Alerts

This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.

Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.

For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.

For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.

To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.

Legend:

unplanned

planned

July 2018

Jump to today
1 Jul - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 244 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 234 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 147 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 136 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 76 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 76 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 48 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 42 of 42

Streets affected: Clagiraba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive

                  

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades at various locations on Clagiraba Road  

north

Road closures

Planned - Temporary Road Closure Clagiraba

Day 42 of 42

Streets affected: Clagriba Road (half road closure with hold and release for 2 minutes maximum) between Beaudesert Nerang Road and Arunta Drive             

Show more

Start date: 21 May 2018

End date: 1 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrades along road

hinterland

Road closures

Planned - Temporary Road Closure Robina

Day 38 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 31 of 31

Streets affected: Noojee Street (half road closure with hold and release for 2 minutes maximum) between Michel Drive and Cul-de-sac

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 31 of 31

Streets affected: Hayter Street (half road closure with hold and release for 2 minutes maximum) between Stewart Road and Teatree Avenue

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Tugun

Day 31 of 31

Streets affected: Boyd Street (half road closure with hold and release for 2 minutes maximum) between Coolangatta Road and Monash Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Bilinga

Day 31 of 31

Streets affected: Golden Four Drive (half road closure with hold and release for 2 minutes maximum) between Wyberba Street and Wagawn Street

Show more

Start date: 1 June 2018

End date: 1 July 2018

Duration: 7am - 7pm

Reason: Geotechnical investigation

south

Road closures

Planned - Temporary Road Closure Miami

Day 27 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 24 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 24 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 21 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 19 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 19 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 14 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 14 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Robina

Day 14 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Robina

Day 14 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 7 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 7 of 12

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Lagoon Park Drive and Rivermill Terrace

Show more

Start date: 25 June 2018

End date: 6 July 2018

Duration: 9am - 2.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 5 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 4 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 4 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure EVENT Various Suburbs

Day 2 of 2

Streets affected: Various Coastal Roads (full road closure for CITY EVENT - no vehicle access)

30 June 2018 Biggera Waters to Main Beach

1 July 2018 Paradise Point to Burleigh

Show more

Start date: 30 June 2018

End date: 1 July 2018

Duration: 03am - 3pm

Reason: CITY EVENT GOLD COAST AIRPORT MARATHON 2018

all regions

Road closures

Planned - Temporary Road Closure Pimpama

Day 2 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 1 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

 
2 Jul - Monday
Road closures

Planned - Temporary road closure Yatala

Day 245 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 235 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 148 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 137 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 77 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 77 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Bonogin

Day 49 of 49

Streets affected: Bonogin Road (half road closure with hold and release for 2 minutes maximum) between Tulipwood Drive and Hardys Road

                   

Show more

Start date: 15 May 2018

End date: 2 July 2018

Duration: 7am - 4pm

Reason: Guardrail upgrade 

north

Road closures

Planned - Temporary Road Closure Robina

Day 39 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Miami

Day 28 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 25 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 25 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 22 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 20 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 20 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 15 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 15 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Robina

Day 15 of 15

Streets affected: Robina Town Centre Drive (lane closure) between Laver Drive and Bayberry Lane

Show more

Start date: 18 June 2018

End date: 2 July 2018

1 day only between dates                  

Duration: 9.30am - 2.30pm

Reason: Installation of signage

south

Road closures

Planned - Temporary Road Closure Hollywell

Day 8 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 8 of 12

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Lagoon Park Drive and Rivermill Terrace

Show more

Start date: 25 June 2018

End date: 6 July 2018

Duration: 9am - 2.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 6 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 5 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 5 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 3 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 2 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 1 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 1 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 1 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 1 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 1 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 1 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 1 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary road closure Palm Beach

Day 1 of 5

Streets affected: Jefferson Lane (full road closure local traffic access only) between Fourth Avenue and Palm Beach Avenue

 

Show more

Start date: 2 July 2018

End date: 6 July 2018

Duration: 6.30am - 6.30pm

Reason: Concrete pour at development site

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 1 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Oxenford

Day 1 of 2

Streets affected: 100-106 Old Pacific Highway (lane closure) between Leo Graham Way and Michigan Drive

Show more

Start date: 2 July 2018

End date: 3 July 2018

Duration: 7am - 5pm

Reason: Upgrading water pump and replacing pipes

north

 
3 Jul - Tuesday
Road closures

Planned - Temporary road closure Yatala

Day 246 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 236 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 149 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 138 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 78 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 78 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Robina

