Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

June 2018

Jump to today
1 Jun - Friday
Road closures

Planned - Temporary road closure Yatala

Day 214 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 204 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 117 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 106 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 94 of 94

Streets affected: Avanti Street (full road closure local traffic access only) between Crescent Avenue and Markeri Street

Show more

Start date: 28 February 2018

 End date: 1 June 2018

Duration: Continuous

Reason: Drainage pipe upgrade

south

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 46 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 46 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 39 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 33 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 32 of 33

Streets affected: Binstead Way (half road closure with hold and release for 2 minutes maximum) between Greenway Boulevard and Pitcairn Way     

Show more

Start date: 1 May 2018

End date: 2 June 2018

Duration: 9am - 4pm

Reason: Guardrail upgrade

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 31 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 31 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 31 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 31 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 31 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 31 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 31 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 31 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 29 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 29 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 29 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 24 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 24 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 24 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 24 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 24 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 24 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 24 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 23 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 22 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 19 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 18 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 17 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 18 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 16 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 12 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 12 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 12 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Bundall

Day 12 of 15

Streets affected: Karp Court (Left turning lane) between Bundall Road and end of cul-de-sac

 

Show more

Start date: 21 May 2018

End date: 4 June 2018                 

Duration: 7am - 4pm

Reason: Underbore to install communications cabling conduits

north

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 12

Streets affected: Musgrave Avenue (lane closure) between Wilson Street and Neville Avenue

 

Show more

Start date: 21 May 2018

End date: 1 June 2018

1 to 2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer maintenance hole refurbishment

north

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 12

Streets affected: Marine Parade (lane closure) between Nind Street and North Street

 

Show more

Start date: 21 May 2018

End date: 1 June 2018

2 days only between dates                  

Duration: 9am - 3pm

Reason: Sewer maintenance

north

Road closures

Planned - Temporary Road Closure Southport

Day 11 of 11

Streets affected: Queen Street (lane closure) between Mal Burke Street and Ward Street

 

Show more

Start date: 21 May 2018

End date: 1 June 2018                  

Duration: 9am - 2:30pm

1 to 2 days only between dates                  

Reason: Sewer maintenance hole refurbishment program

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 8 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 5 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 5 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 5

Streets affected: Minnie Street (half road closure with hold and release for 2 minutes maximum) between Tweed Street and Nerang Street

                 

Show more

Start date: 28 May 2018

End date: 1 June 2018

Duration: 9:00am - 2:30pm

1 day only between dates                  

Reason: Investigative boreholes 

all regions

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 3 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 2 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 1 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 1 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 1 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 1 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

 
2 Jun - Saturday
Road closures

Planned - Temporary road closure Yatala

Day 215 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 205 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 118 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 107 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 47 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 47 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 40 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 34 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 33 of 33

Streets affected: Binstead Way (half road closure with hold and release for 2 minutes maximum) between Greenway Boulevard and Pitcairn Way     

Show more

Start date: 1 May 2018

End date: 2 June 2018

Duration: 9am - 4pm

Reason: Guardrail upgrade

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 32 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 32 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 32 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 32 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 32 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 32 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 32 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 32 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 30 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 30 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 30 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 25 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 25 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 25 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 25 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 25 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 25 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 25 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 24 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 23 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 20 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 19 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 19 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 18 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 19 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 17 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 13 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 13 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 13 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Bundall

Day 13 of 15

Streets affected: Karp Court (Left turning lane) between Bundall Road and end of cul-de-sac

 

Show more

Start date: 21 May 2018

End date: 4 June 2018                 

Duration: 7am - 4pm

Reason: Underbore to install communications cabling conduits

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 9 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 6 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 6 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 4 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 4 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 3 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 2 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 2 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 2 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 2 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

 
3 Jun - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 216 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 206 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 119 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 108 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 48 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 48 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 41 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 35 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 33 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 33 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 33 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 33 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 33 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 33 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 33 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 33 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 31 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 31 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 31 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 26 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 26 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 26 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 26 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 26 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 26 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 26 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 25 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 24 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 21 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 20 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 20 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 19 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 20 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 18 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 14 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 14 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 14 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Bundall

Day 14 of 15

Streets affected: Karp Court (Left turning lane) between Bundall Road and end of cul-de-sac

 

Show more

Start date: 21 May 2018

End date: 4 June 2018                 

Duration: 7am - 4pm

Reason: Underbore to install communications cabling conduits

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 10 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 7 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 7 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 5 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 5 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 4 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 4 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 3 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 3 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 3 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 3 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

