Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
This section of our Media Centre provides alerts and advice on current issues with City of Gold Coast (City) services and facilities.
Note: For real-time official emergency information including closure of roads during a serious weather event or natural disaster, visit the Queensland Government's qldalert.com and 13 19 40 Traffic and Travel information websites. Please also refer to City of Gold Coast's disaster management and emergency contacts information.
For information on water and sewerage construction and maintenance projects in your area, please visit cityofgoldcoast.com.au/gcwprojects.
For closures of sports fields due to wet weather or renovations, please visit cityofgoldcoast.com.au/sportsfieldclosures.
To find an alert in your area, simply filter by keyword or category and select 'Apply'. You can also subscribe to RSS feeds for alerts.
Day 262 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 246 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 200 of 200
Streets affected: Old Coach Road between Phaeton Street and Days Road; Days Road between Coomera Grand Drive and Old Coach Road (verge/footpath closure)
Show moreStart date: 14 January 2019
End date: 1 August 2019
Duration: 12am – 11:59pm
Reason: Intersection Upgrade of Old Coach Road and Days Road
north
Day 200 of 200
Streets affected: Old Coach Road between Days Road and Coomera Grand Drive; also between Phaeton Street and Days Road (partial lane, bike lane and verge/footpath closure)
Show moreStart date: 14 January 2019
End date: 1 August 2019
Duration: 6:30am – 6:30pm
Reason: Intersection upgrade of Old Coach Road and Days Road
north
Day 181 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 138 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 92 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 86 of 93
Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate site sheds and material storage for development site
south
Day 86 of 93
Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction Works
south
Day 86 of 93
Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 86 of 93
Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Detour for one way of traffic to facilitate concrete pours
south
Day 85 of 92
Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreAlso affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue
Start date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate vehicle movement in and out of construction site
south
Day 85 of 92
Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street
Show moreStart date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate material and equipment deliveries plus various construction activities
north
Day 78 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 78 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 73 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 67 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 65 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 64 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 62 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 62 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 59 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 58 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 57 of 62
Streets affected: Marina Quays Boulevard between Sickle Avenue and Mervyn Thomas Drive (hold and release for 2 minutes maximum) and Mervyn Thomas Drive between Marina Quays Boulevard and Broadwater Avenue (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 6 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Rectification and maintenance works for development
north
Day 57 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 56 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 56 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 56 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 56 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 55 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 55 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 50 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 46 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 46 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 46 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 44 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 43 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 43 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 42 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 42 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 41 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 39 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 38 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 38 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 37 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 36 of 41
Streets affected: Bonogin Road (shoulder/verge, half road closure with hold and release for 2 minutes maximum) between Hersden Court and Bush Swallow Road
Show more
Start date: 27 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Removal of batter and widening of the shoulder to improve visibility for those exiting a driveway
north
Day 36 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 33 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 32 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 32 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 32 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 32 of 32
Streets affected: Surfers Avenue (parking lane, half road closure with hold and release for 2 minutes maximum) between Sunshine Boulevarde and Northview Street
Show moreStart date: 1 July 2019
End date: 1 August 2019
Duration: 9:30am – 2:30pm
Reason: Geotechnical pavement investigation.
south
Day 30 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 30 of 31
Streets affected: Mallana Street (half road closure with hold and release for 2 minutes maximum) between Holborrow Close and end of road
Show more
Start date: 3 July 2019
End date: 2 August 2019
Duration: 6:30am – 6:30pm
Reason: Delivery of construction materials and equipment to site
north
Day 30 of 32
Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone and half road closure) between Bay Street and Windmill Street
Show more
Start date: 3 July 2019
End date: 3 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction deliveries when required
north
Day 28 of 31
Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street
Show more
Start date: 5 July 2019
End date: 4 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate movement of construction vehicles and material to site.
north
Day 28 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 25 of 32
Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Avenue and Old Burleigh Road
Show moreStart date: 8 July 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 24 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 21 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 18 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 18 of 22
Streets affected: McLaren Road between Yarrimbah Drive and Mackellar Drive and also Oakdale Avenue between McLaren Road and Carnie Court (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 18 of 22
Streets affected: McLaren Road between Beaudesert Nerang Road and Oakdale Avenue/Winchester Drive and also Yarrimbah Drive between McLaren Road and Dugandan Street (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 16 of 18
Streets affected: Gold Coast Highway (verge/footpath closure with hold and release for 2 minutes maximum) between Admiralty Drive and Birt Avenue
Show moreStart date: 17 July 2019
End date: 3 August 2019
Thursdays and Fridays only
Duration: 6:30am – 3:30pm
Reason: To facilitate concrete pours
north
Day 16 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 15 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 14 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 12 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 12 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 11 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 11 of 15
Streets affected: University Drive (verge/footpath and parking lane closure) between University Drive and Cottesloe Drive
Show more
Start date: 22 July 2019
End date: 5 August 2019
Duration: 6:30am – 5:30pm
Reason: Construction of a new bus stop
south
Day 11 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 11 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 11 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 10 of 16
Streets affected: Palm Beach Avenue (full road closure with detours) between Philippine Parade and Gold Coast Highway
Show more
Start date: 22 July 2019
End date: 7 August 2019
Duration: 7:30pm – 5:00am (night works)
Reason: Roadway profiling followed by asphalt layers to road pavement
south
Day 10 of 10
Streets affected: Ferny Avenue (lane closure) between Clifford Street and Elkhorn Avenue
Show moreStart date: 22 July 2019
End date: 1 August 2019
Duration: 8pm – 5am
Reason: To facilitate sewer reline
north
Day 10 of 11
Streets affected: Markeri Street between Robina Parkway and Caulfield Street and also Robina Parkway between Boowaggan Road and Paradise Springs Avenue (lane (some lateral shift), bike lane, parking lane/bay closure)
Show more
Start date: 23 July 2019
End date: 2 August 2019
Duration: 9:00am – 3:00pm
Reason: Installation of new bike posts and push buttons
south
Day 10 of 11
Streets affected: Nineteenth Avenue between Mallawa Drive and Brooke Avenue and Townson Avenue between Lind Avenue and Dolphin Court (lane - some lateral shift, bike lane, parking lane / bay closure)
Show more
Start date: 23 July 2019
End date: 2 August 2019
Duration: 9:00am – 3:00pm
Reason: Installation of new bike posts and push buttons
south
Day 8 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 8 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 8 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 8 of 9
Streets affected: Pacific Street (lane, verge/footpath closure with hold and release for 2 minutes maximum) between Breaker Street and Main Beach Parade
Show more
Start date: 25 July 2019
End date: 2 August 2019
Duration: 7:00am – 5:00pm
Reason: Installation of new gas service
north
Day 8 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 7 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 7 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 7 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 6 of 12
Streets affected: 1. Reserve Road between Goldcrest Drive and Pandanus Place 2. Brygon Creek Drive between Mockingbird Drive 3. Jessica Drive between Reserve Roa dand Jacob Court (lane, bike lane)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00am – 2:30pm
Reason: Installation of new bike posts and push button
north
Day 5 of 11
Streets affected: Ashmore Road between Boree Street and Tambourah Drive and Heeb Street between Ashmore Road and Tambourah Drive (bike lane, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 7:00pm – 6:00am
Reason: Install new footing for bike post and push button
north
Day 5 of 11
Streets affected: Gold Coast Highway between Railway Street and Marshall Lane and Nind Street between Scarborough Street and Gold Coast Highway (lane, bike lane closure)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00pm – 6:00am
Reason: Loop cutting works
north
Day 4 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 4 of 6
Streets affected: Sonder Street (full road with detours) between Chant Street and Sarasota Key
Show more
Start date: 29 July 2019
End date: 3 August 2019
Duration: 6:30am – 6:30pm
Reason: Intermittent manhole access for stormwater pipe relining works
south
Day 4 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 4 of 5
Streets affected: Gold Coast Highway (shoulder, verge/footpath, lane closure with hold and release for 2 minutes maximum) between Tedder Avenue and Ferny Avenue
Show more
Start date: 29 July 2019
End date: 2 August 2019
Duration: 9:00am – 4:00pm
Reason: Install coloured surfacing works
north
Day 3 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 3 of 8
Streets affected: Victoria Parade (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Broadbeach Mall
Show more
Start date: 30 July 2019
End date: 6 August 2019
Duration: 6:30am – 5:30pm
Reason: Construct new pedestrian ramps and refuge island for pedestrian crossing
south
Day 3 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 3 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 3 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 2 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 2 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 2 of 3
Streets affected: 1. Musgrave Avenue between Erica Court and Turpind Road 2. Wilson Street between Musgrave Avenue and Jimmieson Avenue 3. Chirn Crescent between Musgrave Avenue and Turpin Road (shoulder, bike lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 31 July 2019
End date: 2 August 2019
Duration: 9:00am – 2:30pm
Reason: Facilitate borehole testing
north
Day 2 of 6
Streets affected: Waterways Drive (shoulder, verge/footpath, lane, parking lane/bay closure) between Main Beach Parade and Gold Coast Highway
Show moreStart date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 2 of 6
Streets affected: Tedder Avenue (shoulder, verge/footpath, lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Main Beach Parade and Montgomery Avenue
Show more
Start date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 2 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 1 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 1 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 1 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 1 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 0 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 263 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 247 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 182 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 139 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 93 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 87 of 93
Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate site sheds and material storage for development site
south
Day 87 of 93
Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction Works
south
Day 87 of 93
Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 87 of 93
Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Detour for one way of traffic to facilitate concrete pours
south
Day 86 of 92
Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreAlso affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue
Start date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate vehicle movement in and out of construction site
south
Day 86 of 92
Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street
Show moreStart date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate material and equipment deliveries plus various construction activities
north
Day 79 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 79 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 74 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 68 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 66 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 65 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 63 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 63 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 60 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 59 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 58 of 62
Streets affected: Marina Quays Boulevard between Sickle Avenue and Mervyn Thomas Drive (hold and release for 2 minutes maximum) and Mervyn Thomas Drive between Marina Quays Boulevard and Broadwater Avenue (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 6 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Rectification and maintenance works for development
north
Day 58 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 57 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 57 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 57 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 57 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 56 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 56 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 51 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 47 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 47 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 47 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 45 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 44 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 44 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 43 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 43 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 42 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 40 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 39 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 39 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 38 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 37 of 41
Streets affected: Bonogin Road (shoulder/verge, half road closure with hold and release for 2 minutes maximum) between Hersden Court and Bush Swallow Road
Show more
Start date: 27 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Removal of batter and widening of the shoulder to improve visibility for those exiting a driveway
north
Day 37 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 34 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 33 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 33 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 33 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 31 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 31 of 31
Streets affected: Mallana Street (half road closure with hold and release for 2 minutes maximum) between Holborrow Close and end of road
Show more
Start date: 3 July 2019
End date: 2 August 2019
Duration: 6:30am – 6:30pm
Reason: Delivery of construction materials and equipment to site
north
Day 31 of 32
Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone and half road closure) between Bay Street and Windmill Street
Show more
Start date: 3 July 2019
End date: 3 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction deliveries when required
north
Day 29 of 31
Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street
Show more
Start date: 5 July 2019
End date: 4 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate movement of construction vehicles and material to site.
