cause: Water Leak

W/O: 20542280

Notif: 1000608849

central

Water and sewerage

Unplanned - Water Interruption - Bonogin

10.00am - 2.00pm

Streets affected: Bonogin Road,  Tulip Drive, Calanthe Lane, Magnolia Lane,Roxby Court, Carol-Anne Court

Cause: Repair water main

W/O: 20542276

Notif: 1000608843

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 328 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 312 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 247 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 130 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 128 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 94 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 87 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 81 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 74 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 67 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 63 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 56 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 56 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 56 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 56 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 56 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 49 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 49 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 42 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 41 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 41 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 41 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 41 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 40 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 35 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 34 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 34 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 34 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 34 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 29 of 31

Streets affected: Old Burleigh Road (lane closure) between Wharf Road and Fern Street

Show more

Start date: 8 September 2019

End date: 8 October 2019

Duration: 6.30am - 6.30pm

Reason: Movement of construction vehicles and materials to site.

central

Road closures

Planned - Temporary Road Closure - Robina

Day 28 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 21 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 20 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 18 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 17 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 16 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 16 of 16

Streets affected: Somerset Drive (lane closure) between Gemvale Drive and Leviathan Drive

Show more

Start date: 21 September 2019

End date: 6 October 2019

Duration: 7am - 5pm

Reason: Construction of signalised crossing, shared path, upgrade to driveway to shopping complex and tree removal from centre median

hinterland

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 14 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 14 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 14 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 14 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure Carrara

Day 13 of 15

Streets affected: Nielsens Road (lane closure) between Birmingham Road and Nerang-Broadbeach Road

Show more

Start date: 23 September 2019

End date: 8 October 2019

Duration: 6pm - 6am

(3 shifts over period)

Reason: Road profiling and asphalt works

central

Road closures

Planned - Temporary Road Closure - Pimpama

Day 13 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 12 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 12 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 7 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 7 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 7 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 7 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 7 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 7 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Chevron Island

Day 7 of 8

Streets affected: Mawarra Street (half road closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 30 September 2019

End date: 7 October 2019

Duration: 6.30am - 5pm

Reason: To facilitate installation of new street lights, cabling and testing

central

Road closures

Planned - Temporary Road Closure Stapylton

Day 7 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 7 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 7 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 7 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Robina

Day 6 of 8

Streets affected: Robina Parkway (half road closure with hold and release for 2 minutes maximum) between Markeri Street and Boowaggan Road

 

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Robina

Day 6 of 8

Streets affected: Markeri Street (half road closure with hold and release for 2 minutes maximum) between Robina Parkway and Caulfield Street

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 6 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 6 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 6 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 5 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 4 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Nobby Beach

8.00am - 9.00pm

Streets affected: Gold Coast Highway - Service Road (verge/footpath, parking lane/bays, full road closure) between Gold Coast Highway and Lavarack Road

Show more

Start date: 6 October 2019

End date: 6 October 2019

Duration: 8am – 9pm

Reason: Street Fiesta Nobby Beach EVENT

south

 
7 Oct - Monday
Water and sewerage

Unplanned - Water interruption - Helensvale

12.00pm - 4.00pm

Streets affected: Careel Close

Cause: Repair water main

W/O: 20542307

Notif: 1000608894

north

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 329 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 313 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 248 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 131 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 129 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 95 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 88 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 82 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 75 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 68 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 64 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 57 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 57 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 57 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 57 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 57 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 50 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 50 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 43 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 42 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 42 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 42 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 42 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 41 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 36 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 35 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 35 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 35 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 35 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 30 of 31

Streets affected: Old Burleigh Road (lane closure) between Wharf Road and Fern Street

Show more

Start date: 8 September 2019

End date: 8 October 2019

Duration: 6.30am - 6.30pm

Reason: Movement of construction vehicles and materials to site.

central

Road closures

Planned - Temporary Road Closure - Robina

Day 29 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 22 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 21 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 19 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 18 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 17 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 15 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 15 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 15 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 15 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure Carrara

Day 14 of 15

Streets affected: Nielsens Road (lane closure) between Birmingham Road and Nerang-Broadbeach Road

Show more

Start date: 23 September 2019

End date: 8 October 2019

Duration: 6pm - 6am

(3 shifts over period)

Reason: Road profiling and asphalt works

central

Road closures

Planned - Temporary Road Closure - Pimpama

Day 14 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 13 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 13 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 8 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 8 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 8 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 8 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 8 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 8 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Chevron Island

Day 8 of 8

Streets affected: Mawarra Street (half road closure with hold and release for 2 minutes maximum) between Thomas Drive and Stanhill Drive

Show more

Start date: 30 September 2019

End date: 7 October 2019

Duration: 6.30am - 5pm

Reason: To facilitate installation of new street lights, cabling and testing

central

Road closures

Planned - Temporary Road Closure Stapylton

Day 8 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 8 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 8 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 8 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Robina

Day 7 of 8

Streets affected: Robina Parkway (half road closure with hold and release for 2 minutes maximum) between Markeri Street and Boowaggan Road

 

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Robina

Day 7 of 8

Streets affected: Markeri Street (half road closure with hold and release for 2 minutes maximum) between Robina Parkway and Caulfield Street

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 7 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 7 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 7 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 6 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 5 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 1 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 1 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 1 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 1 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

 
8 Oct - Tuesday
Water and sewerage

Unplanned - Water Interruption - Coolangatta

9.00am - 10.00am

Streets affected: Garrick Street

Cause: Repair water service

W/O: 20540754

Notif: 1000607193

south

Water and sewerage

Unplanned - Water interruption - Bonogin

9.50am - 10.50am

Streets affected: Nicole Street

Cause: Repair water service

W/O: 20542419

Notif: 1000608981

south

Water and sewerage

Unplanned - Water interruption - Miami

1.00pm - 2.00pm

Streets affected: Albion Avenue, Bardon Avenue

Cause: Repair water service

W/O: 20542359

Notif: 1000608792

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 330 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 314 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 249 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 132 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 130 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 96 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 89 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 83 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 76 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 69 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 65 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 58 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 58 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 58 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 58 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 58 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 51 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 51 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 44 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 43 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 43 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 43 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 43 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 42 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 37 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 36 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 36 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 36 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 36 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 31 of 31

Streets affected: Old Burleigh Road (lane closure) between Wharf Road and Fern Street

Show more

Start date: 8 September 2019

End date: 8 October 2019

Duration: 6.30am - 6.30pm

Reason: Movement of construction vehicles and materials to site.

central

Road closures

Planned - Temporary Road Closure - Robina

Day 30 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 23 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 22 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 20 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 19 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 18 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 16 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 16 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 16 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 16 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure Carrara

Day 15 of 15

Streets affected: Nielsens Road (lane closure) between Birmingham Road and Nerang-Broadbeach Road

Show more

Start date: 23 September 2019

End date: 8 October 2019

Duration: 6pm - 6am

(3 shifts over period)

Reason: Road profiling and asphalt works

central

Road closures

Planned - Temporary Road Closure - Pimpama

Day 15 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 14 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 14 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 9 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 9 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 9 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 9 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 9 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 9 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 9 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 9 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 9 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 9 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Robina

Day 8 of 8

Streets affected: Robina Parkway (half road closure with hold and release for 2 minutes maximum) between Markeri Street and Boowaggan Road

 

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Robina

Day 8 of 8

Streets affected: Markeri Street (half road closure with hold and release for 2 minutes maximum) between Robina Parkway and Caulfield Street

Show more

Start date: 30 September 2019

End date: 8 October 2019

Duration: 6.30pm - 5am

Reason: Asphalt resurfacing works                 

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 8 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 8 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 8 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 7 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 6 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 2 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 2 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 2 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 2 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 5

Streets affected: Ocean Street (half road closure with hold and release for 2 minutes maximum) between Stradbroke Street and Bayview Street

Show more

Start date: 8 October 2019

End date: 12 October 2019

Duration: 6.30am - 6.30pm

Reason: Construction works

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 1 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 1 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Water and sewerage