 
4 Jun - Monday
Road closures

Planned - Temporary road closure Yatala

Day 217 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 207 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 120 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 109 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 49 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 49 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 42 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 36 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 34 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 34 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 34 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 34 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 34 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 34 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 34 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 34 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 32 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 32 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 32 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 27 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 27 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 27 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 27 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 27 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 27 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 27 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 26 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 25 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 22 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 21 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 21 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 20 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 21 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 19 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 15 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 15 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 15 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Bundall

Day 15 of 15

Streets affected: Karp Court (Left turning lane) between Bundall Road and end of cul-de-sac

 

Show more

Start date: 21 May 2018

End date: 4 June 2018                 

Duration: 7am - 4pm

Reason: Underbore to install communications cabling conduits

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 11 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 8 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 8 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 6 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 6 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 5 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 5 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 4 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 4 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 4 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 4 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 1 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 1 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 1 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 1 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

 
5 Jun - Tuesday
Road closures

Planned - Temporary road closure Yatala

Day 218 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 208 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 121 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 110 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 50 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 50 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 43 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 37 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 35 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 35 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 35 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 35 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 35 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 35 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 35 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 35 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 33 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 33 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 33 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 28 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 28 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 28 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 28 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 28 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 28 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 28 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 27 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 26 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 23 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 22 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 22 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 21 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 22 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 20 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 16 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 16 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 16 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 12 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 9 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 9 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 7 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 7 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 6 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 6 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 5 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 5 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 5 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 5 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 2 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 2 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 2 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 2 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 1 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 1 of 3

Streets affected: Nineteenth Avenue (lane closure) between Angelica Street and Kentia Court

 

Show more

Start date: 5 June 2018

End date: 7 June 2018                 

Duration: 09:00am - 14:30pm

Reason: Pavement investigation works

south

 
6 Jun - Wednesday
Road closures

Planned - Temporary road closure Yatala

Day 219 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 209 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 122 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 111 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 51 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 51 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 44 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 38 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 36 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 36 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 36 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 36 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 36 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 36 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 36 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 36 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 34 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 34 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 34 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 29 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 29 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 29 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 29 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 29 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 29 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 29 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 28 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 27 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 24 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 23 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 23 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 22 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 23 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 21 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 17 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 17 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 17 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 16 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 13 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 10 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 10 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 8 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 8

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018                

Duration: 7am - 3:30 pm

Reason: Intersection upgrade with police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 8 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 7 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 7 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 6 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 6 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 6 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 6 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 3 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 3 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 3 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 3 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 2 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 2 of 3

Streets affected: Nineteenth Avenue (lane closure) between Angelica Street and Kentia Court

 

Show more

Start date: 5 June 2018

End date: 7 June 2018                 

Duration: 09:00am - 14:30pm

Reason: Pavement investigation works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 1 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 1 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 1 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 1 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 1 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 1 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

 
7 Jun - Thursday
Road closures

Planned - Temporary road closure Yatala

Day 220 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 210 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 123 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 112 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 52 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 52 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 45 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 39 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 37 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 37 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 37 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 37 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 37 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 37 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 37 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 37 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 35 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 35 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 35 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 30 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 30 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 30 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 30 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 30 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 30 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 30 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 29 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 28 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 25 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 24 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 24 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 23 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 24 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 22 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 18 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 18 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 18 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 17 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 14 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 11 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 11 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 9 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 9 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 8 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 8 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 7 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 7 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 7 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 7 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 4 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 4 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 4 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 4 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 3 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 3

Streets affected: Nineteenth Avenue (lane closure) between Angelica Street and Kentia Court

 

Show more

Start date: 5 June 2018

End date: 7 June 2018                 

Duration: 09:00am - 14:30pm

Reason: Pavement investigation works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 2 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 2 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 2 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 2 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 2 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 2 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

 
8 Jun - Friday
Road closures

Planned - Temporary road closure Yatala

Day 221 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 211 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 124 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 113 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 53 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 53 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 46 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 40 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 38 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 38 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 38 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 38 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 38 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 38 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 38 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 38 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 36 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 36 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 36 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 31 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 31 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 31 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 31 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 31 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 31 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 31 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Labrador