Day 40 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Miami

Day 29 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 26 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 26 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 23 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 21 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 21 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 16 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 16 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 9 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 9 of 12

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Lagoon Park Drive and Rivermill Terrace

Show more

Start date: 25 June 2018

End date: 6 July 2018

Duration: 9am - 2.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 7 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 6 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 6 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 4 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 3 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 2 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 2 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 2 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 2 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 2 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 2 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 2 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary road closure Palm Beach

Day 2 of 5

Streets affected: Jefferson Lane (full road closure local traffic access only) between Fourth Avenue and Palm Beach Avenue

 

Show more

Start date: 2 July 2018

End date: 6 July 2018

Duration: 6.30am - 6.30pm

Reason: Concrete pour at development site

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 2 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Oxenford

Day 2 of 2

Streets affected: 100-106 Old Pacific Highway (lane closure) between Leo Graham Way and Michigan Drive

Show more

Start date: 2 July 2018

End date: 3 July 2018

Duration: 7am - 5pm

Reason: Upgrading water pump and replacing pipes

north

 
4 Jul - Wednesday
Road closures

Planned - Temporary road closure Yatala

Day 247 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 237 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 150 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 139 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 79 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 79 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Robina

Day 41 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Miami

Day 30 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 27 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 27 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 24 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 22 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 22 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 17 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 17 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 10 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 10 of 12

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Lagoon Park Drive and Rivermill Terrace

Show more

Start date: 25 June 2018

End date: 6 July 2018

Duration: 9am - 2.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 8 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 7 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 7 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 5 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 4 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 3 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 3 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 3 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 3 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 3 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 3 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 3 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary road closure Palm Beach

Day 3 of 5

Streets affected: Jefferson Lane (full road closure local traffic access only) between Fourth Avenue and Palm Beach Avenue

 

Show more

Start date: 2 July 2018

End date: 6 July 2018

Duration: 6.30am - 6.30pm

Reason: Concrete pour at development site

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 3 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Molendinar

Day 1 of 8

Streets affected: Gemini Circuit (half road closure with hold and release for 2 minutes maximum) multiple locations along road

Show more

Start date: 4 July 2018

End date: 11 July 2018

Duration: 7am - 6pm

Reason: Install coloured surfacing works

central

 
5 Jul - Thursday
Road closures

Planned - Temporary road closure Yatala

Day 248 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 238 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 151 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 140 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 80 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 80 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Robina

Day 42 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Miami

Day 31 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 28 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 28 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 25 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 23 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 23 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 18 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 18 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 11 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 11 of 12

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Lagoon Park Drive and Rivermill Terrace

Show more

Start date: 25 June 2018

End date: 6 July 2018

Duration: 9am - 2.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 9 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 8 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 8 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 6 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 5 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 4 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 4 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 4 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 4 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 4 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 4 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 4 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary road closure Palm Beach

Day 4 of 5

Streets affected: Jefferson Lane (full road closure local traffic access only) between Fourth Avenue and Palm Beach Avenue

 

Show more

Start date: 2 July 2018

End date: 6 July 2018

Duration: 6.30am - 6.30pm

Reason: Concrete pour at development site

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 4 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Molendinar

Day 2 of 8

Streets affected: Gemini Circuit (half road closure with hold and release for 2 minutes maximum) multiple locations along road

Show more

Start date: 4 July 2018

End date: 11 July 2018

Duration: 7am - 6pm

Reason: Install coloured surfacing works

central

 
6 Jul - Friday
Road closures

Planned - Temporary road closure Yatala

Day 249 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 239 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 152 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 141 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 81 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 81 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Robina

Day 43 of 43

Streets affected: Robina Parkway (lane closure) between Laver Drive and Robina Parkway

 

Show more

Start date: 25 May 2018

End date: 6 July 2018             

Duration: 8am - 8pm

Reason: Optic Fibre Installation

south

Road closures

Planned - Temporary Road Closure Miami

Day 32 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 29 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 29 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 26 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 24 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 24 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 19 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 19 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 12 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 12 of 12

Streets affected: Riverstone Crossing (half road closure with hold and release for 2 minutes maximum) between Lagoon Park Drive and Rivermill Terrace