Planned - Water Interruption - Coolangatta

9.00am - 2.00pm

Streets affected: Appel Street, Coolangatta Road

Cause: Fire hydrant replacement

W/O: 60006796

Notif: 1000603626

south

Water and sewerage

Planned - Water Interruption - Palm Beach

9.00am - 2.00pm

Streets affected: Murlong Crescent

Cause: Water meter installation

W/O: 60007055

Notif: 1000598859

Ispot/Pathway: 74576680

south

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 15

Streets affected: Enid Avenue (full road closure local traffic access only) between Alicia Street and Virginia Grove

Show more

Start date: 8 October 2019

End date: 22 October 2019

Duration: 6.30pm - 6.30am

Reason: Replacement of existing defective water main under the road

central

 
9 Oct - Wednesday
Water and sewerage

Unplanned - Water Interruption Nerang

6.45am - 11.45am

Streets affected: Klein Street, Colrene Drive

Cause: Repair water main

W/O 20542621

central

Water and sewerage

Unplanned - Water Interruption - Southport

2.30pm - 7.00pm

Streets affected: Mungo Place

Cause: Repair water main

W/O: 20542910

Notif: 1000609543

central

Water and sewerage

Unplanned - Water interruption - Mermaid Beach

Day 1 of 2

Streets Affected : Alexandra Avenue.

Causes : Repair to Hydrant.

W/O : 20542776

Notif : 1000609388

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 331 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 315 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 250 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 133 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 131 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 97 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 90 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 84 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 77 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 70 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 66 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 59 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 59 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 59 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 59 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 59 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 52 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 52 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 45 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 44 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 44 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 44 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 44 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 43 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 38 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 37 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 37 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 37 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 37 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure - Robina

Day 31 of 31

Streets affected: Centreline Place (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Promethean Way and End of road

Show more

Start date: 9 September 2019

End date: 9 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate safe movement during construction

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 24 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 23 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 21 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 20 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 19 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 17 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 17 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 17 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 17 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 16 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 15 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 15 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 10 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 10 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 10 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 10 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 10 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 10 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 10 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 10 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 10 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 10 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 9 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 9 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 9 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 8 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 7 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 3 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 3 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 3 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 3 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 5

Streets affected: Ocean Street (half road closure with hold and release for 2 minutes maximum) between Stradbroke Street and Bayview Street

Show more

Start date: 8 October 2019

End date: 12 October 2019

Duration: 6.30am - 6.30pm

Reason: Construction works

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 2 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 2 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 15

Streets affected: Enid Avenue (full road closure local traffic access only) between Alicia Street and Virginia Grove

Show more

Start date: 8 October 2019

End date: 22 October 2019

Duration: 6.30pm - 6.30am

Reason: Replacement of existing defective water main under the road

central

Road closures

Planned - Temporary Road Closure Burleigh Heads

2.33am

all regions

Road closures

Planned - Temporary Road Closure Burleigh Heads

2.33am

all regions

Water and sewerage

Planned - Water interruption - Ashmore

4.30am - 5.00am


Streets Affected : Commercial Dr .

Causes : Repair to Hydrant.

W/O : 20542351.

Notif : 1000608918.

central

Water and sewerage

Planned - Water Interruption - Tugun

9.00am - 2.00pm

Streets affected: Croft Court, Mirreen Drive, Alinjarra Drive, Clancy Court, Pimpala Court, Cocararra Court, Dinjirra Court, Elowra Court, Coolamon Court, Boorala Court

Cause: Fire hydrant replacement

W/O: 60006796

Notif: 1000603629

south

Water and sewerage

Planned - Water Interruption - Mudgeeraba

9.00am - 2.00pm

Streets affected: Pharlap Avenue

Cause: Replace water main

W/O: 52011911

Notif: 1000608292

central

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 1 of 24

Streets affected: Oceanic Drive (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard and Launch Drive

Show more

Start date: 9 October 2019

End date: 1 November 2019

Duration: 9am - 2.30pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 1 of 41

Streets affected: Reserve Road (half road closure with hold and release for 2 minutes maximum) between Brygon Creek Road and Kaizlee Crescent

Show more

Start date: 9 October 2019

End date: 18 November 2019

Duration: 9am - 2pm

Reason: Repairs to island after motor vehicle collision

north

Water and sewerage

Planned - Water interruption - Mermaid Beach

9.00pm - 11.00pm

Streets affected: Francis Street, Gold Coast Highway, Hedges Avenue

Cause: Repair water hydrants

W/O: 20518946

Notif: 1000581162

Ispot/Pathway: 74593682

south

Water and sewerage

Planned - Water interruption - Molendinar

Day 1 of 2

Streets affected: Kamholtz Court, Shepard Place

Cause: Maintenance work on water main

W/O: 60006040

Notif: 1000523125

Ispot/Pathway: 74599916

Show more

Start time and date: 10.00pm, 9,  October 2019

End time and date: 3.00am, 10  October 2019

central

Water and sewerage

Planned - Water interruption - Bilinga

Day 1 of 2

Streets affected: Golden Four Drive between George Street and Surf Street, Matters Street, Gibson Street, Mills Street,Coolangatta Rd.

Cause: Repair water hydrants

W/O: 30063093

Notif: 1000574720

Ispot/Pathway: 74596885

Show more

Start time and date: 11.00pm, 9, October  2019

End time and date: 4.00am, 10,  October  2019

south

 
10 Oct - Thursday
Water and sewerage

Unplanned - Water interruption - Mermaid Beach

Day 2 of 2

Streets Affected : Alexandra Avenue.

Causes : Repair to Hydrant.

W/O : 20542776

Notif : 1000609388

south

Water and sewerage

Unplanned - Water Interruption - Mermaid Beach

8.30am - 9.30am

Streets affected: Albatross Avenue

Cause: Repair water hydrant

W/O: 20540859

Notif: 1000607309

south

Water and sewerage

Unplanned - Water Interruption Mermaid Beach

10.00am - 11.00am

Streets affected: Beelyu Street

Cause: Repair water service

W/O. 20529889

south

Water and sewerage

Unplanned - Water Interruption - Mudgeeraba

10.20am - 11.20am

Streets affected: Belmont Park Drive

Cause: Repair water service

W/O: 20534798

Notif: 1000600125

south

Water and sewerage

Unplanned - Water interruption - Bonogin

12.00pm - 1.00pm

Streets affected: Glenmore Drive, Moondance Court, Verdure Place, Gaw Terrace, Calala Court

Cause: Pressure reduction valve repairs

W/O: 20543268

Notif: 1000610015

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 332 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 316 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 251 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 134 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 132 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 98 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 91 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 85 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 78 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 71 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 67 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 60 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 60 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 60 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 60 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 60 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 53 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 53 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure - Arundel

Day 46 of 46

Streets affected: Arundel Drive (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Napper Road and Neri Crescent

Show more

Also affected: Napper Road (half road, bike lane, verge/footpath closure with hold and release for 2 minutes maximum) between Woodland Way and Uplands Drive

Start date: 26 August 2019

End date: 10 October 2019

Duration: 9am – 2pm

Reason: To facilitate installation of new school sign

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 45 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 45 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 45 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 45 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 44 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 39 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 38 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 38 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 38 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 38 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 25 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 24 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 22 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 21 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 20 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 18 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 18 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 18 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 18 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 17 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 16 of 16

Streets affected: Albert Street (full road closure local traffic access only) between Hayle Street and Julia Street

 

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 16 of 16

Streets affected: Julia Street (full road closure local traffic access only) between Albert Street and George Street

Show more

Start date: 25 September 2019

End date: 10 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 11 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 11 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 11 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 11 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 11 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 11 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 11 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 11 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 11 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 11 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 10 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 10 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 10 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 9 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 8 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 4 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 4 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 4 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 4 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 5

Streets affected: Ocean Street (half road closure with hold and release for 2 minutes maximum) between Stradbroke Street and Bayview Street