Day 30 of 30

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 May 2018

End date: 8 June 2018

Duration: 10pm - 6am

Reason: Sewer reline program

north

Road closures

Planned - Temporary Road Closure Nerang

Day 29 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 26 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 25 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 25 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 24 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 25 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 23 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 19 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 19 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 19 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 18 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 12 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Bundall

Day 12 of 12

Streets affected: Ashmore Road (lane closure) between Upton Street and Tiwi Street

 

Show more

Start date: 28 May 2018

End date: 8 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Sewer relining

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 10 of 10

Streets affected: Townson Avenue (lane closure) between Nineteenth Avenue and Walker Avenue

 

Show more

Start date: 30 May 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 4am - 5pm

Reason: Sewer relining

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 10

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 30 May 2018

End date: 8 June 2018               

Duration: 7:00am- 3:30pm

Reason: Intersection upgrade with Police control when required

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 10

Streets affected: T E Peters Drive (lane closure) between Sarasota Key and Havana Key

 

Show more

Start date: 30 May 2018

End date: 8 June 2018              

Duration: 7:00am - 3:30pm

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 10 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 9 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 9 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 8 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 8 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 8 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 8 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 5 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 5 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 5 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 5 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 4 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 3 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 3 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 3 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 3 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 3 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 3 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 1 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 1 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

 
9 Jun - Saturday
Road closures

Planned - Temporary road closure Yatala

Day 222 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 212 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 125 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 114 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 54 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 54 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 47 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 41 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 39 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 39 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 39 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 39 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 39 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 39 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 39 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 39 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 37 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 37 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 37 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 32 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 32 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 32 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 32 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 32 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 32 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 32 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 30 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 27 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 26 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 26 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 25 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 26 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 24 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 20 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 20 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 20 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 19 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 16 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 13 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Hotham Creek Bridge

Show more

Start date: 28 May 2018

End date: 9 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 11 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 10 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 10 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 9 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 9 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 9 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 9 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 6 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 6 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 6 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 6 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 5 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 4 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 4 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 4 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 4 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 4 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 4 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 2 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 2 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 1 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

 
10 Jun - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 223 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 213 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 126 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 115 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 55 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 55 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 48 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 42 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 40 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 40 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 40 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 40 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 40 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 40 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 40 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 40 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 38 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 38 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 38 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Robina

Day 33 of 33

Streets affected: Ron Penhaligan Way (half road closure with hold and release for 2 minutes maximum) between Tennyson Place and Commerce Drive

Show more

Start date: 9 May 2018

End date: 10 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 33 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 33 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 33 of 33

Streets affected: Galleon Way (half road and lane) between Guineas Creek Road and Brigantine Court

 

Show more

Start date: 9 May 2018

End date: 10 June 2018                  

Duration: 7am - 5pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 33 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 33 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 33 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 31 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 28 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 27 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 27 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 26 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 27 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 25 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 21 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 21 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 21 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 20 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 17 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 12 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 11 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 11 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 10 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 10 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 10 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 10 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 7 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 7 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 7 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 7 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 6 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 5 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 5 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 5 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 5 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 5 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 5 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 3 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 3 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 2 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary road closure - Labrador

Day 1 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

 
11 Jun - Monday
Road closures

Planned - Temporary road closure Yatala

Day 224 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 214 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 127 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 116 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 56 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 56 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 49 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 43 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 41 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 41 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 41 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 41 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 41 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 41 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 41 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 41 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 39 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 39 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Currumbin

Day 39 of 39

Streets affected: Guineas Creek Road (half road closure with hold and release for 2 minutes maximum) between Galleon Way and Riverside Drive 

Show more

Start date: 4 May 2018

End date: 11 May 2018

Duration: 9am - 2.30pm

Reason: Sewer rising main works

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 34 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 34 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 34 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 34 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 34 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 32 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 29 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 28 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 28 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 27 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 28 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 26 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 22 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 22 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 22 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 21 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 13 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 12 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 12 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 11 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 11 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 11 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 11 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 8 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 8 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 8 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 8 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 7 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 6 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 6 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 6 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 6 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 6 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 6 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 4 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 4 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 4 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 3 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary road closure - Labrador

Day 2 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 1 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 1 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 1 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

 
12 Jun - Tuesday
Road closures

Planned - Temporary road closure Yatala

Day 225 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 215 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 128 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 117 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 57 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 57 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 50 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 44 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 42 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 42 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 42 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 42 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 42 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 42 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 42 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 42 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 40 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 40 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ormeau