north
Day 29 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 26 of 32
Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Avenue and Old Burleigh Road
Show moreStart date: 8 July 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 25 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 22 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 19 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 19 of 22
Streets affected: McLaren Road between Yarrimbah Drive and Mackellar Drive and also Oakdale Avenue between McLaren Road and Carnie Court (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 19 of 22
Streets affected: McLaren Road between Beaudesert Nerang Road and Oakdale Avenue/Winchester Drive and also Yarrimbah Drive between McLaren Road and Dugandan Street (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 17 of 18
Streets affected: Gold Coast Highway (verge/footpath closure with hold and release for 2 minutes maximum) between Admiralty Drive and Birt Avenue
Show moreStart date: 17 July 2019
End date: 3 August 2019
Thursdays and Fridays only
Duration: 6:30am – 3:30pm
Reason: To facilitate concrete pours
north
Day 17 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 16 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 15 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 13 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 13 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 12 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 12 of 15
Streets affected: University Drive (verge/footpath and parking lane closure) between University Drive and Cottesloe Drive
Show more
Start date: 22 July 2019
End date: 5 August 2019
Duration: 6:30am – 5:30pm
Reason: Construction of a new bus stop
south
Day 12 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 12 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 12 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 11 of 16
Streets affected: Palm Beach Avenue (full road closure with detours) between Philippine Parade and Gold Coast Highway
Show more
Start date: 22 July 2019
End date: 7 August 2019
Duration: 7:30pm – 5:00am (night works)
Reason: Roadway profiling followed by asphalt layers to road pavement
south
Day 11 of 11
Streets affected: Markeri Street between Robina Parkway and Caulfield Street and also Robina Parkway between Boowaggan Road and Paradise Springs Avenue (lane (some lateral shift), bike lane, parking lane/bay closure)
Show more
Start date: 23 July 2019
End date: 2 August 2019
Duration: 9:00am – 3:00pm
Reason: Installation of new bike posts and push buttons
south
Day 11 of 11
Streets affected: Nineteenth Avenue between Mallawa Drive and Brooke Avenue and Townson Avenue between Lind Avenue and Dolphin Court (lane - some lateral shift, bike lane, parking lane / bay closure)
Show more
Start date: 23 July 2019
End date: 2 August 2019
Duration: 9:00am – 3:00pm
Reason: Installation of new bike posts and push buttons
south
Day 9 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 9 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 9 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 9 of 9
Streets affected: Pacific Street (lane, verge/footpath closure with hold and release for 2 minutes maximum) between Breaker Street and Main Beach Parade
Show more
Start date: 25 July 2019
End date: 2 August 2019
Duration: 7:00am – 5:00pm
Reason: Installation of new gas service
north
Day 9 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 8 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 8 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 8 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 7 of 12
Streets affected: 1. Reserve Road between Goldcrest Drive and Pandanus Place 2. Brygon Creek Drive between Mockingbird Drive 3. Jessica Drive between Reserve Roa dand Jacob Court (lane, bike lane)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00am – 2:30pm
Reason: Installation of new bike posts and push button
north
Day 6 of 11
Streets affected: Ashmore Road between Boree Street and Tambourah Drive and Heeb Street between Ashmore Road and Tambourah Drive (bike lane, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 7:00pm – 6:00am
Reason: Install new footing for bike post and push button
north
Day 6 of 11
Streets affected: Gold Coast Highway between Railway Street and Marshall Lane and Nind Street between Scarborough Street and Gold Coast Highway (lane, bike lane closure)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00pm – 6:00am
Reason: Loop cutting works
north
Day 5 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 5 of 6
Streets affected: Sonder Street (full road with detours) between Chant Street and Sarasota Key
Show more
Start date: 29 July 2019
End date: 3 August 2019
Duration: 6:30am – 6:30pm
Reason: Intermittent manhole access for stormwater pipe relining works
south
Day 5 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 5 of 5
Streets affected: Gold Coast Highway (shoulder, verge/footpath, lane closure with hold and release for 2 minutes maximum) between Tedder Avenue and Ferny Avenue
Show more
Start date: 29 July 2019
End date: 2 August 2019
Duration: 9:00am – 4:00pm
Reason: Install coloured surfacing works
north
Day 4 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 4 of 8
Streets affected: Victoria Parade (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Broadbeach Mall
Show more
Start date: 30 July 2019
End date: 6 August 2019
Duration: 6:30am – 5:30pm
Reason: Construct new pedestrian ramps and refuge island for pedestrian crossing
south
Day 4 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 4 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 4 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 3 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 3 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 3 of 3
Streets affected: 1. Musgrave Avenue between Erica Court and Turpind Road 2. Wilson Street between Musgrave Avenue and Jimmieson Avenue 3. Chirn Crescent between Musgrave Avenue and Turpin Road (shoulder, bike lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 31 July 2019
End date: 2 August 2019
Duration: 9:00am – 2:30pm
Reason: Facilitate borehole testing
north
Day 3 of 6
Streets affected: Waterways Drive (shoulder, verge/footpath, lane, parking lane/bay closure) between Main Beach Parade and Gold Coast Highway
Show moreStart date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 3 of 6
Streets affected: Tedder Avenue (shoulder, verge/footpath, lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Main Beach Parade and Montgomery Avenue
Show more
Start date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 3 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 2 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 2 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 2 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 2 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 1 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 264 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 248 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 183 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 140 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 94 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 88 of 93
Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate site sheds and material storage for development site
south
Day 88 of 93
Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction Works
south
Day 88 of 93
Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 88 of 93
Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Detour for one way of traffic to facilitate concrete pours
south
Day 87 of 92
Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreAlso affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue
Start date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate vehicle movement in and out of construction site
south
Day 87 of 92
Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street
Show moreStart date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate material and equipment deliveries plus various construction activities
north
Day 80 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 80 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 75 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 69 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 67 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 66 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 64 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 64 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 61 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 60 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 59 of 62
Streets affected: Marina Quays Boulevard between Sickle Avenue and Mervyn Thomas Drive (hold and release for 2 minutes maximum) and Mervyn Thomas Drive between Marina Quays Boulevard and Broadwater Avenue (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 6 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Rectification and maintenance works for development
north
Day 59 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 58 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 58 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 58 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 58 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 57 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 57 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 52 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 48 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 48 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 48 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 46 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 45 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 45 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 44 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 44 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 43 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 41 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 40 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 40 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 39 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 38 of 41
Streets affected: Bonogin Road (shoulder/verge, half road closure with hold and release for 2 minutes maximum) between Hersden Court and Bush Swallow Road
Show more
Start date: 27 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Removal of batter and widening of the shoulder to improve visibility for those exiting a driveway
north
Day 38 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 35 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 34 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 34 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 34 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 32 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 32 of 32
Streets affected: Davenport Street (lateral shift lane, parking lane/bay, metered parking/loading zone and half road closure) between Bay Street and Windmill Street
Show more
Start date: 3 July 2019
End date: 3 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction deliveries when required
north
Day 30 of 31
Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street
Show more
Start date: 5 July 2019
End date: 4 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate movement of construction vehicles and material to site.