Show more

Start date: 25 June 2018

End date: 6 July 2018

Duration: 9am - 2.30pm

Reason: Asphalt resurfacing works                     

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 10 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 9 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 9 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 7 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 6 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 5 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 5 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 5 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 5 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 5 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 5 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 5 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary road closure Palm Beach

Day 5 of 5

Streets affected: Jefferson Lane (full road closure local traffic access only) between Fourth Avenue and Palm Beach Avenue

 

Show more

Start date: 2 July 2018

End date: 6 July 2018

Duration: 6.30am - 6.30pm

Reason: Concrete pour at development site

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 5 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Molendinar

Day 3 of 8

Streets affected: Gemini Circuit (half road closure with hold and release for 2 minutes maximum) multiple locations along road

Show more

Start date: 4 July 2018

End date: 11 July 2018

Duration: 7am - 6pm

Reason: Install coloured surfacing works

central

 
7 Jul - Saturday
Road closures

Planned - Temporary road closure Yatala

Day 250 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 240 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 153 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 142 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 82 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 82 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Miami

Day 33 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 30 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 30 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 27 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 25 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 25 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 20 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 20 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 13 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 11 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 10 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 10 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 8 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 7 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 6 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 6 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 6 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 6 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 6 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 6 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 6 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 6 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 6 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Molendinar

Day 4 of 8

Streets affected: Gemini Circuit (half road closure with hold and release for 2 minutes maximum) multiple locations along road

Show more

Start date: 4 July 2018

End date: 11 July 2018

Duration: 7am - 6pm

Reason: Install coloured surfacing works

central

 
8 Jul - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 251 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 241 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 154 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 143 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 83 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 83 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Miami

Day 34 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 31 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 31 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 28 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 26 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 26 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 21 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 21 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 14 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 12 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 11 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 11 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 9 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 8 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 7 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 7 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 7 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 7 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 7 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 7 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 7 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 7 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 7 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Molendinar

Day 5 of 8

Streets affected: Gemini Circuit (half road closure with hold and release for 2 minutes maximum) multiple locations along road

Show more

Start date: 4 July 2018

End date: 11 July 2018

Duration: 7am - 6pm

Reason: Install coloured surfacing works

central

 
9 Jul - Monday
Road closures

Planned - Temporary road closure Yatala

Day 252 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 242 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 155 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 144 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 84 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 84 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Miami

Day 35 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 32 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 32 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 29 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 27 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 27 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 22 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 22 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 15 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 13 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 12 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 12 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 10 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 9 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 8 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 8 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 8 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 8 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 8 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 8 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 8 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 8 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 8 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Molendinar

Day 6 of 8

Streets affected: Gemini Circuit (half road closure with hold and release for 2 minutes maximum) multiple locations along road

Show more

Start date: 4 July 2018

End date: 11 July 2018

Duration: 7am - 6pm

Reason: Install coloured surfacing works

central

 
10 Jul - Tuesday
Road closures

Planned - Temporary road closure Yatala

Day 253 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 243 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 156 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 145 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 85 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Upper Coomera

Day 85 of 85

Streets affected: Kriedeman Road (half road closure with hold and release for 2 minutes maximum) between Tamborine Oxenford Road and Gladrose Crescent

Show more

Start date: 17 April 2018

End date: 10 July 2018

Duration: 6.30am - 5pm

Reason: Pipe and Road works

north

Road closures

Planned - Temporary Road Closure Miami

Day 36 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 33 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 33 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 30 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 28 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 28 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 23 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 23 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 16 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 14 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 13 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 13 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 11 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 10 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 9 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 9 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 9 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 9 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 9 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 9 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 9 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 9 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 9 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Molendinar

Day 7 of 8

Streets affected: Gemini Circuit (half road closure with hold and release for 2 minutes maximum) multiple locations along road

Show more

Start date: 4 July 2018

End date: 11 July 2018

Duration: 7am - 6pm

Reason: Install coloured surfacing works

central

 
11 Jul - Wednesday
Road closures

Planned - Temporary road closure Yatala

Day 254 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 244 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 157 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 146 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 86 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Miami

Day 37 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 34 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 34 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 31 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 29 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 29 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 24 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 24 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 17 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 15 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 14 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 14 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 12 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 11 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 10 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 10 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 10 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 10 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 10 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 10 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 10 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 10 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 10 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Molendinar

Day 8 of 8

Streets affected: Gemini Circuit (half road closure with hold and release for 2 minutes maximum) multiple locations along road