Day 35 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 35 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 35 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 35 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 35 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 33 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 30 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 29 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 29 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 28 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 29 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 27 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 23 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 23 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 23 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 22 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 19 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 14 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 13 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 13 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 12 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 12 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 12 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 12 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 9 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 9 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 9 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 9 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 8 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 7 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 7 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 7 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 7 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 7 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 7 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 5 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 5 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 5 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 4 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary road closure - Labrador

Day 3 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 2 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 2 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 2 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

 
13 Jun - Wednesday
Road closures

Planned - Temporary road closure Yatala

Day 226 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 216 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 129 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 118 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 58 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 58 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 51 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 45 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Hope Island

Day 43 of 43

Streets affected: Crescent Avenue (half road closure with hold and release for 2 minutes maximum) between Broadwater Avenue and Shoe Street

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 7pm

Reason: Geotechnical Investigations

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 43 of 43

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Valley Brooke Rise and Northern Skies Terrace

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 6.30pm

Reason: Geotechnical Testing

north

Road closures

Planned - Temporary Road Closure Mermaid Waters

Day 43 of 43

Streets affected: Barrier Reef Drive (half road closure with hold and release for 2 minutes maximum) between Wild Duck Drive and Rio Vista Boulevard

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Molendinar

Day 43 of 43

Streets affected: Crestwood Drive (lane closure) between Lockwood Place and Grasstree Way

Show more

Start date: 2 May 2018

End date: 13 June 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ashmore

Day 43 of 43

Streets affected: Cotlew Street (half road closure with hold and release for 2 minutes maximum) between Wardoo Street and Parasol Street

Show more

Start date: 2 May 2018

End date: 16 May 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 43 of 43

Streets affected: Morala Avenue (half road closure with hold and release for 2 minutes maximum) between Simbai Street and Erave Avenue

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Mobile pavement data collection

north

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 43 of 43

Streets affected: Cobai Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Hinterland Drive

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

hinterland

Road closures

Planned - Temporary Road Closure Miami

Day 43 of 43

Streets affected: Nobby Parade (half road closure with hold and release for 2 minutes maximum) between Miami Shore Parade and Dawn Parade

Show more

Start date: 2 May 2018

End date: 13 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

south

Road closures

Planned - Temporary Road Closure Southport

Day 41 of 41

Streets affected: Coolibah Street (half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Myall Street

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Molendinar

Day 41 of 41

Streets affected: Crestwood Drive (half road closure with hold and release for 2 minutes maximum) between Watergum Parade and Rosegum Drive

Show more

Start date: 4 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Ormeau

Day 36 of 36

Streets affected: Peachey Road (half road closure with hold and release for 2 minutes maximum) between Sandy Creek Road and Vennor Drive

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Southport

Day 36 of 36

Streets affected: Blake Street (half road closure with hold and release for 2 minutes maximum) between Alicia Street and Melinda Street

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 36 of 36

Streets affected: Treeview Drive (half road closure with hold and release for 2 minutes maximum) between Honeywood Court and Featherwood Close

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Stapylton

Day 36 of 36

Streets affected: Quinn Hill East Road (half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Woolshed Road

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Reedy Creek

Day 36 of 36

Streets affected: Bridgman Drive (half road closure with hold and release for 2 minutes maximum) between Old Coach Road and Ridgevista Court

Show more

Start date: 9 May 2018

End date: 13 June 2018

Duration: 9.15am - 2.15pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Nerang

Day 34 of 34

Streets affected: McLaren Road (lane closure) between Nerang Beaudesert Road and Yarimbah Drive

Show more

Start date: 11 May 2018

End date: 13 June 2018

Duration: 7am - 5pm

Reason: Mobile pavement data collection

hinterland

Road closures

Planned - Temporary Road Closure Pimpama

Day 31 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 30 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 30 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 29 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 30 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 28 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 24 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 24 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 24 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 23 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 20 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 15 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 14 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 14 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 13 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 13 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 13 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 13 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 10 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 10 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 10 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 10 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 9 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 8 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 8 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 8 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 8 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 8 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 8 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 6 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 6 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 6 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 5 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary road closure - Labrador

Day 4 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 3 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 3 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 3 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 1 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 1 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 1 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 3

Streets affected: Leo Graham Way (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Tamborine Oxenford Road