north
Day 30 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 27 of 32
Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Avenue and Old Burleigh Road
Show moreStart date: 8 July 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 26 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 23 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 20 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 20 of 22
Streets affected: McLaren Road between Yarrimbah Drive and Mackellar Drive and also Oakdale Avenue between McLaren Road and Carnie Court (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 20 of 22
Streets affected: McLaren Road between Beaudesert Nerang Road and Oakdale Avenue/Winchester Drive and also Yarrimbah Drive between McLaren Road and Dugandan Street (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 18 of 18
Streets affected: Gold Coast Highway (verge/footpath closure with hold and release for 2 minutes maximum) between Admiralty Drive and Birt Avenue
Show moreStart date: 17 July 2019
End date: 3 August 2019
Thursdays and Fridays only
Duration: 6:30am – 3:30pm
Reason: To facilitate concrete pours
north
Day 18 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 17 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 16 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 14 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 14 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 13 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 13 of 15
Streets affected: University Drive (verge/footpath and parking lane closure) between University Drive and Cottesloe Drive
Show more
Start date: 22 July 2019
End date: 5 August 2019
Duration: 6:30am – 5:30pm
Reason: Construction of a new bus stop
south
Day 13 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 13 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 13 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 12 of 16
Streets affected: Palm Beach Avenue (full road closure with detours) between Philippine Parade and Gold Coast Highway
Show more
Start date: 22 July 2019
End date: 7 August 2019
Duration: 7:30pm – 5:00am (night works)
Reason: Roadway profiling followed by asphalt layers to road pavement
south
Day 10 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 10 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 10 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 10 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 9 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 9 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 9 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 8 of 12
Streets affected: 1. Reserve Road between Goldcrest Drive and Pandanus Place 2. Brygon Creek Drive between Mockingbird Drive 3. Jessica Drive between Reserve Roa dand Jacob Court (lane, bike lane)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00am – 2:30pm
Reason: Installation of new bike posts and push button
north
Day 7 of 11
Streets affected: Ashmore Road between Boree Street and Tambourah Drive and Heeb Street between Ashmore Road and Tambourah Drive (bike lane, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 7:00pm – 6:00am
Reason: Install new footing for bike post and push button
north
Day 7 of 11
Streets affected: Gold Coast Highway between Railway Street and Marshall Lane and Nind Street between Scarborough Street and Gold Coast Highway (lane, bike lane closure)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00pm – 6:00am
Reason: Loop cutting works
north
Day 6 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 6 of 6
Streets affected: Sonder Street (full road with detours) between Chant Street and Sarasota Key
Show more
Start date: 29 July 2019
End date: 3 August 2019
Duration: 6:30am – 6:30pm
Reason: Intermittent manhole access for stormwater pipe relining works
south
Day 6 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 5 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 5 of 8
Streets affected: Victoria Parade (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Broadbeach Mall
Show more
Start date: 30 July 2019
End date: 6 August 2019
Duration: 6:30am – 5:30pm
Reason: Construct new pedestrian ramps and refuge island for pedestrian crossing
south
Day 5 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 5 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 5 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 4 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 4 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 4 of 6
Streets affected: Waterways Drive (shoulder, verge/footpath, lane, parking lane/bay closure) between Main Beach Parade and Gold Coast Highway
Show moreStart date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 4 of 6
Streets affected: Tedder Avenue (shoulder, verge/footpath, lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Main Beach Parade and Montgomery Avenue
Show more
Start date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 4 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 3 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 3 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 3 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 3 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 2 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
12.00pm - 9.00pm
Streets affected: Varsity Parade between Assembly Drive and Lake Street (verge/footpath and full road closure)
Show more
Start date: 3 August 2019
End date: 3 August 2019
Duration: Midday – 9:00pm
Reason: Varsity Winterfest 2019 event
south
Day 265 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 249 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 184 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 141 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 95 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 89 of 93
Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate site sheds and material storage for development site
south
Day 89 of 93
Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction Works
south
Day 89 of 93
Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 89 of 93
Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Detour for one way of traffic to facilitate concrete pours
south
Day 88 of 92
Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreAlso affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue
Start date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate vehicle movement in and out of construction site
south
Day 88 of 92
Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street
Show moreStart date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate material and equipment deliveries plus various construction activities
north
Day 81 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 81 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 76 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 70 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 68 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 67 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 65 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 65 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 62 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 61 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 60 of 62
Streets affected: Marina Quays Boulevard between Sickle Avenue and Mervyn Thomas Drive (hold and release for 2 minutes maximum) and Mervyn Thomas Drive between Marina Quays Boulevard and Broadwater Avenue (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 6 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Rectification and maintenance works for development
north
Day 60 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 59 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 59 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 59 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 59 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 58 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 58 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 53 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 49 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 49 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 49 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 47 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 46 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 46 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 45 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 45 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 44 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 42 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 41 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 41 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 40 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 39 of 41
Streets affected: Bonogin Road (shoulder/verge, half road closure with hold and release for 2 minutes maximum) between Hersden Court and Bush Swallow Road
Show more
Start date: 27 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Removal of batter and widening of the shoulder to improve visibility for those exiting a driveway
north
Day 39 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 36 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 35 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 35 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 35 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 33 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 31 of 31
Streets affected: Old Burleigh Road (half road closure with hold and release for 2 minutes maximum) between Wharf Road and Fern Street
Show more
Start date: 5 July 2019
End date: 4 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate movement of construction vehicles and material to site.
north
Day 31 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 28 of 32
Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Avenue and Old Burleigh Road
Show moreStart date: 8 July 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 27 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 24 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 21 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 21 of 22
Streets affected: McLaren Road between Yarrimbah Drive and Mackellar Drive and also Oakdale Avenue between McLaren Road and Carnie Court (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 21 of 22
Streets affected: McLaren Road between Beaudesert Nerang Road and Oakdale Avenue/Winchester Drive and also Yarrimbah Drive between McLaren Road and Dugandan Street (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 19 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 18 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 17 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 15 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 15 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 14 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 14 of 15
Streets affected: University Drive (verge/footpath and parking lane closure) between University Drive and Cottesloe Drive
Show more
Start date: 22 July 2019
End date: 5 August 2019
Duration: 6:30am – 5:30pm
Reason: Construction of a new bus stop
south
Day 14 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 14 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 14 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 13 of 16
Streets affected: Palm Beach Avenue (full road closure with detours) between Philippine Parade and Gold Coast Highway
Show more
Start date: 22 July 2019
End date: 7 August 2019
Duration: 7:30pm – 5:00am (night works)
Reason: Roadway profiling followed by asphalt layers to road pavement
south
Day 11 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 11 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 11 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 11 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 10 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 10 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 10 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 9 of 12
Streets affected: 1. Reserve Road between Goldcrest Drive and Pandanus Place 2. Brygon Creek Drive between Mockingbird Drive 3. Jessica Drive between Reserve Roa dand Jacob Court (lane, bike lane)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00am – 2:30pm
Reason: Installation of new bike posts and push button
north
Day 8 of 11
Streets affected: Ashmore Road between Boree Street and Tambourah Drive and Heeb Street between Ashmore Road and Tambourah Drive (bike lane, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 7:00pm – 6:00am
Reason: Install new footing for bike post and push button
north
Day 8 of 11
Streets affected: Gold Coast Highway between Railway Street and Marshall Lane and Nind Street between Scarborough Street and Gold Coast Highway (lane, bike lane closure)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00pm – 6:00am
Reason: Loop cutting works
north
Day 7 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 7 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 6 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 6 of 8
Streets affected: Victoria Parade (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Broadbeach Mall
Show more
Start date: 30 July 2019
End date: 6 August 2019
Duration: 6:30am – 5:30pm
Reason: Construct new pedestrian ramps and refuge island for pedestrian crossing
south
Day 6 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 6 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 6 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 5 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 5 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 5 of 6
Streets affected: Waterways Drive (shoulder, verge/footpath, lane, parking lane/bay closure) between Main Beach Parade and Gold Coast Highway
Show moreStart date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 5 of 6
Streets affected: Tedder Avenue (shoulder, verge/footpath, lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Main Beach Parade and Montgomery Avenue
Show more
Start date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 5 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 4 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 4 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 4 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 4 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 3 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 1 of 5
Streets affected: Scarborough Street between White Street and Hinze Street and also Young Street between Garden Street and Scarborough Street (full road closure with detour and hold and release for 2 minutes maximum)
Show more
Start date: 4 August 2019
End date: 8 August 2019
Duration: Midnight – 4:00am
Reason: Facilitate line marking works for light rail corridor
north
Day 266 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 250 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 185 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 142 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 96 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 90 of 93
Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate site sheds and material storage for development site
south
Day 90 of 93
Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction Works
south
Day 90 of 93
Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 90 of 93
Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Detour for one way of traffic to facilitate concrete pours
south
Day 89 of 92
Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreAlso affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue
Start date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate vehicle movement in and out of construction site
south
Day 89 of 92
Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street
Show moreStart date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate material and equipment deliveries plus various construction activities
north
Day 82 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 82 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 77 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 71 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 69 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 68 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 66 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 66 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 63 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 62 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 61 of 62
Streets affected: Marina Quays Boulevard between Sickle Avenue and Mervyn Thomas Drive (hold and release for 2 minutes maximum) and Mervyn Thomas Drive between Marina Quays Boulevard and Broadwater Avenue (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 6 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Rectification and maintenance works for development
north