Show more

Start date: 4 July 2018

End date: 11 July 2018

Duration: 7am - 6pm

Reason: Install coloured surfacing works

central

 
12 Jul - Thursday
Road closures

Planned - Temporary road closure Yatala

Day 255 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 245 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 158 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 147 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 87 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Miami

Day 38 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 35 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 35 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 32 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 30 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 30 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 25 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 25 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 18 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 16 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 15 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 15 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 13 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 12 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 11 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 11 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 11 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 11 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 11 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 11 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 11 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 11 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 11 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

 
13 Jul - Friday
Road closures

Planned - Temporary road closure Yatala

Day 256 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 246 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 159 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 148 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 88 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Miami

Day 39 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 36 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 36 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 33 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 31 of 31

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 13 June 2018

End date: 13 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing works

central

Road closures

Planned - Temporary Road Closure Bundall

Day 31 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 26 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 26 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 19 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 17 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 16 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 16 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Pimpama

Day 14 of 14

Streets affected: Armani Avenue (full road closure local traffic access only) between Winston Way and Matthews Crescent

Show more

Start date: 30 June 2018

End date: 13 July 2018

Duration: 7am - 5pm

Reason: Removal and demolition of old pit and installtion of new flow meter and pit

north

Road closures

Planned - Temporary Road Closure Coomera

Day 13 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 12 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 12 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 12 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 12 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 12 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 12 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 12 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 12 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 12 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

 
14 Jul - Saturday
Road closures

Planned - Temporary road closure Yatala

Day 257 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 247 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 160 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 149 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 89 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Miami

Day 40 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 37 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Benogin

Day 37 of 37

Streets affected: Glenmore Drive (half road closure with hold and release for 2 minutes maximum) between Gaw Terrace and Moondance Court

Show more

Start date: 8 June 2018

End date: 14 July 2018

(3 days work between dates )

Duration: 7am - 4pm

Reason: Guardrail works

hinterland

Road closures

Planned - Temporary Road Closure Tugun

Day 34 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 32 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 27 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 27 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 20 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 18 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 17 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 17 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 14 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 13

Streets affected: First Avenue (full road closure local traffic access only) between Old Burleigh Road and Surf Parade

Show more

Start date: 2 July 2018

End date: 14 July 2018

Duration: 12am - 11.59pm

Reason: Sewer and stormwater cross over works for Vue Development

south

Road closures

Planned - Temporary road closure Hope Island

Day 13 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 13 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 13 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 13 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 13 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 13 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 13 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 13 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 13 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

 
15 Jul - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 258 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 248 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 161 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 150 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 90 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Miami

Day 41 of 41

Streets affected: Nundah Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Sunshine Boulevard

Show more

Start date: 5 June 2018

End date: 15 July 2018

Duration: 7am - 5pm

Reason: Install coloured surfacing works

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 38 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 35 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 33 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 28 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 28 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 21 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Oxenford

Day 19 of 19

Streets affected: Old Pacific HIghway (half road closure with hold and release for 2 minutes maximum) between Leo Graham Way and Michigan Drive    

Show more

Start date: 27 June 2018

End date: 15 July 2018

Duration: 9am - 2.30pm

Reason: Installation of coloured surfacing works

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 18 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 18 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 15 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 14 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 14 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 14 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 14 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 14 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 14 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 14 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 14 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 14 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

 
16 Jul - Monday
Road closures

Planned - Temporary road closure Yatala

Day 259 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 249 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 162 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 151 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 91 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 39 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 36 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 34 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 29 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 29 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Hollywell

Day 22 of 22

Streets affected: Morala Avenue (partial lane closure) between Limetree Parade and Broadwater Street

Show more

Start date: 25 June 2018

End date: 16 July 2018

1 day only between dates                  

Duration: 9am - 2.30pm

Reason: Install coloured surfacing

north

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 19 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 19 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 16 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 15 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 15 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 15 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 15 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 15 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 15 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 15 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 15 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 15 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Main Beach

Day 1 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
17 Jul - Tuesday
Road closures

Planned - Temporary road closure Yatala

Day 260 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 250 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 163 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 152 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 92 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 40 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 37 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 35 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 30 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 30 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 20 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 20 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 17 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 16 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 16 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 16 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 16 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 16 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 16 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 16 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 16 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 16 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Main Beach

Day 2 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
18 Jul - Today
Road closures

Planned - Temporary road closure Yatala

Day 261 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 251 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 164 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 153 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 93 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 41 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 38 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 36 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 31 of 31