Show more

Start date: 13 June 2018

End date: 15 June 2018

Duration: 9am - 2.30pm

Reason: Pavement investigation

north

 
14 Jun - Thursday
Road closures

Planned - Temporary road closure Yatala

Day 227 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 217 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 130 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 119 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 59 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 59 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 52 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 46 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 32 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 31 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 31 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 30 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 31 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 29 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 25 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 25 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 25 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 24 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 21 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 16 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 15 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 14 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 14 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 14 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 14 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 11 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 11 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 11 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 11 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 10 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 9 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 9 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 9 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 9 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 9 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 9 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 9

Streets affected: Sunshine Boulevard (lane closure) between Sonder Street and Eady Avenue

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 9

Streets affected: Eady Avenue (lane closure) between T E Peters Drive and cul de sac

 

Show more

Start date: 6 June 2018

End date: 14 June 2018              

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 9

Streets affected: T E Peters Drive (lane closure) between Chant Street and Havana Key

 

Show more

Start date: 6 June 2018

End date: 14 June 2018                

Duration: 7:00pm - 3:30am

Reason: Intersection upgrade with Police control when required.

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 7 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 7 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 7 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 6 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary road closure - Labrador

Day 5 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 4 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 4 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 2 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 2 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 2 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 3

Streets affected: Leo Graham Way (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Tamborine Oxenford Road

Show more

Start date: 13 June 2018

End date: 15 June 2018

Duration: 9am - 2.30pm

Reason: Pavement investigation

north

Road closures

Planned - Temporary Road Closure Nerang

Day 1 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

 
15 Jun - Friday
Road closures

Planned - Temporary road closure Yatala

Day 228 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 218 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 131 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 120 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 60 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 60 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 53 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 47 of 47

Streets affected: Silverpine Crescent (half road closure with hold and release for 2 minutes maximum) between Barrs Avenue and Waverly Park Close

Show more

Start date: 30 April 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Facilitate crane and equipment access to facility

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 33 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 32 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 32 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 31 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 32 of 32

Streets affected: Michigan Drive (half road closure with hold and release for 2 minutes maximum) between Ohio Court and Idaho Place

                     

Show more

Start date: 15 May 2018

End date: 15 June 2018

Duration: 9:30am- 2:30pm

Reason: Facilitate geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 30 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Palm Beach

Day 26 of 26

Streets affected: Sarawak Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and cul de sac

                   

Show more

Start date: 21 May 2018

End date: 15 June 2018

Duration: 6:30am - 4:00pm

Reason: Upgrading Car Parking Bays  

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 26 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 26 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 25 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 22 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 17 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 16 of 16

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Leyshon Court and Davenport Drive

                     

Show more

Start date: 31 May 2018

End date: 15 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works

south

Road closures

Planned - Temporary Road Closure Robina

Day 16 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 15 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 15 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 15 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 15 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 12 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 12 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 12 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 12 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 11 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 10 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 10 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 10 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 10 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 10 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 10 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 8 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 8 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 8 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary Road Closure Labrador

Day 7 of 7

Streets affected: Musgrave Avenue and Clayton Street (half road closure with hold and release for 2 minutes maximum) between Turpin Road / Musgrave Avenue and Sandy Court / Walter Street

Show more

Start date: 9 June 2018

End date: 15 June 2018

Duration: 10pm - 6am

Reason: Sewer relining program

central

Road closures

Planned - Temporary road closure - Labrador

Day 6 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 5 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 5 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 3 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 3 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 3 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 3 of 3

Streets affected: Leo Graham Way (half road closure with hold and release for 2 minutes maximum) between Old Pacific Highway and Tamborine Oxenford Road

Show more

Start date: 13 June 2018

End date: 15 June 2018

Duration: 9am - 2.30pm

Reason: Pavement investigation

north

Road closures

Planned - Temporary Road Closure Nerang

Day 2 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 1 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

 
16 Jun - Saturday
Road closures

Planned - Temporary road closure Yatala

Day 229 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 219 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 132 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 121 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 61 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 61 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 54 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 34 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Robina

Day 33 of 33

Streets affected: Robina Town Centre Drive (half road closure with hold and release for 2 minutes maximum) between Christine Avenue and Bazaar Street

 

Show more

Start date: 15 May 2018

End date: 16 June 2018

Duration: 7am - 5pm

Reason: Installation of coloured surfacing works                   

south

Road closures

Planned - Temporary Road Closure Bonogin

Day 33 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 32 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 31 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 27 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 27 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 26 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 23 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 18 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 17 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 16 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 16 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 16 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 16 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 13 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 13 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Yatala