Day 61 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 60 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 60 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 60 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 60 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 59 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 59 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 54 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 50 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 50 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 50 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 48 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 47 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 47 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 46 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 46 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 45 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 43 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 42 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 42 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 41 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 40 of 41
Streets affected: Bonogin Road (shoulder/verge, half road closure with hold and release for 2 minutes maximum) between Hersden Court and Bush Swallow Road
Show more
Start date: 27 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Removal of batter and widening of the shoulder to improve visibility for those exiting a driveway
north
Day 40 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 37 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 36 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 36 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 36 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 34 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 32 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 29 of 32
Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Avenue and Old Burleigh Road
Show moreStart date: 8 July 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 28 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 25 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 22 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 22 of 22
Streets affected: McLaren Road between Yarrimbah Drive and Mackellar Drive and also Oakdale Avenue between McLaren Road and Carnie Court (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 22 of 22
Streets affected: McLaren Road between Beaudesert Nerang Road and Oakdale Avenue/Winchester Drive and also Yarrimbah Drive between McLaren Road and Dugandan Street (lane, bike lane, verge/footpath closure with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 5 August 2019
Duration: 7:00am – 3:00pm
Reason: Removal and replacement of guardrail
north
Day 20 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 19 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 18 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 16 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 16 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 15 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 15 of 15
Streets affected: University Drive (verge/footpath and parking lane closure) between University Drive and Cottesloe Drive
Show more
Start date: 22 July 2019
End date: 5 August 2019
Duration: 6:30am – 5:30pm
Reason: Construction of a new bus stop
south
Day 15 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 15 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 15 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 14 of 16
Streets affected: Palm Beach Avenue (full road closure with detours) between Philippine Parade and Gold Coast Highway
Show more
Start date: 22 July 2019
End date: 7 August 2019
Duration: 7:30pm – 5:00am (night works)
Reason: Roadway profiling followed by asphalt layers to road pavement
south
Day 12 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 12 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 12 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 12 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 11 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 11 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 11 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 10 of 12
Streets affected: 1. Reserve Road between Goldcrest Drive and Pandanus Place 2. Brygon Creek Drive between Mockingbird Drive 3. Jessica Drive between Reserve Roa dand Jacob Court (lane, bike lane)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00am – 2:30pm
Reason: Installation of new bike posts and push button
north
Day 9 of 11
Streets affected: Ashmore Road between Boree Street and Tambourah Drive and Heeb Street between Ashmore Road and Tambourah Drive (bike lane, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 7:00pm – 6:00am
Reason: Install new footing for bike post and push button
north
Day 9 of 11
Streets affected: Gold Coast Highway between Railway Street and Marshall Lane and Nind Street between Scarborough Street and Gold Coast Highway (lane, bike lane closure)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00pm – 6:00am
Reason: Loop cutting works
north
Day 8 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 8 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 7 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 7 of 8
Streets affected: Victoria Parade (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Broadbeach Mall
Show more
Start date: 30 July 2019
End date: 6 August 2019
Duration: 6:30am – 5:30pm
Reason: Construct new pedestrian ramps and refuge island for pedestrian crossing
south
Day 7 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 7 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 7 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 6 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 6 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 6 of 6
Streets affected: Waterways Drive (shoulder, verge/footpath, lane, parking lane/bay closure) between Main Beach Parade and Gold Coast Highway
Show moreStart date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 6 of 6
Streets affected: Tedder Avenue (shoulder, verge/footpath, lane, bike lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Main Beach Parade and Montgomery Avenue
Show more
Start date: 31 July 2019
End date: 5 August 2019
Duration: 9:00am – 2:00pm
Reason: Facilitate potholing works
north
Day 6 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 5 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 5 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 5 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 5 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 4 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 2 of 5
Streets affected: Scarborough Street between White Street and Hinze Street and also Young Street between Garden Street and Scarborough Street (full road closure with detour and hold and release for 2 minutes maximum)
Show more
Start date: 4 August 2019
End date: 8 August 2019
Duration: Midnight – 4:00am
Reason: Facilitate line marking works for light rail corridor
north
Day 1 of 69
Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road
Show more
Start date: 5 August 2019
End date: 12 October 2019
Duration: Midnight – 11.59pm
Reason: Road upgrade outside new development site
north
Day 1 of 40
Streets affected: Christine Avenue between Bermuda Street and Silvabank Drive and also Mattocks Road between Christine Avenue and Mojave Drive (shoulder, verge/footpath, lane - slip /turning and bike lane road closure)
Show more
Start date: 5 August 2019
End date: 13 September 2019
Duration: 6:30am – 6.30pm
Reason: Construction of traffic islands and the installation of conduits
south
Day 1 of 5
Streets affected: Elysium Road / Eastlake Street roundabout (verge/footpath closure)
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 1 of 5
Streets affected: Mudgeeraba Road (parking lane/bay closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 1 of 5
Streets affected: Hinkler Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Elysium Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 1 of 5
Streets affected: Hinkler Drive (parking lane closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 1 of 5
Streets affected: San Fernando Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Hinkler Road and Dormello Drive
Show moreStart date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 1 of 20
Streets affected: Musgrave Avenue (full road with detour, bike lane) between Botanical Drive and Turpin Road
Show more
Start date: 5 August 2019
End date: 24 August 2019
Duration: 6:00pm – 6.00am
Reason: Pavement resurfacing works
north
Day 1 of 16
Streets affected: Thrower Drive (shoulder, lane, partial lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Tahiti Avenue and Luzone Parade
Show more
Start date: 5 August 2019
End date: 20 August 2019
Duration: 8:00pm – 5.00am
Reason: Loop cutting works
south
Day 267 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 251 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 186 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 143 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 97 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 91 of 93
Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate site sheds and material storage for development site
south
Day 91 of 93
Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction Works
south
Day 91 of 93
Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 91 of 93
Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Detour for one way of traffic to facilitate concrete pours
south
Day 90 of 92
Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreAlso affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue
Start date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate vehicle movement in and out of construction site
south
Day 90 of 92
Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street
Show moreStart date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate material and equipment deliveries plus various construction activities
north
Day 83 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 83 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 78 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 72 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 70 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 69 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 67 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 67 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 64 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 63 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 62 of 62
Streets affected: Marina Quays Boulevard between Sickle Avenue and Mervyn Thomas Drive (hold and release for 2 minutes maximum) and Mervyn Thomas Drive between Marina Quays Boulevard and Broadwater Avenue (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 6 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Rectification and maintenance works for development
north
Day 62 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 61 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 61 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 61 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 61 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 60 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 60 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 55 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 51 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 51 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 51 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 49 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 48 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 48 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 47 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 47 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 46 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 44 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 43 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 43 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 42 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 41 of 41
Streets affected: Bonogin Road (shoulder/verge, half road closure with hold and release for 2 minutes maximum) between Hersden Court and Bush Swallow Road
Show more
Start date: 27 June 2019
End date: 6 August 2019
Duration: 6:30am – 6:30pm
Reason: Removal of batter and widening of the shoulder to improve visibility for those exiting a driveway
north
Day 41 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 38 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 37 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 37 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 37 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 35 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 33 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 30 of 32
Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Avenue and Old Burleigh Road
Show moreStart date: 8 July 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 29 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 26 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 23 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 21 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 20 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 19 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 17 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 17 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 16 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 16 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 16 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 16 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 15 of 16
Streets affected: Palm Beach Avenue (full road closure with detours) between Philippine Parade and Gold Coast Highway
Show more
Start date: 22 July 2019
End date: 7 August 2019
Duration: 7:30pm – 5:00am (night works)
Reason: Roadway profiling followed by asphalt layers to road pavement
south
Day 13 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 13 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 13 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 13 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 12 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 12 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 12 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 11 of 12
Streets affected: 1. Reserve Road between Goldcrest Drive and Pandanus Place 2. Brygon Creek Drive between Mockingbird Drive 3. Jessica Drive between Reserve Roa dand Jacob Court (lane, bike lane)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00am – 2:30pm
Reason: Installation of new bike posts and push button
north
Day 10 of 11
Streets affected: Ashmore Road between Boree Street and Tambourah Drive and Heeb Street between Ashmore Road and Tambourah Drive (bike lane, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 7:00pm – 6:00am
Reason: Install new footing for bike post and push button
north
Day 10 of 11
Streets affected: Gold Coast Highway between Railway Street and Marshall Lane and Nind Street between Scarborough Street and Gold Coast Highway (lane, bike lane closure)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00pm – 6:00am
Reason: Loop cutting works
north
Day 9 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 9 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 8 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 8 of 8
Streets affected: Victoria Parade (shoulder, verge/footpath, lane, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Surf Parade and Broadbeach Mall
Show more
Start date: 30 July 2019
End date: 6 August 2019
Duration: 6:30am – 5:30pm
Reason: Construct new pedestrian ramps and refuge island for pedestrian crossing
south
Day 8 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 8 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 8 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 7 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 7 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 7 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 6 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 6 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 6 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 6 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 5 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 3 of 5
Streets affected: Scarborough Street between White Street and Hinze Street and also Young Street between Garden Street and Scarborough Street (full road closure with detour and hold and release for 2 minutes maximum)
Show more
Start date: 4 August 2019
End date: 8 August 2019
Duration: Midnight – 4:00am
Reason: Facilitate line marking works for light rail corridor
north
Day 2 of 69
Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road
Show more
Start date: 5 August 2019
End date: 12 October 2019
Duration: Midnight – 11.59pm
Reason: Road upgrade outside new development site
north
Day 2 of 40
Streets affected: Christine Avenue between Bermuda Street and Silvabank Drive and also Mattocks Road between Christine Avenue and Mojave Drive (shoulder, verge/footpath, lane - slip /turning and bike lane road closure)
Show more
Start date: 5 August 2019
End date: 13 September 2019
Duration: 6:30am – 6.30pm
Reason: Construction of traffic islands and the installation of conduits
south
Day 2 of 5
Streets affected: Elysium Road / Eastlake Street roundabout (verge/footpath closure)
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 2 of 5
Streets affected: Mudgeeraba Road (parking lane/bay closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 2 of 5
Streets affected: Hinkler Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Elysium Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 2 of 5
Streets affected: Hinkler Drive (parking lane closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 2 of 5