Streets affected: Berrigans Road and Rayner Lane (half road closure with hold and release for 2 minutes maximum) between Rayner Lane / Gold Coast Springbrook Road and Aleena Court / End of road        

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 7am - 4pm

Reason: Sign replacement

hinterland

Road closures

Planned - Temporary Road Closure Southport

Day 31 of 31

Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Johnston Street and Southport Nerang Road

Show more

Start date: 18 June 2018

End date: 18 July 2018

Duration: 9am - 2.30pm

Reason: Ground penetration radar testing

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 21 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 21 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 18 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 17 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 17 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 17 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 17 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 17 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 17 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 17 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 17 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 17 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Main Beach

Day 3 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
19 Jul - Thursday
Road closures

Planned - Temporary road closure Yatala

Day 262 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 252 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Currumbin Waters

Day 165 of 165

Streets affected: Judeller Road (full road closure local traffic access only) between Natasha Court and Reynton Street

Show more

Start date: 5 February 2018

End date: 19 July 2018

Duration: Continuous

Reason: Replacement of timber bridge

south

Road closures

Planned - Temporary Road Closure Ormeau

Day 154 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 94 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 42 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 39 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 37 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 22 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 22 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 19 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 18 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 18 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 18 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 18 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 18 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 18 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 18 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 18 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 18 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Main Beach

Day 4 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
20 Jul - Friday
Road closures

Planned - Temporary road closure Yatala

Day 263 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 253 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 155 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 95 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 43 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 40 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 38 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 23 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 23 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 20 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 19 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 19 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 19 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 19 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 19 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 19 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 19 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 19 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Mudgeeraba

Day 19 of 19

Streets affected: Somerset Drive and Gemvale Road (lane closure) between Jarema Drive and Clover Hill Drive / Alvey Court

Show more

Start date: 2 July 2018

End date: 20 July 2018

Duration: 7am - 5pm

Reason: Installation of an ITS sign

hinterland

Road closures

Planned - Temporary Road Closure Main Beach

Day 5 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
21 Jul - Saturday
Road closures

Planned - Temporary road closure Yatala

Day 264 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 254 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 156 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 96 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 44 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 41 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 39 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 24 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 24 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 21 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 20 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 20 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 20 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 20 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 20 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 20 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 20 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 20 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 6 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
22 Jul - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 265 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 255 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 157 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 97 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 45 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 42 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 40 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 25 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 25 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 22 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 21 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 21 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 21 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 21 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 21 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 21 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 21 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 21 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 7 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
23 Jul - Monday
Road closures

Planned - Temporary road closure Yatala

Day 266 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 256 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 158 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 98 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 46 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 43 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 41 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 26 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 26 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 23 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 22 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 22 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 22 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 22 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 22 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 22 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 22 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 22 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 8 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
24 Jul - Tuesday
Road closures

Planned - Temporary road closure Yatala

Day 267 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 257 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 159 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 99 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 47 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 44 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 42 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 27 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 27 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 24 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 23 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 23 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 23 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 23 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 23 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 23 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 23 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 23 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 9 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
25 Jul - Wednesday
Road closures

Planned - Temporary road closure Yatala

Day 268 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 258 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 160 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 100 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 48 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 45 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Bundall

Day 43 of 43

Streets affected: Platypus Avenue (half road closure with hold and release for 2 minutes maximum) between Kookaburra Court and Boomerang Crescent     

Show more

Start date: 13 June 2018

End date: 25 July 2018

Duration: 7am - 4pm

Reason: Stormwater works

central

Road closures

Planned - Temporary Road Closure Varsity Lakes

Day 28 of 28

Streets affected: Christine Avenue (lane closure) between Regensberg Close and Warbler Parade

Show more

Start date: 28 June 2018

End date: 25 July 2018

Duration: 6.30am - 6.30pm (school holidays) / 9.30am - 2.30pm

Reason: Reconstruction of kerb ramps at intersections

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 28 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 25 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 24 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 24 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 24 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 24 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 24 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 24 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 24 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 24 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 10 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

 
26 Jul - Thursday
Road closures

Planned - Temporary road closure Yatala

Day 269 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 259 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 161 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 101 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 49 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 46 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 29 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 26 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 25 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 25 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 25 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 25 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 25 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 25 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 25 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 25 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 11 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 1 of 5