Day 13 of 13

Streets affected: Binary Street (full road closure local traffic access only) between Byte Street and Rom Street

 

 

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Road resurfacing

north

Road closures

Planned - Temporary Road Closure Norwell

Day 13 of 13

Streets affected: Pimpama Jacobs Well Road (half road closure with hold and release for 2 minutes maximum) at the Norwell Road intersection

Show more

Start date: 4 June 2018

End date: 16 June 2018

Duration: 6pm - 5am

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 12 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 11 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 11 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 11 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 11 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 11 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 11 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 9 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 9 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 9 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary road closure - Labrador

Day 7 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 6 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 6 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 4 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 4 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 4 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 3 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 2 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 1 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 1 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

 
17 Jun - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 230 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 220 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 133 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 122 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 62 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 62 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 55 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 35 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 34 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 33 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 32 of 32

Streets affected: Lavarack Road (half road closure with hold and release for 2 minutes maximum) between Great Hall Drive and Petrel Avenue

              

Show more

Start date: 17 May 2018

End date: 17 June 2018

Duration: 9am - 2:30pm

Reason: Installation of coloured surfacing

south

Road closures

Planned - Temporary Road Closure Clagiraba

Day 28 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 28 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 27 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 24 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 19 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 18 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 17 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 17 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 17 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 17 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 14 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 14 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Miami

Day 13 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 12 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 12 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 12 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 12 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 12 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 12 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 10 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 10 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 10 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 10 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary road closure - Labrador

Day 8 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 7 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 7 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 5 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 5 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 5 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 4 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 3 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 2 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 2 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

 
18 Jun - Monday
Road closures

Planned - Temporary road closure Yatala

Day 231 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 221 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 134 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 123 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 63 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 63 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 56 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 36 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 35 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 34 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 29 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 29 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 28 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 25 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 20 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 19 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 18 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 18 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 18 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 18 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 15 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 15 of 15

Streets affected: Ora Court (full road closure local traffic access only) between Narbine Street and Reynton Street.

 

Show more

Start date: 6 June 2018

End date: 8 June 2018

Duration: 700 - 1700

Reason: Install water main to replace existing.

south

Road closures

Planned - Temporary Road Closure Miami

Day 14 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Wongawallan

Day 13 of 13

Streets affected: Bottlebrush Lane (half road closure with hold and release for 2 minutes maximum) between Timberview Drive and End of road

Show more

Start date: 6 June 2018

End date: 18 June 2018

Duration: 6.30am - 6pm

Reason: Kerb and channel works

north

Road closures

Planned - Temporary Road Closure Bundall

Day 13 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 13 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 13 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 13 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 13 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 11 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 11 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 11 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 11 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary road closure - Labrador

Day 9 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 8 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 8 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 6 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 6 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 6 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 5 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 4 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 3 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 3 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 1 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 1 of 12

Streets affected: Venice Street (lane closure) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 18 June 2018

End date: 29 June 2018

1 day only between dates                  

Duration: 7am - 5pm

Reason: Profile and reseal roadway

south

Road closures

Planned - Temporary Road Closure Southport

Day 1 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Robina

Day 1 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 13

Streets affected: Harriet Lane and Kopps Road (full road closure local traffic access only) between Cathmor Court / Harriet Lane and End of Road

Show more

Start date: 18 June 2018

End date: 30 June 2018

Duration: Continuous

Reason: Stormwater, sewer and electrical works

north

 
19 Jun - Tuesday
Road closures

Planned - Temporary road closure Yatala

Day 232 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 222 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 135 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 124 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 64 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 64 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 57 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 37 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 36 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 35 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 30 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 30 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 29 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 26 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 21 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 20 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 19 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 19 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 19 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 19 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 16 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 15 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 14 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 14 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 14 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 14 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 14 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 12 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 12 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 12 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary road closure - Labrador

Day 10 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 9 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 9 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 7 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 7 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 7 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 6 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 5 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 4 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 4 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 2 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 2 of 12

Streets affected: Venice Street (lane closure) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 18 June 2018

End date: 29 June 2018

1 day only between dates                  

Duration: 7am - 5pm

Reason: Profile and reseal roadway

south

Road closures

Planned - Temporary Road Closure Southport

Day 2 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Robina

Day 2 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 13

Streets affected: Harriet Lane and Kopps Road (full road closure local traffic access only) between Cathmor Court / Harriet Lane and End of Road