Streets affected: San Fernando Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Hinkler Road and Dormello Drive
Show moreStart date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 2 of 20
Streets affected: Musgrave Avenue (full road with detour, bike lane) between Botanical Drive and Turpin Road
Show more
Start date: 5 August 2019
End date: 24 August 2019
Duration: 6:00pm – 6.00am
Reason: Pavement resurfacing works
north
Day 2 of 16
Streets affected: Thrower Drive (shoulder, lane, partial lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Tahiti Avenue and Luzone Parade
Show more
Start date: 5 August 2019
End date: 20 August 2019
Duration: 8:00pm – 5.00am
Reason: Loop cutting works
south
Day 1 of 3
Streets affected: Leyte Avenue (verge/footpath, full road closure) between Luzon Parade and Tahiti Avenue
Show more
Start date: 6 August 2019
End date: 8 August 2019
Duration: 7:00am – 3.00pm
Reason: Energex maintenance works to replace 3 power poles
south
Day 268 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 252 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 187 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 144 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 98 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 92 of 93
Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate site sheds and material storage for development site
south
Day 92 of 93
Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction Works
south
Day 92 of 93
Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 92 of 93
Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Detour for one way of traffic to facilitate concrete pours
south
Day 91 of 92
Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreAlso affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue
Start date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate vehicle movement in and out of construction site
south
Day 91 of 92
Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street
Show moreStart date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate material and equipment deliveries plus various construction activities
north
Day 84 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 84 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 79 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 73 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 71 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 70 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 68 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 68 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 65 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 64 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 63 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 62 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 62 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 62 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 62 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 61 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 61 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 56 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 52 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 52 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 52 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 50 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 49 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 49 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 48 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 48 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 47 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 45 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 44 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 44 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 43 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 42 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 39 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 38 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 38 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 38 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 36 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 34 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 31 of 32
Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Avenue and Old Burleigh Road
Show moreStart date: 8 July 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 30 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 27 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 24 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 22 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 21 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 20 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 18 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 18 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 17 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 17 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 17 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 17 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 16 of 16
Streets affected: Palm Beach Avenue (full road closure with detours) between Philippine Parade and Gold Coast Highway
Show more
Start date: 22 July 2019
End date: 7 August 2019
Duration: 7:30pm – 5:00am (night works)
Reason: Roadway profiling followed by asphalt layers to road pavement
south
Day 14 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 14 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 14 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 14 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 13 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 13 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 13 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 12 of 12
Streets affected: 1. Reserve Road between Goldcrest Drive and Pandanus Place 2. Brygon Creek Drive between Mockingbird Drive 3. Jessica Drive between Reserve Roa dand Jacob Court (lane, bike lane)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00am – 2:30pm
Reason: Installation of new bike posts and push button
north
Day 11 of 11
Streets affected: Ashmore Road between Boree Street and Tambourah Drive and Heeb Street between Ashmore Road and Tambourah Drive (bike lane, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 7:00pm – 6:00am
Reason: Install new footing for bike post and push button
north
Day 11 of 11
Streets affected: Gold Coast Highway between Railway Street and Marshall Lane and Nind Street between Scarborough Street and Gold Coast Highway (lane, bike lane closure)
Show more
Start date: 27 July 2019
End date: 7 August 2019
Duration: 9:00pm – 6:00am
Reason: Loop cutting works
north
Day 10 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 10 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 9 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 9 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 9 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 9 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 8 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 8 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 8 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 7 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 7 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 7 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 7 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 6 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 4 of 5
Streets affected: Scarborough Street between White Street and Hinze Street and also Young Street between Garden Street and Scarborough Street (full road closure with detour and hold and release for 2 minutes maximum)
Show more
Start date: 4 August 2019
End date: 8 August 2019
Duration: Midnight – 4:00am
Reason: Facilitate line marking works for light rail corridor
north
Day 3 of 69
Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road
Show more
Start date: 5 August 2019
End date: 12 October 2019
Duration: Midnight – 11.59pm
Reason: Road upgrade outside new development site
north
Day 3 of 40
Streets affected: Christine Avenue between Bermuda Street and Silvabank Drive and also Mattocks Road between Christine Avenue and Mojave Drive (shoulder, verge/footpath, lane - slip /turning and bike lane road closure)
Show more
Start date: 5 August 2019
End date: 13 September 2019
Duration: 6:30am – 6.30pm
Reason: Construction of traffic islands and the installation of conduits
south
Day 3 of 5
Streets affected: Elysium Road / Eastlake Street roundabout (verge/footpath closure)
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 3 of 5
Streets affected: Mudgeeraba Road (parking lane/bay closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 3 of 5
Streets affected: Hinkler Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Elysium Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 3 of 5
Streets affected: Hinkler Drive (parking lane closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 3 of 5
Streets affected: San Fernando Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Hinkler Road and Dormello Drive
Show moreStart date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 3 of 20
Streets affected: Musgrave Avenue (full road with detour, bike lane) between Botanical Drive and Turpin Road
Show more
Start date: 5 August 2019
End date: 24 August 2019
Duration: 6:00pm – 6.00am
Reason: Pavement resurfacing works
north
Day 3 of 16
Streets affected: Thrower Drive (shoulder, lane, partial lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Tahiti Avenue and Luzone Parade
Show more
Start date: 5 August 2019
End date: 20 August 2019
Duration: 8:00pm – 5.00am
Reason: Loop cutting works
south
Day 2 of 3
Streets affected: Leyte Avenue (verge/footpath, full road closure) between Luzon Parade and Tahiti Avenue
Show more
Start date: 6 August 2019
End date: 8 August 2019
Duration: 7:00am – 3.00pm
Reason: Energex maintenance works to replace 3 power poles
south
6.30am - 6.30pm
Streets affected: Moora Street (full road closure with hold and release for 2 minutes maximum) between Cotlew Street and Kardella Street
Show more
Start date: 7 August 2019
End date: 7 August 2019
Duration: 6.30am – 6.30pm
Reason: Replacing power poles
north
Day 1 of 3
Streets affected: Manchester Road (full road closure with hold and release for 2 minutes maximum) between Nerang Broadbeach Road and Markeri Street/Riverbend Avenue
Show moreStart date: 7 August 2019
End date: 9 August 2019
Duration: 7am – 11am
Reason: Energex replacing cross arm and retensioning mains
north
Day 269 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 253 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 188 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 145 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 99 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 93 of 93
Streets affected: Winston Street (verge/footpath closure) between Coyne Street and Haig Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate site sheds and material storage for development site
south
Day 93 of 93
Streets affected: Winston Street (half road closure with hold and release for 2 minutes maximum) between Haig Street and Coyne Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction Works
south
Day 93 of 93
Streets affected: Haig Street (parking lane/bay closure) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 93 of 93
Streets affected: Haig Street (half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show moreStart date: 8 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: Detour for one way of traffic to facilitate concrete pours
south
Day 92 of 92
Streets affected: Seventeenth Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreAlso affected: Gold Coast Highway (parking lane/bay closure) Nineteenth Avenue and Seventeenth Avenue
Start date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate vehicle movement in and out of construction site
south
Day 92 of 92
Streets affected: Cannes Avenue (half road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and Genoa Street
Show moreStart date: 9 May 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate material and equipment deliveries plus various construction activities
north
Day 85 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 85 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 80 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 74 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 72 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 71 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 69 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 69 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 66 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 65 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 64 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 63 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 63 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 63 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 63 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 62 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 62 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 57 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 53 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 53 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 53 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 51 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 50 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 50 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 49 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 49 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 48 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 46 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 45 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 45 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 44 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 43 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 40 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 39 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 39 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 39 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 37 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 35 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 32 of 32
Streets affected: First Avenue (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Surf Avenue and Old Burleigh Road
Show moreStart date: 8 July 2019
End date: 8 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 31 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 28 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 25 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 23 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 22 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 21 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 19 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 19 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 18 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 18 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 18 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 18 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 15 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 15 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 15 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 15 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 14 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 14 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 14 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 11 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 11 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 10 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 10 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 10 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 10 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 9 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 9 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 9 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 8 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 8 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 8 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 8 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 7 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 5 of 5
Streets affected: Scarborough Street between White Street and Hinze Street and also Young Street between Garden Street and Scarborough Street (full road closure with detour and hold and release for 2 minutes maximum)
Show more
Start date: 4 August 2019
End date: 8 August 2019
Duration: Midnight – 4:00am
Reason: Facilitate line marking works for light rail corridor
north
Day 4 of 69
Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road
Show more
Start date: 5 August 2019
End date: 12 October 2019
Duration: Midnight – 11.59pm
Reason: Road upgrade outside new development site
north
Day 4 of 40
Streets affected: Christine Avenue between Bermuda Street and Silvabank Drive and also Mattocks Road between Christine Avenue and Mojave Drive (shoulder, verge/footpath, lane - slip /turning and bike lane road closure)
Show more
Start date: 5 August 2019
End date: 13 September 2019
Duration: 6:30am – 6.30pm
Reason: Construction of traffic islands and the installation of conduits
south
Day 4 of 5
Streets affected: Elysium Road / Eastlake Street roundabout (verge/footpath closure)