Streets affected: Queensland Avenue (between Federation Avenue and Jubilee Avenue) and Surf Parade (Capricornia Avenue and Charles Avenue) 

(full road closures due to CITY EVENT)

 

Show more

Start date: 26 July 2018

End date: 30/07/2018

Duration: 2pm - 3am

Reason: CITY EVENT - GROUNDWATER COUNTRY MUSIC FESTIVAL 2018

south

 
27 Jul - Friday
Road closures

Planned - Temporary road closure Yatala

Day 270 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 260 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 162 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 102 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 50 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 47 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 30 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 27 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 26 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 26 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 26 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 26 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 26 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 26 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 26 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 26 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Main Beach

Day 12 of 12

Streets affected: Tedder Avenue (half road closure with hold and release for 2 minutes maximum) between Hughes Avenue and Cronin Avenue

Show more

Start date: 16 July 2018

End date: 27 July 2018

Duration: 4am - 6pm

Reason: Installation of coloured surfacing

central

Road closures

Planned - Temporary Road Closure Broadbeach

Day 2 of 5

Streets affected: Queensland Avenue (between Federation Avenue and Jubilee Avenue) and Surf Parade (Capricornia Avenue and Charles Avenue) 

(full road closures due to CITY EVENT)

 

Show more

Start date: 26 July 2018

End date: 30/07/2018

Duration: 2pm - 3am

Reason: CITY EVENT - GROUNDWATER COUNTRY MUSIC FESTIVAL 2018

south

 
28 Jul - Saturday
Road closures

Planned - Temporary road closure Yatala

Day 271 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 261 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 163 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 103 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 51 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 48 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Burleigh Waters

Day 31 of 31

Streets affected: Christine Avenue (half road closure with hold and release for 2 minutes maximum) between Galeen Avenue and Barbet Place       

Show more

Start date: 28 June 2018

End date: 28 July 2018

Duration: 7am - 5pm

Reason: Reconfiguring existing pedestrian crossings (including new line marking and ramp installation)

south

Road closures

Planned - Temporary Road Closure Coomera

Day 28 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 27 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 27 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 27 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 27 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 27 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 27 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 27 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 27 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 3 of 5

Streets affected: Queensland Avenue (between Federation Avenue and Jubilee Avenue) and Surf Parade (Capricornia Avenue and Charles Avenue) 

(full road closures due to CITY EVENT)

 

Show more

Start date: 26 July 2018

End date: 30/07/2018

Duration: 2pm - 3am

Reason: CITY EVENT - GROUNDWATER COUNTRY MUSIC FESTIVAL 2018

south

 
29 Jul - Sunday
Road closures

Planned - Temporary road closure Yatala

Day 272 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 262 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 164 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 104 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 52 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 49 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Coomera

Day 29 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 28 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 28 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 28 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 28 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 28 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 28 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 28 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 28 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 4 of 5

Streets affected: Queensland Avenue (between Federation Avenue and Jubilee Avenue) and Surf Parade (Capricornia Avenue and Charles Avenue) 

(full road closures due to CITY EVENT)

 

Show more

Start date: 26 July 2018

End date: 30/07/2018

Duration: 2pm - 3am

Reason: CITY EVENT - GROUNDWATER COUNTRY MUSIC FESTIVAL 2018

south

 
30 Jul - Monday
Road closures

Planned - Temporary road closure Yatala

Day 273 of 273

Streets affected: Burnside Road (half road closure with hold and release for 2 minutes maximum) between Eastern Service Road and Prairie Road

                     

Show more

Start date: 31 October 2017

End date: 31 July 2017

Duration: Continuous

Reason: Asphalt works

north

Road closures

Planned - Temporary road closure Yatala

Day 263 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 165 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 105 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 53 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 50 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Coomera

Day 30 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 29 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 29 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 29 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 29 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 29 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 29 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 29 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 29 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Broadbeach

Day 5 of 5

Streets affected: Queensland Avenue (between Federation Avenue and Jubilee Avenue) and Surf Parade (Capricornia Avenue and Charles Avenue) 

(full road closures due to CITY EVENT)

 

Show more

Start date: 26 July 2018

End date: 30/07/2018

Duration: 2pm - 3am

Reason: CITY EVENT - GROUNDWATER COUNTRY MUSIC FESTIVAL 2018

south

 
31 Jul - Tuesday
Road closures

Planned - Temporary road closure Yatala

Day 264 of 537

Streets affected: Stanmore Road (half road closure with hold and release for 2 minutes maximum) between Peachey Road and Enkleman Road