Show more

Start date: 8 October 2019

End date: 12 October 2019

Duration: 6.30am - 6.30pm

Reason: Construction works

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 3 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 3 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 15

Streets affected: Enid Avenue (full road closure local traffic access only) between Alicia Street and Virginia Grove

Show more

Start date: 8 October 2019

End date: 22 October 2019

Duration: 6.30pm - 6.30am

Reason: Replacement of existing defective water main under the road

central

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 2 of 24

Streets affected: Oceanic Drive (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard and Launch Drive

Show more

Start date: 9 October 2019

End date: 1 November 2019

Duration: 9am - 2.30pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 2 of 41

Streets affected: Reserve Road (half road closure with hold and release for 2 minutes maximum) between Brygon Creek Road and Kaizlee Crescent

Show more

Start date: 9 October 2019

End date: 18 November 2019

Duration: 9am - 2pm

Reason: Repairs to island after motor vehicle collision

north

Water and sewerage

Planned - Water interruption - Molendinar

Day 2 of 2

Streets affected: Kamholtz Court, Shepard Place

Cause: Maintenance work on water main

W/O: 60006040

Notif: 1000523125

Ispot/Pathway: 74599916

Show more

Start time and date: 10.00pm, 9,  October 2019

End time and date: 3.00am, 10  October 2019

central

Water and sewerage

Planned - Water interruption - Bilinga

Day 2 of 2

Streets affected: Golden Four Drive between George Street and Surf Street, Matters Street, Gibson Street, Mills Street,Coolangatta Rd.

Cause: Repair water hydrants

W/O: 30063093

Notif: 1000574720

Ispot/Pathway: 74596885

Show more

Start time and date: 11.00pm, 9, October  2019

End time and date: 4.00am, 10,  October  2019

south

Road closures

Planned - Temporary Road Closure Coomera

Day 1 of 32

Streets affected: Lilly Pilly Drive (full road closure local traffic access only) between Finnegan Way and Christine Drive

Show more

Start date: 10 October 2019

End date: 10 November 2019

Duration: 12am - 11.59pm

Reason: Excavations for stormwater connections, property crossovers and service connections

north

Water and sewerage

Planned - Water Interruption - Tugun

9.00am - 3.15pm

Streets affected: Marion Street, Toolona Street, Cherub Street, Chaffey Street, Station Street

Cause: Fire hydrant replacement

W/O: 60006796

Notif: 1000603631

south

Water and sewerage

Planned - Water interruption - Yatala

Day 1 of 2

Streets affected: Pearson Road

Cause: Water main works

Ispot/Pathway: 

W/O: 52010958

Notif: 1000566426

Show more

Start time and date: 4.30pm, 10 October 2019

End time and date: 4.30am, 11 October 2019

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 1 of 16

Streets affected: Coolangatta Road (full road closure local traffic access only) between Haig Street and Creek Street

Show more

Start date: 10 October 2019

End date: 25 October 2019 (3 shifts between dates)

Duration: 6pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 0 of 48

Streets affected: Napper Road and Captain Cook Drive (half road closure with hold and release for 2 minutes maximum) between:

1. Allied Drive and Woodlands Way

2. Napper Road and Captain Cook Drive

Show more

Start date: 10 October 2019

End date: 27 November 2019

Duration: 7pm - 4am

Reason: Loop cutting works

north

 
11 Oct - Friday
Water and sewerage

Unplanned - Water Interruption - Coolangatta

12.00am - 3.00am

Streets Affected : Griffith St.

Causes : Broken Main.

W/O : 20542950

Notif : 1000609609

all regions

Water and sewerage

Unplanned - Water interruption - Tugun

10.10am - 11.10am

Streets affected: Kitchener Street

Cause: Repair water service

W/O: 60006819

Notif: 1000588804

south

Water and sewerage

Unplanned - Water Interruption - Runaway Bay

2.15pm - 3.15pm

Streets affected: Howard Street

Cause: Repair water service

W/O: 30069710

Notif: 1000599426

north

Water and sewerage

Unplanned - Water Interruption - Reedy Creek

8.40pm - 11.40pm

Streets affected: Gemvale Road

Cause: Repair hydrant

W/O 20543229

Notif 1000609972

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 333 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 317 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 252 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 135 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 133 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 99 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Burleigh Heads

Day 92 of 92

Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
 

Show more

Start date: 12 July 2019

End date: 11 October 2019

Duration: 1:00pm 5:00pm

Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 86 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 79 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 72 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 68 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 61 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 61 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 61 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 61 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 61 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 54 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 54 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 46 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 46 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 46 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 46 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 45 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 40 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 39 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 39 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 39 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 39 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 26 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 25 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 23 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 22 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 21 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 19 of 19

Streets affected: Gold Coast Highway between First Avenue and Wharf Road; Monaco Street between Gold Coast Highway and Savoy Drive (lane closure)

Show more

Start date: 23 September 2019

End date: 11 October 2019

Duration: 12am – 4am

Reason: To facilitate line marking at intersection

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 19 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 19 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 19 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 18 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Bundall

Day 12 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 12 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 12 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 12 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 12 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 12 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 12 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 12 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 12 of 12

Streets affected: Sunshine Boulevard (half road closure with hold and release for 2 minutes maximum) between Bordeaux Parade and Gretel Drive

 

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 12 of 12

Streets affected: Surfers Avenue (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard nad Vatakoula Parade

Show more

Start date: 30 September 2019

End date: 11 October 2019

Duration: 9am - 4pm

Reason: Road pavement investigations for intersection upgrade to signalised traffic lights

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 11 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 11 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 11 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 10 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 9 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 5 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 5 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 5 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 5 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 5

Streets affected: Ocean Street (half road closure with hold and release for 2 minutes maximum) between Stradbroke Street and Bayview Street

Show more

Start date: 8 October 2019

End date: 12 October 2019

Duration: 6.30am - 6.30pm

Reason: Construction works

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 4 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 4 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 15

Streets affected: Enid Avenue (full road closure local traffic access only) between Alicia Street and Virginia Grove

Show more

Start date: 8 October 2019

End date: 22 October 2019

Duration: 6.30pm - 6.30am

Reason: Replacement of existing defective water main under the road

central

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 3 of 24

Streets affected: Oceanic Drive (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard and Launch Drive

Show more

Start date: 9 October 2019

End date: 1 November 2019

Duration: 9am - 2.30pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 3 of 41

Streets affected: Reserve Road (half road closure with hold and release for 2 minutes maximum) between Brygon Creek Road and Kaizlee Crescent

Show more

Start date: 9 October 2019

End date: 18 November 2019

Duration: 9am - 2pm

Reason: Repairs to island after motor vehicle collision

north

Road closures

Planned - Temporary Road Closure Coomera

Day 2 of 32

Streets affected: Lilly Pilly Drive (full road closure local traffic access only) between Finnegan Way and Christine Drive

Show more

Start date: 10 October 2019

End date: 10 November 2019

Duration: 12am - 11.59pm

Reason: Excavations for stormwater connections, property crossovers and service connections

north

Water and sewerage

Planned - Water interruption - Yatala

Day 2 of 2

Streets affected: Pearson Road

Cause: Water main works

Ispot/Pathway: 

W/O: 52010958

Notif: 1000566426

Show more

Start time and date: 4.30pm, 10 October 2019

End time and date: 4.30am, 11 October 2019

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 2 of 16

Streets affected: Coolangatta Road (full road closure local traffic access only) between Haig Street and Creek Street

Show more

Start date: 10 October 2019

End date: 25 October 2019 (3 shifts between dates)

Duration: 6pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 1 of 48

Streets affected: Napper Road and Captain Cook Drive (half road closure with hold and release for 2 minutes maximum) between:

1. Allied Drive and Woodlands Way

2. Napper Road and Captain Cook Drive

Show more

Start date: 10 October 2019

End date: 27 November 2019

Duration: 7pm - 4am

Reason: Loop cutting works

north

Road closures

Planned - Temporary Road Closure Kingsholme

Day 1 of 8

Streets affected: Tillyroen Road and Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between :