Show more

Start date: 18 June 2018

End date: 30 June 2018

Duration: Continuous

Reason: Stormwater, sewer and electrical works

north

 
20 Jun - Wednesday
Road closures

Planned - Temporary road closure Yatala

Day 233 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 223 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 136 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 125 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 65 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 65 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 58 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 38 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 37 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 36 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 31 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 31 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 30 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 27 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 22 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 21 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 20 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 20 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 20 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 20 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Austinville

Day 17 of 17

Streets affected: Mt Nimmel Road (half road closure with hold and release for 2 minutes maximum) between Little Nerang Dam Road and End of road

Show more

Start date: 4 June 2018

End date: 20 June 2018

Duration: 6.30am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Miami

Day 16 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Bundall

Day 15 of 15

Streets affected: Poinciana Crescent (half road closure with hold and release for 2 minutes maximum) between Sandown Avenue and Heeb Street        

Show more

Start date: 6 June 2018

End date: 20 June 2018

Duration: 7am - 4pm

Reason: Connection of sewer mains to infrastructure system

central

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 15 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 15 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 15 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 15 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 15 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 15 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 15 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 13 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 13 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 13 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 13 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary road closure - Labrador

Day 11 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 10 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 16

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place     

Show more

Start date: 11 June 2018

End date: 26 June 2018

Duration: 7am - 5pm

Reason: Reconfigure pedestrian crossing and ramp installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 10 of 19

Streets affected: Galleon Way - Bridge section (half road closure with hold and release for 2 minutes maximum) between Currumbin Creek Road and Tierney Drive

                    

Show more

Start date: 11 June 2018

End date: 29 June 2018

Duration: 7am - 5pm

Reason: Water main renewal 

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 8 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 8 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Helensvale

Day 8 of 10

Streets affected: Sir John Overall Drive (half road closure with hold and release for 2 minutes maximum) between Lindfield Road and Discovery Drive

Show more

Start date: 13 June 2018

End date: 22 June 2018

Duration: 9am - 2.30pm

Reason: Installation of new bus shelter

north

Road closures

Planned - Temporary Road Closure Nerang

Day 7 of 17

Streets affected: Pappas Way (half road closure with hold and release for 2 minutes maximum) between Paul Court and Spencer Street

Show more

Start date: 14/06/2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Coombabah

Day 6 of 9

Streets affected: Iando Street (half road closure with hold and release for 2 minutes maximum) between Hansford Road and The Esplanade

Show more

Start date: 15 June 2018

End date: 23 June 2018

Duration: 7am - 5pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 8

Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Armrick Avenue and Old Burleigh Road

Show more

Start date:15 June 2018

End date: 22 June 2018

Duration: 9am - 3.30pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Alberton

Day 5 of 8

Streets affected: Woolshed Road (half road closure with hold and release for 2 minutes maximum) between Quinns Hill Road and Stapylton Jacobs Well Road

Show more

Start date: 16 June 2018

End date: 23 June 2018

Duration: 6.30am - 5pm

Reason: Repair road failure

north

Road closures

Planned - Temporary Road Closure Palm Beach

Day 5 of 8

Streets affected: Townson Avenue and Nineteenth Avenue (lane closure) between Walker Avenue / Brooke Avenue and Barracuda Avenue / Mallawa Drive

Show more

Start date: 16 June 2018

End date: 23 June 2018

2 days only between dates                  

Duration: 7am - 5pm

Reason: Reline sewer

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 3 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 3 of 12

Streets affected: Venice Street (lane closure) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 18 June 2018

End date: 29 June 2018

1 day only between dates                  

Duration: 7am - 5pm

Reason: Profile and reseal roadway

south

Road closures

Planned - Temporary Road Closure Southport

Day 3 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Robina

Day 3 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Oxenford

Day 3 of 13

Streets affected: Harriet Lane and Kopps Road (full road closure local traffic access only) between Cathmor Court / Harriet Lane and End of Road

Show more

Start date: 18 June 2018

End date: 30 June 2018

Duration: Continuous

Reason: Stormwater, sewer and electrical works

north

 
21 Jun - Thursday
Road closures

Planned - Temporary road closure Yatala

Day 234 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 224 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 137 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 126 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 66 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 66 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Labrador