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 4 of 5
Streets affected: Mudgeeraba Road (parking lane/bay closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 4 of 5
Streets affected: Hinkler Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Elysium Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 4 of 5
Streets affected: Hinkler Drive (parking lane closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 4 of 5
Streets affected: San Fernando Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Hinkler Road and Dormello Drive
Show moreStart date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 4 of 20
Streets affected: Musgrave Avenue (full road with detour, bike lane) between Botanical Drive and Turpin Road
Show more
Start date: 5 August 2019
End date: 24 August 2019
Duration: 6:00pm – 6.00am
Reason: Pavement resurfacing works
north
Day 4 of 16
Streets affected: Thrower Drive (shoulder, lane, partial lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Tahiti Avenue and Luzone Parade
Show more
Start date: 5 August 2019
End date: 20 August 2019
Duration: 8:00pm – 5.00am
Reason: Loop cutting works
south
Day 3 of 3
Streets affected: Leyte Avenue (verge/footpath, full road closure) between Luzon Parade and Tahiti Avenue
Show more
Start date: 6 August 2019
End date: 8 August 2019
Duration: 7:00am – 3.00pm
Reason: Energex maintenance works to replace 3 power poles
south
Day 2 of 3
Streets affected: Manchester Road (full road closure with hold and release for 2 minutes maximum) between Nerang Broadbeach Road and Markeri Street/Riverbend Avenue
Show moreStart date: 7 August 2019
End date: 9 August 2019
Duration: 7am – 11am
Reason: Energex replacing cross arm and retensioning mains
north
Day 1 of 54
Streets affected: Michel Drive (half road closure with detour) between Elizabeth Street and Noojee Street
Show moreStart date: 8 August 2019
End date: 30 September 2019
Duration: 6:30am – 4.00pm
Reason: Stormwater upgrade
south
Day 1 of 6
Streets affected: King Parrot Court (half road closure with hold and release for 2 minutes maximum) between Henri Robert Drive and end of road
Show more
Start date: 8 August 2019
End date: 13 August 2019
Duration: 6:30am – 5.00pm
Reason: Pavement repairs
north
Day 1 of 8
Streets affected: Second Avenue (verge/footpath, half road closure with detours and hold and release) between Cypress Avenue and Laguna Avenue
Show more
Start date: 8 August 2019
End date: 15 August 2019
Duration: 7:00am – 3.00pm
Reason: Energex maintenance crews replacing power poles
south
Day 1 of 32
Streets affected: Yawalpah Road between Dixon Drive and Cox Road and also Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)
Show more
Start date: 8 August 2019
End date: 8 September 2019
Duration: 9:00am – 3.00pm
Reason: Installation of new footings for CCTV posts and pole
north
Day 1 of 23
Streets affected: Napper Road (half road closure with detours in place) between Christina Ryan Way/Wardley Drive and Chichester Drive/Uplands Drive
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 1 of 23
Streets affected: Tea Tree Boulevard (half road closure with detours in place) between Napper Road and Obrien Court
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 1 of 23
Streets affected: Christina Ryan Way (half road closure with hold and release) between Napper Road and Ingles Circuit
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 1 of 23
Streets affected: Wardley Drive (half road closure with hold and release) between Napper Road and Portland Court
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 1 of 23
Streets affected: Napper Road (lane closure with hold and release with Police Control) between Woodlands Way and Nina Parade
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 1 of 23
Streets affected: Captain Cook Drive (half road closure with hold and release) between Napper Road and Demand Avenue
Show more
Start date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 1 of 23
Streets affected: Parkwood Boulevard (half road closure with hold and release) between Napper Road and Peter Thomson Drive
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 270 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 254 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 189 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 146 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 100 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 86 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 86 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 81 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 75 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 73 of 73
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Caseys Road
Show moreStart date: 29 May 2019
End date: 9 August 2019
Duration: 7am – 5pm
Reason: New recycled water investigation - potholing stage
north
Day 72 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 70 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 70 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 67 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 66 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 65 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 64 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 64 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 64 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 64 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 63 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 63 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 58 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 54 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 54 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 54 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 52 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 51 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 51 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 50 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 50 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 49 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 47 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 46 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 46 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 45 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 44 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 41 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 40 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 40 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 40 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 38 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 36 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 32 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 29 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 26 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 24 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 23 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 22 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 20 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 20 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 19 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 19 of 19
Streets affected: Oyster Creek Drive (shoulder, half road closure with hold and release for 2 minutes maximum) between Pacific Motorway and Cowell Drive
Show moreStart date: 22 July 2019
End date: 9 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate geotechnical investigation work on behalf of Transport and Main Roads
south
Day 19 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 19 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 16 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 16 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 16 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 16 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 15 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 15 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 15 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 12 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 12 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 11 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 11 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 11 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 11 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 10 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 10 of 10
Streets affected: McCowan Street (shoulder, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Cotlew Street and Southport-Nerang Road
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 7:30am – 3:00pm
Reason: Facilitate borehole testing
north
Day 10 of 10
Streets affected: Parkwood Boulevard (shoulder, bike lane, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Davis Court and Casper Street and between Jack Nicklaus Way and Crampton Court
Show more
Start date: 31 July 2019
End date: 9 August 2019
Duration: 9:00am – 2:30pm
Reason: Borehole testing
north
Day 9 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 9 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 9 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 9 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 8 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 5 of 69
Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road
Show more
Start date: 5 August 2019
End date: 12 October 2019
Duration: Midnight – 11.59pm
Reason: Road upgrade outside new development site
north
Day 5 of 40
Streets affected: Christine Avenue between Bermuda Street and Silvabank Drive and also Mattocks Road between Christine Avenue and Mojave Drive (shoulder, verge/footpath, lane - slip /turning and bike lane road closure)
Show more
Start date: 5 August 2019
End date: 13 September 2019
Duration: 6:30am – 6.30pm
Reason: Construction of traffic islands and the installation of conduits
south
Day 5 of 5
Streets affected: Elysium Road / Eastlake Street roundabout (verge/footpath closure)
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 5 of 5
Streets affected: Mudgeeraba Road (parking lane/bay closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 5 of 5
Streets affected: Hinkler Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Elysium Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 5 of 5
Streets affected: Hinkler Drive (parking lane closure) between Mudgeeraba Road and Alkira Way
Show more
Start date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4:00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 5 of 5
Streets affected: San Fernando Drive (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Hinkler Road and Dormello Drive
Show moreStart date: 5 August 2019
End date: 9 August 2019
Duration: 7:00am – 4.00pm
Reason: Service location excavations with vacuum truck at various locations
north
Day 5 of 20
Streets affected: Musgrave Avenue (full road with detour, bike lane) between Botanical Drive and Turpin Road
Show more
Start date: 5 August 2019
End date: 24 August 2019
Duration: 6:00pm – 6.00am
Reason: Pavement resurfacing works
north
Day 5 of 16
Streets affected: Thrower Drive (shoulder, lane, partial lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Tahiti Avenue and Luzone Parade
Show more
Start date: 5 August 2019
End date: 20 August 2019
Duration: 8:00pm – 5.00am
Reason: Loop cutting works
south
Day 3 of 3
Streets affected: Manchester Road (full road closure with hold and release for 2 minutes maximum) between Nerang Broadbeach Road and Markeri Street/Riverbend Avenue
Show moreStart date: 7 August 2019
End date: 9 August 2019
Duration: 7am – 11am
Reason: Energex replacing cross arm and retensioning mains
north
Day 2 of 54
Streets affected: Michel Drive (half road closure with detour) between Elizabeth Street and Noojee Street
Show moreStart date: 8 August 2019
End date: 30 September 2019
Duration: 6:30am – 4.00pm
Reason: Stormwater upgrade
south
Day 2 of 6
Streets affected: King Parrot Court (half road closure with hold and release for 2 minutes maximum) between Henri Robert Drive and end of road
Show more
Start date: 8 August 2019
End date: 13 August 2019
Duration: 6:30am – 5.00pm
Reason: Pavement repairs
north
Day 2 of 8
Streets affected: Second Avenue (verge/footpath, half road closure with detours and hold and release) between Cypress Avenue and Laguna Avenue
Show more
Start date: 8 August 2019
End date: 15 August 2019
Duration: 7:00am – 3.00pm
Reason: Energex maintenance crews replacing power poles
south
Day 2 of 32
Streets affected: Yawalpah Road between Dixon Drive and Cox Road and also Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)
Show more
Start date: 8 August 2019
End date: 8 September 2019
Duration: 9:00am – 3.00pm
Reason: Installation of new footings for CCTV posts and pole
north
Day 2 of 23
Streets affected: Napper Road (half road closure with detours in place) between Christina Ryan Way/Wardley Drive and Chichester Drive/Uplands Drive
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 2 of 23
Streets affected: Tea Tree Boulevard (half road closure with detours in place) between Napper Road and Obrien Court
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 2 of 23
Streets affected: Christina Ryan Way (half road closure with hold and release) between Napper Road and Ingles Circuit
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 2 of 23
Streets affected: Wardley Drive (half road closure with hold and release) between Napper Road and Portland Court
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 2 of 23
Streets affected: Napper Road (lane closure with hold and release with Police Control) between Woodlands Way and Nina Parade
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 2 of 23
Streets affected: Captain Cook Drive (half road closure with hold and release) between Napper Road and Demand Avenue
Show more
Start date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 2 of 23
Streets affected: Parkwood Boulevard (half road closure with hold and release) between Napper Road and Peter Thomson Drive
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 1 of 39
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Sanctuary Cove Boulevard/Caseys Road
Show more
Start date: 9 August 2019
End date: 16 September 2019
Duration: 7:00am – 5.00pm
Reason: New recycled water investigation
north
Day 1 of 7
Streets affected: Pacific Avenue (half road closure with hold and release for 2 minutes maximum) between Ozone Parade and Oceanic Drive
Show more
Start date: 9 August 2019
End date: 15 August 2019
Duration: 9:00am – 3.00pm
Reason: Crack sealing works
south
Day 1 of 7
Streets affected: Pacific Avenue (half road closure with hold and release for 2 minutes maximum) between Ozone Parade and Oceanic Drive
Show more
Start date: 9 August 2019
End date: 15 August 2019
Duration: 9:00am – 3.00pm
Reason: Crack sealing works
south
Day 271 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 255 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 190 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 147 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 101 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 87 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 87 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 82 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 76 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 73 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 71 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 71 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 68 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 67 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 66 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 65 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 65 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 65 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 65 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 64 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 64 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 59 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 55 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 55 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 55 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 53 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 52 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 52 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 51 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 51 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 50 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 48 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 47 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 47 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 46 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 45 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 42 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 41 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 41 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 41 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 39 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 37 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 33 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 30 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 27 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 25 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 24 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 23 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 21 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 21 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 20 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 20 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 20 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north