1. Mirambeena Drive and McReadie Road

2. Tillyroen Road and Landsdowne Drive

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 4.30pm

Reason: Works for intersection upgrade

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 1 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Quinns Hill Road East

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 5pm

Reason: Pavement testing (one shift only between dates)

south

Road closures

Planned - Temporary Road Closures - Burleigh Heads

Day 1 of 5

Streets affected: Brake Street (full road closure with detours) between Gold Coast Highway and Ocean Street

Show more

Start date: 11 October 2019

End date: 15 October 2019

Duration: 8am – 5pm

Reason: To allow works on roof patios of the Swell Apartments

south

Water and sewerage

Planned - Water Interruption - Tugun

9.00am - 2.00pm

Streets affected: Illawarra Court, Bob Barnard Drive, Toolona Street

Cause: Fire hydrant replacement

W/O: 60006796

Notif: 1000603633

south

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 21

Streets affected: Christine Avenue (lane closure) between Konda Way and Olympus Drive

Show more

Start date: 11 October 2019

End date: 31 October 2019

Duration: 9am - 2.30pm

Reason: Construction of a new bus stop

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 8

Streets affected: Entertainment Road (half road closure with hold and release for 2 minutes maximum) between Binstead Way and Roadshow Way

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 11am - 3pm

Reason: Pavement testing works

north

 
12 Oct - Saturday
Water and sewerage

Unplanned - Water Interruption - Nerang

10.00am - 3.00pm

Streets affected: Dell Court, Donilla Place

Cause: Water Leak

W/O: 20543530

Notif: 1000610373

central

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 334 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 318 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 253 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 136 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 134 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 100 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 87 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 80 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 73 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Upper Coomera

Day 69 of 69

Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road

 

Show more

Start date: 5 August 2019

End date: 12 October 2019

Duration: Midnight 11.59pm

Reason: Road upgrade outside new development site

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 62 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 62 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 62 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 62 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 62 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 55 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 55 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 47 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 47 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 47 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 47 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 46 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 41 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 40 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 40 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 40 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 40 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 27 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 26 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 24 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 23 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 22 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 20 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 20 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 20 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 19 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Bundall

Day 13 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 13 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 13 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 13 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 13 of 13

Streets affected: Willow Street (full road closure local traffic access only) between Coolibah Crescent and Eucalyptus Avenue

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 13 of 13

Streets affected: Wattle Street (full road closure local traffic access only) between Willow Street and End of Street

Show more

Start date: 30 September 2019

End date: 12 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 13 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 13 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 12 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 12 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 12 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 12 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 12 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 12 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 12 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 11 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 10 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 6 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 6 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 6 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 6 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 5

Streets affected: Ocean Street (half road closure with hold and release for 2 minutes maximum) between Stradbroke Street and Bayview Street

Show more

Start date: 8 October 2019

End date: 12 October 2019

Duration: 6.30am - 6.30pm

Reason: Construction works

north

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 5 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 5 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 15

Streets affected: Enid Avenue (full road closure local traffic access only) between Alicia Street and Virginia Grove

Show more

Start date: 8 October 2019

End date: 22 October 2019

Duration: 6.30pm - 6.30am

Reason: Replacement of existing defective water main under the road

central

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 4 of 24

Streets affected: Oceanic Drive (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard and Launch Drive

Show more

Start date: 9 October 2019

End date: 1 November 2019

Duration: 9am - 2.30pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 4 of 41

Streets affected: Reserve Road (half road closure with hold and release for 2 minutes maximum) between Brygon Creek Road and Kaizlee Crescent

Show more

Start date: 9 October 2019

End date: 18 November 2019

Duration: 9am - 2pm

Reason: Repairs to island after motor vehicle collision

north

Road closures

Planned - Temporary Road Closure Coomera

Day 3 of 32

Streets affected: Lilly Pilly Drive (full road closure local traffic access only) between Finnegan Way and Christine Drive

Show more

Start date: 10 October 2019

End date: 10 November 2019

Duration: 12am - 11.59pm

Reason: Excavations for stormwater connections, property crossovers and service connections

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 3 of 16

Streets affected: Coolangatta Road (full road closure local traffic access only) between Haig Street and Creek Street

Show more

Start date: 10 October 2019

End date: 25 October 2019 (3 shifts between dates)

Duration: 6pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 2 of 48

Streets affected: Napper Road and Captain Cook Drive (half road closure with hold and release for 2 minutes maximum) between:

1. Allied Drive and Woodlands Way

2. Napper Road and Captain Cook Drive

Show more

Start date: 10 October 2019

End date: 27 November 2019

Duration: 7pm - 4am

Reason: Loop cutting works

north

Road closures

Planned - Temporary Road Closure Kingsholme

Day 2 of 8

Streets affected: Tillyroen Road and Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between :

1. Mirambeena Drive and McReadie Road

2. Tillyroen Road and Landsdowne Drive

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 4.30pm

Reason: Works for intersection upgrade

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 2 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Quinns Hill Road East

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 5pm

Reason: Pavement testing (one shift only between dates)

south

Road closures

Planned - Temporary Road Closures - Burleigh Heads

Day 2 of 5

Streets affected: Brake Street (full road closure with detours) between Gold Coast Highway and Ocean Street

Show more

Start date: 11 October 2019

End date: 15 October 2019

Duration: 8am – 5pm

Reason: To allow works on roof patios of the Swell Apartments

south

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 21

Streets affected: Christine Avenue (lane closure) between Konda Way and Olympus Drive

Show more

Start date: 11 October 2019

End date: 31 October 2019

Duration: 9am - 2.30pm

Reason: Construction of a new bus stop

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 8

Streets affected: Entertainment Road (half road closure with hold and release for 2 minutes maximum) between Binstead Way and Roadshow Way

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 11am - 3pm

Reason: Pavement testing works

north

Road closures

Planned - Temporary Road Closure Southport

11.00am - 11.59pm

Streets affected: Young Street and Davenport Street (full road closure local traffic access only) between :

1. Garden Street and Scarborough Street

2. Hinze Street and Young Street

Show more

Start date: 12 October 2019

End date: 12 October 2019

Duration: 11am - 11.59pm

Reason: EVENT - Moon Night Light Festival

central

Road closures

Planned - Temporary Road Closure Paradise Point

3.00pm - 11.59pm

Streets affected: The Esplanade (full road closure local traffic access only) between Bruce Avenue and Falkinder Avenue

Show more

Start date: 12 October 2019

End date: 12 October 2019

Duration: 3pm - 11.59pm

Reason: EVENT - Tastes of Paradise

north

 
13 Oct - Sunday
Water and sewerage

Unplanned - Water Interruption - Robina

3.45am - 7.30pm

Streets affected: Grenaside Court, Cottesloe Drive

Cause: Water Leak

W/O: 20543554

Notif: 1000610407

south

Water and sewerage

Unplanned - Water Interruption - Paradise Point

7.45am - 9.30am

Streets affected: Hume Parade, Wills Court

Cause: Water Leak

W/O: 20543556

Notif: 1000610409

north

Water and sewerage

Unplanned - Water Interruption - Elanora

12.55pm - 2.25pm

Streets affected: Cheshire Grove

Cause: Water Leak

W/O: 20543562

Notif: 1000610402

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 335 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 319 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 254 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 137 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 135 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 101 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 88 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 81 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 74 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 63 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 63 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 63 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 63 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 63 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 56 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Yatala

Day 56 of 56

Streets affected: Darlington Drive (half road closure with hold and release for 2 minutes maximum) between Pearson Road and Dixon Street 

Show more

Start date: 19 August 2019

End date: 13 October 2019

Duration: 6.30am - 6.30pm

Reason: Works to a high pressure gas main

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 48 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 48 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 48 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 48 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 47 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 42 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 41 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 41 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 41 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 41 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 28 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 27 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 25 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 24 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 23 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 21 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 21 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 21 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 20 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Bundall