Day 59 of 68

Streets affected: Robert Street and Muir Street (full road closure local traffic access only) between Ahearn Street / Central Street and Echlin Street / Walter Street

Show more

Start date: 24 March 2018

End date: 30 June 2018

Duration: 6am - 11.59pm

Reason: Intersection upgrade to roundabout

north

Road closures

Planned - Temporary Road Closure Pimpama

Day 39 of 44

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 14 May 2018

End date: 29 June 2018

Duration: 7am - 5pm (Mon-Fri) & 8am - 4pm (Sat)

Reason: Demolition and installation of new flow meter and pit

 

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 38 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Worongary

Day 37 of 42

Streets affected: Mudgeeraba Road (Turning Lane) between Quambone Street and Gooding Drive

 

Show more

Start date: 15 May 2018

End date: 26 June 2018                  

Duration: 0700am - 630pm

Reason: Drilling boreholes for geographical investigations

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 32 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Clagiraba

Day 32 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 31 of 32

Streets affected: Elkhorn Avenue (lane closure) between Orchid Avenue and The Esplanade

 

Show more

Start date: 22 May 2018

End date: 22 June 2018               

Duration: 7am - 5pm

Reason: Coloured Surfacing Installation

all regions

Road closures

Planned - Temporary Road Closure Robina

Day 28 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Surfers Paradise

Day 23 of 24

Streets affected: Mawarra Street (partial lane closure with hold and release for 2 minutes maximum) between Stanhill Drive and Dalpura Street

                     

Show more

Start date: 30 May 2018

End date: 22 June 2018

Duration: 9:00am - 4:00pm

Reason: Sewer mains relining

north

Road closures

Planned - Temporary Road Closure Robina

Day 22 of 31

Streets affected: Robina Parkway (single lane closures of a multi-lane road - at least one lane in both directions along Robina Parkway to be trafficable at all times) between Paradise Springs Avenue and Cheltenham Drive

 

Show more

Start date: 31 May 2018

End date: 30 June 2018

Duration: 9:00am - 2:30pm

Reason: Maintenance on sewer valve chambers

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 21 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 21 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 21 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 21 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Miami

Day 17 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 16 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 16 of 24

Streets affected: Morala Avenue (lane closure) between Broadwater Street and Limetree Parade

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 16 of 24

Streets affected: Lae Drive (lane closure) between Oxley Drive and Morala Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                 

Duration: 9am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Labrador

Day 16 of 24

Streets affected: Government Road (lane closure) between Ashton Street and Beitz Avenue

 

Show more

Start date: 6 June 2018

End date: 29 June 2018               

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 16 of 24

Streets affected: Lae Drive (lane closure) between Morala Avenue and Folkstone Place

 

Show more

Start date: 6 June 2018

End date: 29 June 2018            

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Runaway Bay

Day 16 of 24

Streets affected: Bayview Street (lane closure) between Lae Drive and bridge abutment

 

Show more

Start date: 6 June 2018

End date: 29 June 2018                

Duration: 9:00am - 2:30pm

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Helensvale

Day 16 of 25

Streets affected: Siganto Drive (lane closure) between Tradewinds Drive and Oxenford Hope Island Road

 

Show more

Start date: 6 June 2018

End date: 30 June 2018              

Duration: 6:00pm - 6:00am

Reason: Geotechnical investigations

north

Road closures

Planned - Temporary Road Closure Currumbin

Day 14 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 14 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 14 of 23

Streets affected: Charlton Street (half road closure with hold and release for 2 minutes maximum) between Radford Street and Egerton Street

Show more

Start date: 8 June 2018

End date: 30 June 2018

Duration: 9am - 2.30pm

Reason: Geotechnical investigations

central

Road closures

Planned - Temporary Road Closure Southport

Day 14 of 23

Streets affected: Cotlew Street (lane closure) between Wardoo Street and Tecoma Street

Show more

Start date: 8 June 2018

End date: 8 June 2018

1 day only between dates                  

Duration: 9am - 4pm

Reason: Mobile pavement data collection

central

Road closures

Planned - Temporary road closure - Labrador

Day 12 of 82

Streets affected: Parker Street (left turning lane closure only) between Gold Coast Highway

Show more

Start date: 10 June 2018

End date: 30 August 2018

Duration: continuous - 6:00pm

Reason: work zone - public exclusion area for site safety

all regions

Road closures

Planned - Temporary Road Closure Tugun

Day 11 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 16