Day 17 of 23
Streets affected: Salzburg Road (full road closure with detours) between Barry Street/McWang Road and Yawalpah Road
Show moreStart date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Road widening and reconstruction of intersection
north
Day 17 of 23
Streets affected: Yawalpah Road (lane, verge/footpath closure) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: Continuous
Reason: Construction of Stage 3 works on East Bound and West Bound Yawalpah Road carriageways
north
Day 17 of 92
Streets affected: Hedges Avenue (verge/footpath closure with hold and release for 2 minutes maximum) between Peerless Avenue and Alexandra Avenue
Show moreStart date: 25 July 2019
End date: 24 October 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction vehicle movement
south
Day 17 of 23
Streets affected: Yawalpah Road (hold and release) between Attenborough Boulevard and Old Pacific Highway
Show more
Start date: 25 July 2019
End date: 16 August 2019
Duration: 9.00 am to 2.30 pm
Reason: Construction vehicle ingress and egress
north
Day 16 of 36
Streets affected: Armstrong Way (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Ridgeline Way and Moroccan Street
Show more
Start date: 26 July 2019
End date: 30 August 2019
Duration: Continuous
Reason: Reconstruction of a retaining wall
north
Day 16 of 33
Streets affected: North Road (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Beechmont Road and Outlook Avenue
Show moreStart date: 26 July 2019
End date: 27 August 2019
Duration: Continuous
Reason: Reconstruction of a timber retaining wall
north
Day 16 of 30
Streets affected: Willow Street (verge/footpath, parking lane/bay closure with hold and release for 2 minutes maximum) between Coolibah Crescent and Eucalyptus Avenue
Show more
Start date: 26 July 2019
End date: 24 August 2019
Duration: 6:30am – 5:00pm
Reason: Replace kerb and channel in sections of the road
south
Day 13 of 13
Streets affected: Kingston Drive (half road closure with hold and release for 2 minutes maximum) between Habana Street and Nwheath Drive
Show more
Start date: 28 July 2019
End date: 10 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and sealing
north
Day 13 of 15
Streets affected: Tedder Avenue (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between 1. Peak Avenue and Lennie Avenue 2. Woodroffe Avenue and Hughes Avenue 3. Cronin Avenue and Peak Avenue 4. Breaker Street and Woodroffe Avenue
Show more
Start date: 29 July 2019
End date: 12 August 2019
Duration: 6:30am – 6:30pm
Reason: Install coloured surfacing works
north
Day 12 of 16
Streets affected: Nind Street (full road closure with detour) between Scarborough Street and Marine Parade
Show more
Start date: 29 July 2019
End date: 14 August 2019
Duration: 8:00pm – 6:00am
Reason: Profiling, resurfacing and asphalt works
north
Day 12 of 22
Streets affected: Stanmore Road (shoulder, verge/footpath, lane, bike lane closure) between Darlington Drive/Pagan Road and Turner Avenue
Show more
Start date: 30 July 2019
End date: 20 August 2019
Duration: 7:00am – 3:00pm
Reason: Installation of new guardrail
north
Day 12 of 15
Streets affected: Gold Coast Highway between Country Club Drive and Computer Street and also Marble Arch Place between Gold Coast Highway and Gentian Drive (verge/footpath, lane, parking lane/bay closure)
Show more
Start date: 30 July 2019
End date: 13 August 2019
Duration: 7:00am – 5:00pm
Reason: Facilitate potholing
north
Day 12 of 32
Streets affected: Galleon Way (verge/footpath, lane, parking lane/bay closure with hold and release for 2 minutes maximum) between Galleon Way and Guineas Creek Road
Show more
Start date: 30 July 2019
End date: 30 August 2019
Duration: 7:00am – 4:30pm
Reason: Updating pedestrian crossing, traffic islands and driveways
south
Day 11 of 48
Streets affected: Yaun Street (shoulder, verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Hickey Street and Lorenzo Drive
Show more
Start date: 31 July 2019
End date: 16 September 2019
Duration: 6:30am – 3:00pm
Reason: Placement of a double side inlet gully pit
north
Day 10 of 92
Streets affected: River Terrace (verge/footpath, full road closure with access for local residents) between Enderley Avenue and end of road
Show more
Start date: 1 August 2019
End date: 31 October 2019
Duration: Midnight – 11:59pm
Reason: Construction of an emergency storage on sewer gravity main
north
Day 10 of 30
Streets affected: Jabiru Avenue (full road closure with detour) between Burleigh Street and Avocet Avenue
Show more
Start date: 1 August 2019
End date: 30 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works and high pressure cleaning
south
Day 10 of 23
Streets affected: Intrepid Drive (half road closure with hold and release for 2 minutes maximum) between Tartan Court and Mayra Court
Show more
Start date: 1 August 2019
End date: 23 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining and cleaning
south
Day 10 of 15
Streets affected: Eastern Service Road between Stapylton-Jacobs Well Road and Maiella Street and Christensen Road between Christensen Road and Elliot Drive (half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 1 August 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road profiling and asphalt works
north
Day 9 of 32
Streets affected: Intersection of Racecourse Drive and Strathaird Road (verge/footpath, lane closure with hold and release for 2 minutes maximum) between Ashmore Road and Ken Russell Court
Show more
Start date: 1 August 2019
End date: 2 September 2019
Duration: 7:00pm – 5:00am
Reason: Signalised works upgrades
north
Day 6 of 69
Streets affected: Kristins Lane (full road closure with hold and release for 2 minutes maximum) between Kohl Street and Days Road
Show more
Start date: 5 August 2019
End date: 12 October 2019
Duration: Midnight – 11.59pm
Reason: Road upgrade outside new development site
north
Day 6 of 40
Streets affected: Christine Avenue between Bermuda Street and Silvabank Drive and also Mattocks Road between Christine Avenue and Mojave Drive (shoulder, verge/footpath, lane - slip /turning and bike lane road closure)
Show more
Start date: 5 August 2019
End date: 13 September 2019
Duration: 6:30am – 6.30pm
Reason: Construction of traffic islands and the installation of conduits
south
Day 6 of 20
Streets affected: Musgrave Avenue (full road with detour, bike lane) between Botanical Drive and Turpin Road
Show more
Start date: 5 August 2019
End date: 24 August 2019
Duration: 6:00pm – 6.00am
Reason: Pavement resurfacing works
north
Day 6 of 16
Streets affected: Thrower Drive (shoulder, lane, partial lane, bike lane, half road closure with hold and release for 2 minutes maximum) between Tahiti Avenue and Luzone Parade
Show more
Start date: 5 August 2019
End date: 20 August 2019
Duration: 8:00pm – 5.00am
Reason: Loop cutting works
south
Day 3 of 54
Streets affected: Michel Drive (half road closure with detour) between Elizabeth Street and Noojee Street
Show moreStart date: 8 August 2019
End date: 30 September 2019
Duration: 6:30am – 4.00pm
Reason: Stormwater upgrade
south
Day 3 of 6
Streets affected: King Parrot Court (half road closure with hold and release for 2 minutes maximum) between Henri Robert Drive and end of road
Show more
Start date: 8 August 2019
End date: 13 August 2019
Duration: 6:30am – 5.00pm
Reason: Pavement repairs
north
Day 3 of 8
Streets affected: Second Avenue (verge/footpath, half road closure with detours and hold and release) between Cypress Avenue and Laguna Avenue
Show more
Start date: 8 August 2019
End date: 15 August 2019
Duration: 7:00am – 3.00pm
Reason: Energex maintenance crews replacing power poles
south
Day 3 of 32
Streets affected: Yawalpah Road between Dixon Drive and Cox Road and also Swan Road between Yawalpah Road and Gainsborough Drive (lane closure with hold and release for 2 minutes maximum)
Show more
Start date: 8 August 2019
End date: 8 September 2019
Duration: 9:00am – 3.00pm
Reason: Installation of new footings for CCTV posts and pole
north
Day 3 of 23
Streets affected: Napper Road (half road closure with detours in place) between Christina Ryan Way/Wardley Drive and Chichester Drive/Uplands Drive
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 3 of 23
Streets affected: Tea Tree Boulevard (half road closure with detours in place) between Napper Road and Obrien Court
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 3 of 23
Streets affected: Christina Ryan Way (half road closure with hold and release) between Napper Road and Ingles Circuit
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 3 of 23
Streets affected: Wardley Drive (half road closure with hold and release) between Napper Road and Portland Court
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 3 of 23
Streets affected: Napper Road (lane closure with hold and release with Police Control) between Woodlands Way and Nina Parade
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 3 of 23
Streets affected: Captain Cook Drive (half road closure with hold and release) between Napper Road and Demand Avenue
Show more
Start date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 3 of 23
Streets affected: Parkwood Boulevard (half road closure with hold and release) between Napper Road and Peter Thomson Drive
Show moreStart date: 8 August 2019
End date: 30 August 2019
Duration: 6:00pm – 6.00am
Reason: Road profiling and asphalt works
north
Day 2 of 39
Streets affected: Santa Barbara Road (verge/footpath, parking lane/bay closure) between Hope Island Road and Sanctuary Cove Boulevard/Caseys Road
Show more
Start date: 9 August 2019
End date: 16 September 2019
Duration: 7:00am – 5.00pm
Reason: New recycled water investigation
north
Day 2 of 7
Streets affected: Pacific Avenue (half road closure with hold and release for 2 minutes maximum) between Ozone Parade and Oceanic Drive
Show more
Start date: 9 August 2019
End date: 15 August 2019
Duration: 9:00am – 3.00pm
Reason: Crack sealing works
south
Day 2 of 7
Streets affected: Pacific Avenue (half road closure with hold and release for 2 minutes maximum) between Ozone Parade and Oceanic Drive
Show more
Start date: 9 August 2019
End date: 15 August 2019
Duration: 9:00am – 3.00pm
Reason: Crack sealing works
south
Day 1 of 8
Streets affected: First Avenue (full road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 10 August 2019
End date: 17 August 2019
Duration: 6:30am – 6.30pm
Reason: To facilitate concrete pours
south
Day 272 of 399
Streets affected: Marine Parade (verge/footpath, parking lane/bay closure) between Ocean Street and Taylor Street
Show moreStart date: 13 November 2018
End date: 16 December 2019
Duration: 7am - 5pm
Reason: To facilitate works on Quota Park
north
Day 256 of 397
Streets affected: Waterways Drive (verge/footpath closure) between Gold Coast Highway and Main Beach Parade
Show moreStart date: 29 November 2018
End date: 30 December 2019
Duration: 6:30am - 6:30pm
Reason: To facilitate works at Pelican Beach
north
Day 191 of 438
Streets affected: Old Coach Road (half road closure with hold and release and/or portable traffic lights) between Kingsmore Boulevarde and Tallebudgera Creek Road
Show moreStart date: 1 February 2019
End date: 14 April 2020
Duration 1: 6:30am – 6:30pm (Hold and Release)
Duration 2: 6:30pm - 6:30am (Portable Traffic Lights)
Reason: Old Coach Road upgrade including major earthworks and realignment project
south
Day 148 of 175
CBUS Super Stadium - Events - NRL Season
Show moreCheltenham Drive (Westbound) - CLOSED - local access only.
Robina Station Road - CLOSED - buses only.
Stadium Drive - CLOSED - pedestrians only.
Game Dates:
17 March 2019 / 12 April 2019 / 21 April 2019 / 18 May 2019 / 14 June 2019
29 June 2019 / 21 July 2019 / 27 July 2019 / 16 August 2019 / 7 September 2019
Duration: 7am – 11:30pm
south
Day 102 of 124
Streets affected: Stanhill Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Anembo Street and Burra Street
Show more
Start date: 2 May 2019
End date: 2 September 2019
Duration: Midnight – 11.59pm
Reason: Associated construction activity for Green Bridge Project
north
Day 88 of 93
Streets affected: Twenty Third Avenue (verge/footpath closure) between Gold Coast Highway and end of road
Show more
Start date: 16 May 2019
End date: 16 August 2019
Duration: Midnight – 11:59pm
Reason: Continuous footpath closure to facilitate a safe working environment during construction activities
south
Day 88 of 93
Streets affected: Twenty Third Avenue (full road closure with hold and release for 2 minutes maximum) between Gold Coast Highway and End of road
Show moreStart date: 16 May 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Full road closure at end of road to facilitate construction activities when required for safety
south
Day 83 of 92
Streets affected: Seventh Avenue (parking lane/bay closure) between Cypress Avenue and Gold Coast Highway
Show moreStart date: 21 May 2019
End date: 20 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone
south
Day 77 of 93
Streets affected: Wharf Road (half road, full road, verge/footpath (Southern side) closure with hold and release for 2 minutes maximum) between Old Burleigh Road and End of road
Show moreStart date: 27 May 2019
End date: 27 August 2019
Duration: 12am – 11:59pm
Reason: To facilitate road works, concrete sub base and asphalt overlay
north
Day 74 of 185
Streets affected: Orchid Avenue (verge/footpath closure) between Cavill Avenue and Elkhorn Avenue
Show moreStart date: 30 May 2019
End date: 30 November 2019
(Thursdays only)
Duration: 7am – 10:30am
Reason: To facilitate placement of a large delivery vehicle for bulk beer deliveries
north
Day 72 of 357
Streets affected: Pearson Road between Darlington Drive and Computer Road (shoulder, half road, full road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreAlso affected: Link Drive, Dixon Street
Start date: 1 June 2019
End date: 22 May 2020
Duration 1: 12am – 11:59pm (Full Road Closure)
Duration 2: 6:30am - 6:30pm (Half Road with Hold and Release)
Reason: Upgrading of existing road infrastructure at the intersection
north
Day 72 of 92
Streets affected: Reserve Road (lane, verge/footpath, centre median closure with signage and barriers) between Sunpeaks Court and Lawson Street
Show moreStart date: 1 June 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm (and 6:30pm - 6:30am aftercare)
Reason: To facilitate intersection upgrade
north
Day 69 of 93
Streets affected: Old Burleigh Road between Margaret Avenue and George Avenue; Margaret Avenue between Old Burleigh Road and Surf Parade (verge/footpath closure)
Show moreStart date: 4 June 2019
End date: 4 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate placement of overhead pedestrian gantry
south
Day 68 of 123
Streets affected: Dandar Drive (shoulder and lane closure) between Kindra Avenue and Gurrah Avenue
Show more
Start date: 5 June 2019
End date: 5 October 2019
Duration: Midnight – 11:59pm
Reason: Lateral shift of traffic for protection of culvert asset
north
Day 67 of 93
Streets affected: Fifth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 6 June 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate egress and ingress of single body trucks reversing into the site to remove demolished building material
south
Day 66 of 93
Streets affected: Third Avenue between Gold Coast Highway and Jefferson Lane; Gold Coast Highway between Third Avenue and Fourth Avenue (half road, verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 66 of 93
Streets affected: Coyne Street (Works Zone Parking Permit) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 66 of 93
Streets affected: Coyne Street (verge/footpath and half road closure with hold and release for 2 minutes maximum) between Musgrave Street and Winston Street
Show more
Start date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe work environment during construction activities
south
Day 66 of 93
Streets affected: Jowett Street (lane closure with hold and release for 2 minutes maximum) between Yaun Street and Fortune Street
Show moreStart date: 7 June 2019
End date: 7 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries, ingress and egress of vehicles
north
Day 65 of 93
Streets affected: Fourth Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 8 June 2019
End date: 8 September 2019
Duration 1: 6:30am – 6:30pm (hold and release)
Duration 2: 9am - 2:30pm (half road closure)
Reason: To facilitate a safe work environment for construction activities
south
Day 65 of 93
Streets affected: Fourth Avenue (Works Zone Parking Permit) between Cypress Terrace and Gold Coast Highway
Show more
Start date: 8 June 2019
End date: 8 September 2019
Duration: 6:30am – 6:30pm
Reason: Designated parking spaces for vehicle loading and unloading and associated vehicle movements for construction site
south
Day 60 of 66
Streets affected: Brighton Parade (half road, verge/footpath closure with hold and release for 2 minutes maximum) between Biggs Place and Akes Avenue
Show moreStart date: 13 June 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works
north
Day 56 of 61
Streets affected: Claymore Crescent (half road closure with hold and release for 2 minutes maximum) between Balmoral Avenue and Cul de sac
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 6:30am – 6:30pm
Reason: Manhole access for relining works. Work will be conducted intermittently.