Day 14 of 14

Streets affected: Ereton Drive (full road closure local traffic access only) between Olsen Avenue and Centre View Drive

Show more

Start date: 29 September 2019

End date: 13 October 2019

Duration: 6pm - 6am

Reason: Road treatment works

central

Road closures

Planned - Temporary Road Closure Pimpama

Day 14 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 14 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 14 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 14 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 14 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 13 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 13 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 13 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 13 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 13 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 13 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 13 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 12 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 11 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 7 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 7 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 7 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 7 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 6 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 6 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 15

Streets affected: Enid Avenue (full road closure local traffic access only) between Alicia Street and Virginia Grove

Show more

Start date: 8 October 2019

End date: 22 October 2019

Duration: 6.30pm - 6.30am

Reason: Replacement of existing defective water main under the road

central

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 5 of 24

Streets affected: Oceanic Drive (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard and Launch Drive

Show more

Start date: 9 October 2019

End date: 1 November 2019

Duration: 9am - 2.30pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 5 of 41

Streets affected: Reserve Road (half road closure with hold and release for 2 minutes maximum) between Brygon Creek Road and Kaizlee Crescent

Show more

Start date: 9 October 2019

End date: 18 November 2019

Duration: 9am - 2pm

Reason: Repairs to island after motor vehicle collision

north

Road closures

Planned - Temporary Road Closure Coomera

Day 4 of 32

Streets affected: Lilly Pilly Drive (full road closure local traffic access only) between Finnegan Way and Christine Drive

Show more

Start date: 10 October 2019

End date: 10 November 2019

Duration: 12am - 11.59pm

Reason: Excavations for stormwater connections, property crossovers and service connections

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 4 of 16

Streets affected: Coolangatta Road (full road closure local traffic access only) between Haig Street and Creek Street

Show more

Start date: 10 October 2019

End date: 25 October 2019 (3 shifts between dates)

Duration: 6pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 3 of 48

Streets affected: Napper Road and Captain Cook Drive (half road closure with hold and release for 2 minutes maximum) between:

1. Allied Drive and Woodlands Way

2. Napper Road and Captain Cook Drive

Show more

Start date: 10 October 2019

End date: 27 November 2019

Duration: 7pm - 4am

Reason: Loop cutting works

north

Road closures

Planned - Temporary Road Closure Kingsholme

Day 3 of 8

Streets affected: Tillyroen Road and Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between :

1. Mirambeena Drive and McReadie Road

2. Tillyroen Road and Landsdowne Drive

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 4.30pm

Reason: Works for intersection upgrade

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 3 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Quinns Hill Road East

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 5pm

Reason: Pavement testing (one shift only between dates)

south

Road closures

Planned - Temporary Road Closures - Burleigh Heads

Day 3 of 5

Streets affected: Brake Street (full road closure with detours) between Gold Coast Highway and Ocean Street

Show more

Start date: 11 October 2019

End date: 15 October 2019

Duration: 8am – 5pm

Reason: To allow works on roof patios of the Swell Apartments

south

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 21

Streets affected: Christine Avenue (lane closure) between Konda Way and Olympus Drive

Show more

Start date: 11 October 2019

End date: 31 October 2019

Duration: 9am - 2.30pm

Reason: Construction of a new bus stop

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 3 of 8

Streets affected: Entertainment Road (half road closure with hold and release for 2 minutes maximum) between Binstead Way and Roadshow Way

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 11am - 3pm

Reason: Pavement testing works

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 1 of 49

Streets affected: Kristins Lane (full road closure local traffic access only) between Kohl Street and Days Road

Show more

Start date: 13 October 2019

End date: 30 November 2019

Duration: 12am - 11.59pm

Reason: Road upgrade outside of development

north

Road closures

Planned - Temporary Road Closure Labrador

Day 1 of 69

Streets affected: Baker Avenue (half road closure with hold and release for 2 minutes maximum) between Frank Street and Proud Street

Show more

Start date: 13 October 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: To facilitate construction related activities

north

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 2

Streets affected: Musgrave Avenue West and East, Turpin Road, Brooke Avenue intersection (full road closure local traffic access only) between:

1. Chirn Crescent and Turpin Road

2. Clayton Street and Turpin Road

3. Musgrave Avenue and Chirn Crescent

4. Fisher Avenue and Musgrave Avenue

Show more

Start date: 13 October 2019

End date: 14 October 2019

Duration: 6.30pm - 4.30pm

Reason: Replacing overhead wires and power poles

central

 
14 Oct - Monday
Water and sewerage

Unplanned - Water Interruption - Ormeau Hills

9.15am - 10.15am

Streets affected: Terania Avenue

Cause: Repair water hydrant

W/O: 20535721

Notif: 1000600787

north

Water and sewerage

Unplanned - Water Interruption - Paradise Point

10.30am - 11.30am

Streets affected: Brittanic Crescent, King Arthurs Court, Queen Guineveres Place, Sir Lancelot Close, Sir galahad Close, The Peninsula

Cause: Repair water service

W/O: 30063044

Notif: 1000574525

north

Water and sewerage

Unplanned - Water Interruption : Miami

12.30pm - 2.30pm

Streets Affected : Gold Coast Hwy. Kelly Ave , The Esplande.

Causes : Repair Broken Main..

W/O : 20543781

Notif : 1000610584

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 336 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 320 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 255 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 138 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 136 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 102 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 89 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 82 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 75 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 64 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 64 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 64 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 64 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 64 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 57 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 49 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 49 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 49 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 49 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 48 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 43 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 42 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 42 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 42 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 42 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 29 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 28 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 26 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 25 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 24 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 22 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 22 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 22 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 21 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 15 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 15 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 15 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 15 of 15

Streets affected: Quinns Hill Road East (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Burnside Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 15 of 15

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road East and Stapylton Jacobs Well Road

 

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 6.30am - 6pm

Reason: Asphalt resurfacing works      

north

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 14 of 14

Streets affected: Mattocks Road (half road closure with hold and release for 2 minutes maximum) between Montezuma Drive and Rangeview Court

   

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 14 of 14

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Treetop Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 14 of 14

Streets affected: Lakeridge Drive (half road closure with hold and release for 2 minutes maximum) between Mattocks Road and Woodstone Court

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Asphalt resurfacing works                     

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 14 of 14

Streets affected: Christine Avenue (lane closure) between Silvabank Drive and Southport Burleigh Road

Show more

Start date: 30 September 2019

End date: 14 October 2019

Duration: 7pm - 5am

Reason: Profiling, sealing and resurfacing of roadway pavement

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 14 of 14

Streets affected: Leo Graham Way and Cottonwood Place (full road closure local traffic access only) between:

1. Tamborine Oxenford Way and Old Pacific Highway

2. Leo Graham Way and End of road

Show more

Start date: 30 September 2019

End date: 14 October 2019 (excluding Thu nights)

Duration: 8pm - 6am

Reason: Asphalt resurfacing works

north

Road closures

Planned - Temporary Road Closure Miami

Day 14 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 14 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 13 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 12 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 8 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 8 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 8 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 8 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 7 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 7 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 15

Streets affected: Enid Avenue (full road closure local traffic access only) between Alicia Street and Virginia Grove

Show more

Start date: 8 October 2019

End date: 22 October 2019

Duration: 6.30pm - 6.30am

Reason: Replacement of existing defective water main under the road

central

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 6 of 24

Streets affected: Oceanic Drive (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard and Launch Drive

Show more

Start date: 9 October 2019

End date: 1 November 2019

Duration: 9am - 2.30pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 6 of 41

Streets affected: Reserve Road (half road closure with hold and release for 2 minutes maximum) between Brygon Creek Road and Kaizlee Crescent

Show more

Start date: 9 October 2019

End date: 18 November 2019

Duration: 9am - 2pm

Reason: Repairs to island after motor vehicle collision

north

Road closures

Planned - Temporary Road Closure Coomera

Day 5 of 32

Streets affected: Lilly Pilly Drive (full road closure local traffic access only) between Finnegan Way and Christine Drive