                  

Show more

Start date: 10 November 2017

End date: 30 April 2019

Duration: 6.30am - 4.27pm

Reason: Upgrade to 4 lane road with off road shared path   

north

Road closures

Planned - Temporary Road Closure Ormeau

Day 166 of 169

Streets affected: Upper Ormeau Road (half road closure with hold and release for 2 minutes maximum) between Landsdown Road and Thompson Road

Show more

Start date: 16 February 2018

End date: 3 August 2018

Duration: 6.30am - 4.30pm

Reason: Road upgrade

north

Road closures

Planned - Temporary Road Closure Mermaid Beach

Day 106 of 106

Streets affected: Dudley Street, Venice Street and Ocean Avenue (half road closure with hold and release for 2 minutes maximum - full road closure only if works cannot be plated outside of work hours) between Gold Coast Highway and Hedges Avenue

Show more

Start date: 17 April 2018

End date: 31 July 2018

Duration: 6.30am - 6.30pm

Reason: Catchment upgrade

south

Road closures

Planned - Temporary Road Closure Currumbin

Day 54 of 184

Streets affected: Boundary Street and Hayter Street (half road closure with hold and release for 2 minutes maximum) between Jewel Street / Boundary Street and Hayter Street / Judeller Road

Show more

Start date: 8 June 2018

End date: 8 December 2018

Duration: 6.30am - 6.30pm

Reason: Storm water pipeline construction

south

Road closures

Planned - Temporary Road Closure Tugun

Day 51 of 51

Streets affected: Cabarita Avenue (half road closure with hold and release for 2 minutes maximum) between Malpara Street and Kaleena Street

Show more

Start date: 11 June 2018

End date: 31 July 2018

Duration: 6.30am - 3.30pm

Reason: Construction of new bridge

south

Road closures

Planned - Temporary Road Closure Coomera

Day 31 of 62

Streets affected: Oakey Creek Road (between Foxwell Road and End of Road) and Foxwell Road (between Learning Road and Jotown Drive)

(lane closure)

Show more

Start date: 1 July 2018

End date: 31 August 2018

Duration: 6.30am - 6pm and outside of hours for aftercare

Reason: Installation of traffic signals and new line marking

north

Road closures

Planned - Temporary road closure Hope Island

Day 30 of 63

Streets affected: Marine Quays Boulevard (full road closure local traffic access only) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 30 of 63

Streets affected: Mervyn Thomas Drive (full road closure local traffic access only) between Marina Quays Boulevard and Broadwater Avenue

 

Show more

Start date: 2 July 2018

End date: 2 September 2018

Duration: Continuous

Reason: Civil construction works

north

Road closures

Planned - Temporary road closure Hope Island

Day 30 of 73

Streets affected: Marina Quays Boulevard (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018                

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 30 of 73

Streets affected: Broadwater Avenue (lane closure) between Sickle Avenue and Mervyn Thomas Drive

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary road closure Hope Island

Day 30 of 73

Streets affected: Mervyn Thomas Drive (lane closure) between Marina Quays Boulevard and Broadbwater Avenue

 

Show more

Start date: 2 July 2018

End date: 12 September 2018               

Duration: Continuous

Reason: Watermain/stormwater connection works

north

Road closures

Planned - Temporary Road Closure Broadbeach

Day 30 of 32

Streets affected: Surf Parade (full road closure local traffic access only) between Queensland Avenue and Albert Avenue

Show more

Start date: 2 July 2018 (install) - 29 July 2018 (Deinstall)

End date: 5 July 2018 (install)  - 2 August 2018 (Deinstall)

Duration: 1am - 4am

Reason: Installation and deinstallation of street banners

south

Road closures

Planned - Temporary Road Closure Miami

Day 30 of 152

Streets affected: Mountain View Avenue (full road closure local traffic access only) between Honeyeater Drive and Nobby Parade

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6.30am - 6.30pm

Reason: Installation of major stormwater culvert

south

Road closures

Planned - Temporary Road Closure Miami

Day 30 of 152

Streets affected: Mountain View Avenue (full road closure access to local traffic, emergency services and deliveries only) between Honeyeater Drive and Nobby Parade

 

Show more

Start date: 2 July 2018

End date: 30 November 2018

Duration: 6:30am - 6:30pm

Reason: Installation of major stormwater culvert