north
Day 56 of 93
Streets affected: Oxley Drive (verge/footpath and parking lane/bay) between Turana Street and Brady Drive
Show more
Start date: 17 June 2019
End date: 17 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate deliveries to construction site
north
Day 56 of 61
Streets affected: Connor Street (verge/footpath closure) between Ewart Street and Hill Avenue
Show moreStart date: 17 June 2019
End date: 16 August 2019
Duration: 7am – 5pm
Reason: Closure to park construction vehicles, as required, for home renovation / extension works
south
Day 54 of 92
Streets affected: Seventh Avenue (verge/footpath closure) between Cypress Avenue and Gold Coast Highway
Show more
Start date: 19 June 2019
End date: 18 September 2019
Duration: Continuous
Reason: To faciliate a safe environment during construction activities
south
Day 53 of 95
Streets affected: Philip Avenue (parking lane, verge/footpath and half road closure with hold and release for 2 minutes maximum) between Surf Parade and Old Burleigh Road
Show more
Start date: 20 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate a safe work environment during construction activities
south
Day 53 of 92
Streets affected: Seventh Avenue (half road closure with hold and release for 2 minutes maximum) between Cypress Terrace and Gold Coast Highway
Show moreStart date: 20 June 2019
End date: 19 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate construction activities
south
Day 52 of 92
Streets affected: Twenty Fourth Avenue (verge/footpath closure) between Gold Coast Highway and Cypress Terrace N
Show more
Start date: 21 June 2019
End date: 20 September 2019
Duration: Continuous
Reason: Facilitate a safe environment during construction activities
south
Day 52 of 92
Streets affected: Twenty Fourth Avenue (hold and release for 2 minutes maximum) between Cypress Terrace N and Gold Coast Highway
Show moreStart date: 21 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate safe movement of construction related vehicles
south
Day 51 of 59
Streets affected: Cavill Avenue (half road, parking lane/bay, shoulder closure with hold and release for 2 minutes maximum) between Ferny Avenue and Surfers Paradise Boulevarde
Show moreStart date: 22 June 2019
End date: 19 August 2019
Duration: 6:30am – 2pm
Reason: Geotechnical Pavement Investigation
north
Day 49 of 92
Streets affected: Golden Four Drive (bike lane, parking lane and half road closure with hold and release for 2 minutes maximum) between Archer Street and Johnston Street
Show moreStart date: 24 June 2019
End date: 23 September 2019
Duration: 6:30am – 6:30pm
Reason: Facilitate concrete pours for construction site
south
Day 48 of 88
Streets affected: Lakeview Boulevard (verge/footpath closure) between Hooker Boulevard and Lakes Esplanade
Show more
Start date: 25 June 2019
End date: 20 September 2019
Duration: 6:30am – 6:30pm
Reason: Closure required for location of traffic control and truck signage
south
Day 48 of 56
Streets affected: Hinkler Drive (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Barrine Drive and Explorers Way
Show moreStart date: 25 June 2019
End date: 19 August 2019
Duration: 7:00am – 5:00pm
Reason: Geotechnical pavement investigation
north
Day 47 of 62
Streets affected: Weemala Street (verge/footpath, half road closure with hold and release for 2 minutes maximum) between Stanhill Drive and Thomas Drive
Show moreStart date: 26 June 2019
End date: 26 August 2019
Duration: 6:30am – 6:30pm
Reason: Large deliveries and concrete pours. Trucks and construction vehicles entering and exiting the site
north
Day 46 of 54
Streets affected: Alto Terrace between Pagan Road and Pagan Road; Kismet Court between Alto Terrace and End of road (half road closure with hold and release for 2 minutes maximum)
Show moreStart date: 27 June 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical pavement investigation. Sampling soils drilled by a 4WD rig then backfilling and patching the hole.
north
Day 43 of 64
Streets affected: Nobby Parade (full road closure with detour) between Albion Avenue and Nundah Avenue
Show moreStart date: 30 June 2019
End date: 1 September 2019
Duration: 6:30am – 6:30pm
Reason: Installation of major stormwater culvert crossing
south
Day 42 of 62
Streets affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Gracilis Court and Killara Street
Show moreAlso affected: Simpsons Road (lane, partial lane, shoulder, parking lane/bay closure with hold and release for 2 minutes maximum) between Guineas Creek Road and Calcita Avenue
Start date: 1 July 2019
End date: 31 August 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate NBN works
south
Day 42 of 92
Streets affected: Norman Street (verge/footpath, parking lane/bay, half road closure with hold and release for 2 minutes maximum) between North Street and Railway Street
Show more
Start date: 1 July 2019
End date: 30 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate crane lifts, large deliveries and large construction vehicles entering and exiting site
north
Day 42 of 50
Streets affected: Quarry Road (parking lane/bay, half road closure with hold and release for 2 minutes maximum) between Stapylton Jacobs Well Road and Rossmanns Road
Show moreStart date: 1 July 2019
End date: 19 August 2019
Duration: 7am – 5pm
Reason: Geotechnical Pavement Investigation
north
Day 40 of 63
Streets affected: Darlington Drive (shoulder, verge/footpath closure) between Pearson Road and Dixon Street
Show moreStart date: 3 July 2019
End date: 3 September 2019
Duration: 12am – 11:59pm
Reason: To facilitate works to high pressure gas main
north
Day 38 of 118
Streets affected: The Esplanade (bike lane, shoulder, verge/footpath, parking lane/bay and half road closure with hold and release for 2 minutes maximum) between Ferny Avenue and View Avenue
Show moreStart date: 5 July 2019
End date: 30 October 2019
Duration: 6:30am – 5:30pm
Reason: Shoulder and parking closure for new ocean way and sand By-pass pipe
north
Day 34 of 60
Streets affected: Elizabeth Avenue (half road closure with hold and release for 2 minutes maximum) between Old Burleigh Road and Surf Parade
Show more
Start date: 9 July 2019
End date: 6 September 2019
Duration: 6:30am – 6:30pm
Reason: To facilitate daily concrete pours for development
south
Day 31 of 92
Streets affected: Justin Lane (full road closure with hold and release for 2 minutes maximum) between West Street and Connor Street
Start date: 12 July 2019
End date: 11 October 2019
Duration: 1:00pm – 5:00pm
Reason: Facilitate refurbishment works to restaurant fronting the Gold Coast Highway
south
Day 28 of 32
Streets affected: Thomas Drive between Weemala Street and Parnoo Street and Burra Street between Parnoo Street and Mawarra Street (bike shared lane, shoulder, lane detour, verge/footpath, parking lane/bay closures with hold and release for 2 minutes maximum)
Show more
Start date: 15 July 2019
End date: 15 August 2019
Duration: 6:30am – 5:00pm
Reason: Installation of fibre services
north
Day 26 of 62
Streets affected: Helensvale Road between Hannaford Place and Siganto Drive; Woodside Place between Helensvale Road and End of road (verge/footpath, partial lane closure)
Show moreDuration 1: 6:30am – 6:30pm
Also affected: Siganto Drive between Grey Gum Street and Helensvale Road; Helensvale Road between Shepparton Road and Hannaford Place (partial lane, verge/footpath, shoulder closure)
Duration 2: 9am - 2:30pm
Start date: 17 July 2019
End date: 16 September 2019
Reason: NBN works
north
Day 25 of 93
Streets affected: Stanhill Drive between Dalpura Street and Parneno Street (intermittent full road road closure) and Kalyan Street between Stanhill Drive and Parneno Street (half road closure)
Show more
Start date: 18 July 2019
End date: 18 October 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 24 of 74
Streets affected: Valhalla Court between The Panorama and End of road; Xanadu Court between Valhalla Court and End of road (verge/footpath closure with hold and release for 2 minutes maximum)
Show moreStart date: 19 July 2019
End date: 30 September 2019
Duration: 6:30am – 5:30pm
Reason: To facilitate ingress and egress of trucks for stormwater drainage improvements
north
Day 22 of 32
Streets affected: Pacific Street (parking lane/bay closure opposite work zone) between Breaker Street and Main Beach Road
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Construction activities
north
Day 22 of 32
Streets affected: Pacific Street (parking lane/bays) between Tedder Avenue and Cable Street
Show more
Start date: 21 July 2019
End date: 21 August 2019
Duration: 6:30am – 6:30pm
Reason: Works Zone Parking Permit
north
Day 21 of 25
Streets affected: Warner Street (full road closure with hold and release for 2 minutes maximum and access for local residents and businesses) between Chalk Street and Scott Street
Show more
Start date: 21 July 2019
End date: 15 August 2019
Duration: 6:00pm – 6:00am
Reason: Road reseal
south
Day 21 of 27
Streets affected: Ward Street between Marine Parade and Boundary Street and also Petrie Street between Marine Parade and Boundary Street (verge/footpath, shoulder, half road closure with hold and release for 2 minutes maximum)
Show more
Start date: 22 July 2019
End date: 17 August 2019
Duration: 6:30am – 6:30pm
Reason: Potholing for road reconstruction project
south
Day 21 of 39
Streets affected: Wardoo Street (half road closure with hold and release for 2 minutes maximum) between Sungold Avenue and Woomera Crescent
Show more
Start date: 22 July 2019
End date: 29 August 2019
Duration: 9:00am – 2:00pm
Reason: Stormwater and Swale Drain upgrade
north