Show more

Start date: 10 October 2019

End date: 10 November 2019

Duration: 12am - 11.59pm

Reason: Excavations for stormwater connections, property crossovers and service connections

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 5 of 16

Streets affected: Coolangatta Road (full road closure local traffic access only) between Haig Street and Creek Street

Show more

Start date: 10 October 2019

End date: 25 October 2019 (3 shifts between dates)

Duration: 6pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 4 of 48

Streets affected: Napper Road and Captain Cook Drive (half road closure with hold and release for 2 minutes maximum) between:

1. Allied Drive and Woodlands Way

2. Napper Road and Captain Cook Drive

Show more

Start date: 10 October 2019

End date: 27 November 2019

Duration: 7pm - 4am

Reason: Loop cutting works

north

Road closures

Planned - Temporary Road Closure Kingsholme

Day 4 of 8

Streets affected: Tillyroen Road and Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between :

1. Mirambeena Drive and McReadie Road

2. Tillyroen Road and Landsdowne Drive

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 4.30pm

Reason: Works for intersection upgrade

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 4 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Quinns Hill Road East

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 5pm

Reason: Pavement testing (one shift only between dates)

south

Road closures

Planned - Temporary Road Closures - Burleigh Heads

Day 4 of 5

Streets affected: Brake Street (full road closure with detours) between Gold Coast Highway and Ocean Street

Show more

Start date: 11 October 2019

End date: 15 October 2019

Duration: 8am – 5pm

Reason: To allow works on roof patios of the Swell Apartments

south

Road closures

Planned - Temporary Road Closure Robina

Day 4 of 21

Streets affected: Christine Avenue (lane closure) between Konda Way and Olympus Drive

Show more

Start date: 11 October 2019

End date: 31 October 2019

Duration: 9am - 2.30pm

Reason: Construction of a new bus stop

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 4 of 8

Streets affected: Entertainment Road (half road closure with hold and release for 2 minutes maximum) between Binstead Way and Roadshow Way

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 11am - 3pm

Reason: Pavement testing works

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 2 of 49

Streets affected: Kristins Lane (full road closure local traffic access only) between Kohl Street and Days Road

Show more

Start date: 13 October 2019

End date: 30 November 2019

Duration: 12am - 11.59pm

Reason: Road upgrade outside of development

north

Road closures

Planned - Temporary Road Closure Labrador

Day 2 of 69

Streets affected: Baker Avenue (half road closure with hold and release for 2 minutes maximum) between Frank Street and Proud Street

Show more

Start date: 13 October 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: To facilitate construction related activities

north

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 2

Streets affected: Musgrave Avenue West and East, Turpin Road, Brooke Avenue intersection (full road closure local traffic access only) between:

1. Chirn Crescent and Turpin Road

2. Clayton Street and Turpin Road

3. Musgrave Avenue and Chirn Crescent

4. Fisher Avenue and Musgrave Avenue

Show more

Start date: 13 October 2019

End date: 14 October 2019

Duration: 6.30pm - 4.30pm

Reason: Replacing overhead wires and power poles

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 12

Streets affected: Ocean Street (full road closure local traffic access only) between Stradbroke Street and Bayview Street

Show more

Start date: 14 October 2019

End date: 25 October 2019

Duration: 6.30am - 6.30pm

Reason: Closure to facilitate large deliveries, crane hoisting and concrete pours

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 1 of 7

Streets affected: Boundary Street (lane closure) between Hill Street and Ward Street

Show more

Start date: 14 October 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Reconstruction of road pavement and footpath

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 1 of 15

Streets affected: Hayle Street (full road closure local traffic access only) between Goodwin Terrace and Albert Street

Show more

Start date: 14 October 2019

End date: 28 October 2019 

(3 shifts between dates)

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 1 of 12

Streets affected: Garrick Street (full road closure local traffic access only) between Tweed Street and Lanham Street

Show more

Start date: 14 October 2019

End date: 25 October 2019

(3 days between dates)

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Water and sewerage

Planned - Water Interruption : Surfers Paradise.

1.10pm - 2.10pm

Streets Affected : Amalfi Drive.

Causes : Repair Hydrant .

W/O : 20542775

Notif : 1000609389

south

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 15

Streets affected: Intersection of Kumbari Avenue and Johnson Street (lane closure) between Smith Street and Sungold Avenue

Show more

Start date: 14 October 2019

End date: 28 October 2019

2 shifts only between dates                  

Duration: 7pm - 4.30am

Reason: Loop cutting works

central

 
15 Oct - Tuesday
Water and sewerage

Unplanned - Water Interruption Nerang

12.00am - 1.30am

Streets affected: Ferry Street

Cause: Repair water main

W/O. 20543788

hinterland

Water and sewerage

Unplanned - Water Interruption Talllai

12.20am - 2.20am

Streets affected: Tarawara Avenue

Cause: Repar water service

W/O. 20542501

hinterland

Water and sewerage

Unplanned - Water Interruption - Gaven

8.45am - 9.45am

Streets affected: Peony Way

Cause: Repair water main

W/O: 20543607

Notif: 1000610427

central

Water and sewerage

Unplanned - Water Interruption - Mermaid Waters

9.10am - 9.40am

Streets affected: Launch Road, Hood Court, Ketch Court, Cruiser Court

Cause: Repair water service

W/O: 20542464

Notif: 1000609014 

south

Water and sewerage

Unplanned - Water Interruption - Nerang

10.00am - 11.00am

Streets affected: Wundowie Street

Cause: Repair water service

W/O: 60007200

Notif: 1000610832

central

Water and sewerage

Unplanned - Water Interruption - Palm Beach

10.10am - 10.40am

Streets affected: Murlong Crescent

Cause: Repair water service

W/O: 60007055

Notif: 1000598859

south

Water and sewerage

Unplanned - Water interruption - Mermaid Waters

2.30pm - 3.45pm

Streets affected: Port Drive

Cause: Water Leak

W/O: 60007173

Notif: 1000609371

 

south

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 337 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 321 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 256 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 139 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 137 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 103 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 90 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 83 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 76 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 65 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 65 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Glen Circuit

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 65 of 96

Streets affected: Cladiara Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Clagiraba Road and cul-de-sac

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 65 of 96

Streets affected: Nerang Murwillumbah Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Hidden Woods and Mount Nathan Road

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 65 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Nerang Murwillumbah Road and Cladiara Road

 

Show more

Start date: 12 August 2019

End date: 15 November 2019

Duration: 6:30am 4.00pm

Reason: Installation of ITS flooded road signage

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 58 of 551

Streets affected: Gold Coast Highway (lane, shoulder, verge/footpath closure) between Clifford Street and Aubrey Street

Show more

Also affected: Markwell Avenue (full road closure - Western side of Remembrance Drive) between Remembrance Drive and End of road

Also affected: Via Roma (lane, verge/footpath, parking lane closure with hold and release for 2 minutes maximum) between Remembrance Drive and St Pauls Place

Start date: 19 August 2019

End date: 19 February 2021

Duration 1: 9am – 3pm (Gold Coast Highway)

Duration 2: 8pm - 5am (Markwell Avenue)

Duration 3: 12am - 11:59pm (Via Roma)

Reason: To facilitate the construction works on the Isle of Capri Decongestion Project

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 50 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 50 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 50 of 339

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Chevron Island

Day 50 of 51

Streets affected: Weemala Street (half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive   

Show more

Start date: 27 August 2019

End date: 16 October 2019

Duration: 6.30am - 6.30pm

Reason: Ingress/egress, large deliveries and concrete pours on site

central

Road closures

Planned - Temporary Road Closure - Coomera

Day 49 of 62

Streets affected: Amity Road (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Kerknin Road South / Finnegan Way and O'Reilly Drive / Edwardson Drive

 

Show more

Start date: 28 August 2019

End date: 28 October 2019

Duration: 9:00am 2:30pm (school days) and 8:00am - 2:30pm (other days)

Reason: Installation of new school signs

north

Road closures

Planned - Temporary Road Closure - Helensvale

Day 44 of 59

Streets affected: Forest Court (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Emerald Drive and Olive Street

Show more

Start date: 2 September 2019

End date: 30 October 2019

Duration: 6:30am – 6:30pm

Reason: To facilitate the construction of civil works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 43 of 332

Streets affected: Dreamworld Parkway (lane closure) between Nells Court and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 43 of 332

Streets affected: Old Pacific Highway (lane closure) between Global Plaza and Tamborine Oxenford Road

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 43 of 332

Streets affected: Old Pacific Highway (lane closure) between Tamborine Oxenford Road and Watersports Lane

Show more

Start date: 26 August 2019

End date: 30 July 2020

Duration: 8pm - 5am

Reason: Exit 57 /Tamborine Oxenford Road upgrade works

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 43 of 59

Streets affected: Eastern Service Road (half road closure with hold and release for 2 minutes maximum) between Christensen Road and Burnside Road

Show more

Start date: 3 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Blasting works, construction of side track

north

Road closures

Planned - Temporary Road Closure - Bundall

Day 30 of 62

Streets affected: Racecourse Drive (half road closure with hold and release for 2 minutes maximum) between Waterford Court and Heeb Street

Show more

Start date: 16 September 2019

End date: 16 November 2019

Duration: 7am – 5pm

Reason: To facilitate the ease of access to Gas Release Pit

north

Road closures

Planned - Temporary Road Closure Lower Beechmont

Day 29 of 45

Streets affected: North Road (half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue

Show more

Start date: 17 September 2019

End date: 31 October 2019

Duration: 12am - 11.59pm

Reason: Reconstruction of retaining wall

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 27 of 93

Streets affected: Kopps Road (half road closure with hold and release for 2 minutes maximum) between Yallaroi Road and Michigan Drive (roundabout)

Show more

Start date: 19 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 26 of 92

Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway

Show more

Start date: 20 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 25 of 91

Streets affected: 12-18 Philip Avenue (half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road

Show more

Start date: 21 September 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Construction activities

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 23 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 23 of 89

Streets affected: Marine Parade (half road closure with hold and release for 2 minutes maximum) between Rutledge Street and McLean Street

Show more

Start date: 23 September 2019

End date: 20 December 2019

Duration: 12am - 11.59pm

Reason: Location of site compound

south

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 23 of 124

Streets affected: Christine Avenue (lane closure) between Bridgewater Drive and Gold Coast Highway

Show more

Start date: 23 September 2019

End date: 24 January 2020

Duration: 9am - 4pm (9am-2.30pm during school term)

Reason: Mobile pavement data collection and pit installation

south

Road closures

Planned - Temporary Road Closure - Pimpama

Day 22 of 31

Streets affected: Yawalpah Road between Dixon Drive and Cox Road; Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)

Show more

Start date: 24 September 2019

End date: 24 October 2019

Duration: 9am – 3pm

Reason: Installation of new footings for CCTV posts and to install new CCTV pole and cabling

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 16 of 86

Streets affected: Gawthern Drive (lane closure with detour) between McVeigh Street and Chrome Drive

Show more

Start date: 30 September 2019

End date: 24 December 2019

Duration: 12am - 11.59pm

Reason: Upgrade of residential area and road

north

Road closures

Planned - Temporary Road Closure Kirra

Day 16 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Kirra

Day 16 of 47

Streets affected: Marine Parade (full road closure local traffic access only) between McLean Street and Rutledge Street

Show more

Start date: 30 September 2019

End date: 15 November 2019

Duration: 12am - 11.59pm

Reason: Piling works

south

Road closures

Planned - Temporary Road Closure Miami

Day 15 of 98

Streets affected: Nundah Avenue (full road closure local traffic access only) between Nobby Parade and Evendale Crescent

Show more

Start date: 1 October 2019

End date: 6 January 2020

Duration: 6.30am - 5.30pm

Reason: Stormwater upgrade

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 15 of 31

Streets affected: Leyte Avenue (half road closure with hold and release for 2 minutes maximum) between Hawaii Avenue and Luzon Parade

Show more

Start date: 1 October 2019

End date: 31 October 2019

Duration: 6.30am - 5.30pm

Reason: Storm water upgrade

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 14 of 15

Streets affected: Old Pacific Highway (half road closure with hold and release for 2 minutes maximum) between Michigan Drive (roundabout) and Leo Graham Way

Show more

Start date: 2 October 2019

End date: 16 October 2019

Duration: 6pm - 6am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 13 of 65

Streets affected: Sunshine Boulevard (single lane closures of a multi-lane road - at least one lane in both directions along Sunshine Boulevard to be trafficable at all times) between Karbunya Street and Cadence Avenue

Show more

Start date: 3 October 2019

End date: 6 December

Duration: 7am - 2pm

Reason: New Sewer rising main works and investigation

south

Road closures

Planned - Temporary Road Closure - Bundall

Day 9 of 10

Streets affected: Ascot Court (full road, verge/footpath closure) between Racecourse Drive and End of road

Show more

Start date: 7 October 2019

End date: 16 October 2019

Duration: 6am – 6pm

Reason: Delivery of horses / livestock for the Magic Millions October 2019 sales

north

Road closures

Planned - Temporary Road Closure Miami

Day 9 of 13

Streets affected: Dawn Parade (full road closure local traffic access only) between Gold Coast Highway and Nobby Parade

 

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 9 of 13

Streets affected: Nobby Parade (full road closure local traffic access only) between Dawn Parade and Albion Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Miami

Day 9 of 13

Streets affected: Miami Shore Parade (full road closure local traffic access only) between Sunshine Parade and Chainey Avenue

Show more

Start date: 7 October 2019

End date: 19 October 2019

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 8 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Mosquito spraying

Planned - Pest Animal Trapping - Wongawallan Conservation Area, Crystal Creek Reserve, Upper Ormeau Conservation Area

Day 8 of 11

Areas affected: Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area.

Pest animal trapping will be carried out within Wongawallan Conservation Area (Kingsholme section, Upper Coomera section & Cedar Creek section), Crystal Creek Reserve (including Galt Road Park ridgeline track) and Upper Ormeau Conservation Area from 7.00am Tuesday 8th October 2019 to 11.59pm Friday 18th October 2019.  Consequently, entry to these areas will be prohibited.

Closed areas will be marked with a sign or barrier tape placed along entry tracks and will be permanently closed for the entire period, both day and night.

Please do not enter closed sections as penalties apply.

all regions

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 15

Streets affected: Enid Avenue (full road closure local traffic access only) between Alicia Street and Virginia Grove

Show more

Start date: 8 October 2019

End date: 22 October 2019

Duration: 6.30pm - 6.30am

Reason: Replacement of existing defective water main under the road

central

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 7 of 24

Streets affected: Oceanic Drive (half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevard and Launch Drive

Show more

Start date: 9 October 2019

End date: 1 November 2019

Duration: 9am - 2.30pm

Reason: Kerb and channel works

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 7 of 41

Streets affected: Reserve Road (half road closure with hold and release for 2 minutes maximum) between Brygon Creek Road and Kaizlee Crescent

Show more

Start date: 9 October 2019

End date: 18 November 2019

Duration: 9am - 2pm

Reason: Repairs to island after motor vehicle collision

north

Road closures

Planned - Temporary Road Closure Coomera

Day 6 of 32

Streets affected: Lilly Pilly Drive (full road closure local traffic access only) between Finnegan Way and Christine Drive

Show more

Start date: 10 October 2019

End date: 10 November 2019

Duration: 12am - 11.59pm

Reason: Excavations for stormwater connections, property crossovers and service connections

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 6 of 16

Streets affected: Coolangatta Road (full road closure local traffic access only) between Haig Street and Creek Street

Show more

Start date: 10 October 2019

End date: 25 October 2019 (3 shifts between dates)

Duration: 6pm - 6am

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Arundel

Day 5 of 48

Streets affected: Napper Road and Captain Cook Drive (half road closure with hold and release for 2 minutes maximum) between:

1. Allied Drive and Woodlands Way

2. Napper Road and Captain Cook Drive

Show more

Start date: 10 October 2019

End date: 27 November 2019

Duration: 7pm - 4am

Reason: Loop cutting works

north

Road closures

Planned - Temporary Road Closure Kingsholme

Day 5 of 8

Streets affected: Tillyroen Road and Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between :

1. Mirambeena Drive and McReadie Road

2. Tillyroen Road and Landsdowne Drive

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 4.30pm

Reason: Works for intersection upgrade

north

Road closures

Planned - Temporary Road Closure Stapylton

Day 5 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Quinns Hill Road East

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 7am - 5pm

Reason: Pavement testing (one shift only between dates)

south

Road closures

Planned - Temporary Road Closures - Burleigh Heads

Day 5 of 5

Streets affected: Brake Street (full road closure with detours) between Gold Coast Highway and Ocean Street

Show more

Start date: 11 October 2019

End date: 15 October 2019

Duration: 8am – 5pm

Reason: To allow works on roof patios of the Swell Apartments

south

Road closures

Planned - Temporary Road Closure Robina

Day 5 of 21

Streets affected: Christine Avenue (lane closure) between Konda Way and Olympus Drive

Show more

Start date: 11 October 2019

End date: 31 October 2019

Duration: 9am - 2.30pm

Reason: Construction of a new bus stop

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 5 of 8

Streets affected: Entertainment Road (half road closure with hold and release for 2 minutes maximum) between Binstead Way and Roadshow Way

Show more

Start date: 11 October 2019

End date: 18 October 2019

Duration: 11am - 3pm

Reason: Pavement testing works

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 3 of 49

Streets affected: Kristins Lane (full road closure local traffic access only) between Kohl Street and Days Road

Show more

Start date: 13 October 2019

End date: 30 November 2019

Duration: 12am - 11.59pm

Reason: Road upgrade outside of development

north

Road closures

Planned - Temporary Road Closure Labrador

Day 3 of 69

Streets affected: Baker Avenue (half road closure with hold and release for 2 minutes maximum) between Frank Street and Proud Street

Show more

Start date: 13 October 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: To facilitate construction related activities

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 12

Streets affected: Ocean Street (full road closure local traffic access only) between Stradbroke Street and Bayview Street

Show more

Start date: 14 October 2019

End date: 25 October 2019

Duration: 6.30am - 6.30pm

Reason: Closure to facilitate large deliveries, crane hoisting and concrete pours

north

Road closures

Planned - Temporary Road Closure Coolangatta

Day 2 of 7

Streets affected: Boundary Street (lane closure) between Hill Street and Ward Street

Show more

Start date: 14 October 2019

End date: 20 December 2019

Duration: 6.30am - 6.30pm

Reason: Reconstruction of road pavement and footpath

south

Road closures

Planned - Temporary Road Closure Burleigh Heads

Day 2 of 15

Streets affected: Hayle Street (full road closure local traffic access only) between Goodwin Terrace and Albert Street

Show more

Start date: 14 October 2019

End date: 28 October 2019 

(3 shifts between dates)

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Coolangatta

Day 2 of 12

Streets affected: Garrick Street (full road closure local traffic access only) between Tweed Street and Lanham Street

Show more

Start date: 14 October 2019

End date: 25 October 2019

(3 days between dates)

Duration: 6.30am - 6.30pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 15

Streets affected: Intersection of Kumbari Avenue and Johnson Street (lane closure) between Smith Street and Sungold Avenue

Show more

Start date: 14 October 2019

End date: 28 October 2019

2 shifts only between dates                  

Duration: 7pm - 4.30am

Reason: Loop cutting works

central

Mosquito spraying

Planned - Mosquito/Biting midge spraying – Biggera Waters, Burleigh, Hollywell, Paradise Point, Runaway Bay, Sovereign Islands

4.00am - 6.00am

Areas affected: Biggera Waters, Burleigh, Hollywell, Paradise Point, Runaway Bay, Sovereign Islands

Mosquito/biting midge spraying will be undertaken in these areas on Tuesday 15th October 2019 from 4am to 6am for control of mosquitos and biting midges (weather permitting). 

all regions

Water and sewerage

Planned - Water Interruption - Currumbin Waters

9.00am - 2.00pm

Streets affected: Love Street, Elizabeth Street, Currumbin Creek Road

Cause: Water main isolation works

Ispot/Pathway: 74639177

W/O: 60007169

Notif: 1000609139

south

Road closures

Planned - Temporary Road Closure - Currumbin Waters

Day 1 of 15

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Teatree Avenue and Stewart Road

Show more

Start date: 15 October 2019

End date: 29 October 2019

Duration: 6pm – 6am

Reason: Pavement resurfacing works

south

 
16 Oct - Wednesday
Water and sewerage

Unplanned - Water Interruption - Mudgeeraba

9.50am - 10.50am

Streets affected: Gold Coast Springbrook Road

Cause: Repair water service

W/O: 20534798

Notif: 1000609744

 

south

Water and sewerage

Unplanned - Water Interruption - Runaway Bay

12.15pm - 1.15pm

Streets affected: Broadwater Street

Cause: Repair water service

W/O: 60007112

Notif: 1000605548

north

Water and sewerage

Unplanned - Water Interruption : Bundall

1.30pm - 2.30pm

Streets Affected : Ashmore Rd.

Causes : Repair to Leaking Hydrant.

W/O : 20543798

Notif : 1000610620

central

Road closures

Planned - Temporary Road Closure - Biggera Waters

Day 338 of 399

Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street

Show more

Start date: 13 November 2018

End date: 16 December 2019

Duration: 7am - 5pm

Reason: To facilitate works on Quota Park

north

Road closures

Planned - Temporary Road Closure - Main Beach

Day 322 of 397

Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade

Show more

Start date: 29 November 2018

End date: 30 December 2019

Duration: 6:30am - 6:30pm

Reason: To facilitate works at Pelican Beach

north

Road closures

Planned - Temporary Road Closure - Reedy Creek

Day 257 of 483

Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road

Show more

Start date: 1 February 2019

End date: 29 May 2020

Duration 1: 6:30am – 6:30pm (Hold and Release)

Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)

Reason: Old Coach Road upgrade including major earthworks and realignment project

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 140 of 185

Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue

Show more

Start date: 30 May 2019

End date: 30 November 2019

(Thursdays only)

Duration: 7am – 10:30am

Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries

north

Road closures

Planned - Temporary Road Closure - Yatala

Day 138 of 357

Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)

Show more

Also affected: Link Drive, Dixon Street

Start date: 1 June 2019

End date: 22 May 2020

Duration 1: 12am – 11:59pm (Full Road Closure)

Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)

Reason: Upgrading of existing road infrastructure at the intersection

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 104 of 118

Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue

Show more

Start date: 5 July 2019

End date: 30 October 2019

Duration: 6:30am 5:30pm

Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe

north

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 91 of 93

Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)

 

Show more

Start date: 18 July 2019

End date: 18 October 2019

Duration: 6:30am 6:30pm

Reason: Construction activities

north

Road closures

Planned - Temporary Road Closure - Mermaid Beach

Day 84 of 92

Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue

Show more

Start date: 25 July 2019

End date: 24 October 2019

Duration: 6:30am 6:30pm

Reason: To facilitate a safe work environment during construction vehicle movement

south

Road closures

Planned - Temporary Road Closure - Surfers Paradise

Day 77 of 92

Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road

 

 

Show more

Start date: 1 August 2019

End date: 31 October 2019

Duration: Midnight 11:59pm

Reason: Construction of an emergency storage on sewer gravity main

north

Road closures

Planned - Temporary Road Closure - Clagiraba

Day 66 of 96

Streets affected: Clagiraba Road (shoulder, lane closure with hold and release for 2 minutes maximum at times with Portable Traffic Lights) between Beaudesert Nerang Road and Gerara Court

Show more

Start date: 12 August 2019

End date: 15 No